Loading...
CM-2024-189 - 7/5/2024Contract Quantity Adjust., nt/Change Order �awo�aa� ��.•. ftv. m(u Department: PARD Project Name: Mickie Krebsbach Slide Tower Replacement City Project ID Number Date: 6/13/24 Change Order/Quantity Adjustment No. 1 Page I of i Vendor Partners RenxxJding, Restoration WaLeM 3219 Harpers Ferry Lane Austin TX 78745 512.825.3950 Company Name Address Phone No. 3ustifitat)on Original contracto was to replace the slide tower stair and platform treads only. After removing the stairs and platforms, additional damage was noted on the support structure. This Change Order includes the extra metal fabrication and welding required to address those additional concerns. Additionally, this Change Order includes removing the shade structure at the top landing of the slide towner and replacing it at the end of the project SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Ad)ustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by ttits Quan. Adj./Change Order: New Conbraet Time: 30 days __ 30 days 60 days 0% $10,800.00 23% $10 800.00 23% $58 800.00 $10,800.00 Pat 13esa Co -Owner Partners Remodeling Restoration and Waterproofing LLC 611312024 Contractor: Signature Printed Name, Title, Company Date City Project Mayor/City Manaaer Signature -2 z�-iPJ r c SAik, , Oxiz- UlEy. Printed Name, K. .1.I.z Page 2 of i itContract Quantity Adjustment/Change Order 'n SI k6 Project Name: Miokie Krebsbach Slide Tower Replaoement Quan. Ad)./Change Order No.: Chanae Order Data 1 1 7.II�� ii111111 I ,ditkmnal Metal Fatmication, welding, and - structure1 :41 fl i :�11 11 tl 1 1'1 1 1�1 _- 1 11 �- 1 11 rl 1 1 _- 1 11 1 ! 1 Page i of A $-n-w Contract Quantity Adjustment/Change Order I Ni Y A 16 Project Name: Midue Krebsbach Slide Tower Replacement Quan. Adj./Change Order No.: rIIIs.�LL� .- _ . - .- •r I I _- 71 III MEMEMEME alit _- 1 1 I _- MEMMOMMIMI I