CM-2024-189 - 7/5/2024Contract Quantity Adjust., nt/Change Order
�awo�aa� ��.•.
ftv. m(u
Department: PARD
Project
Name: Mickie Krebsbach Slide Tower Replacement
City Project
ID Number
Date: 6/13/24
Change Order/Quantity
Adjustment No.
1
Page I of i
Vendor Partners RenxxJding, Restoration WaLeM 3219 Harpers Ferry Lane Austin TX 78745 512.825.3950
Company Name Address Phone No.
3ustifitat)on
Original contracto was to replace the slide tower stair and platform treads only. After removing the stairs and platforms, additional damage
was noted on the support structure. This Change Order includes the extra metal fabrication and welding required to address those additional
concerns. Additionally, this Change Order includes removing the shade structure at the top landing of the slide towner and replacing it at the
end of the project
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Ad)ustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price (Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)):
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by ttits Quan. Adj./Change Order:
New Conbraet Time:
30 days __
30 days
60 days
0%
$10,800.00 23%
$10 800.00 23%
$58 800.00
$10,800.00
Pat 13esa Co -Owner Partners Remodeling Restoration and Waterproofing LLC 611312024
Contractor:
Signature Printed Name, Title, Company Date
City Project
Mayor/City
Manaaer
Signature
-2 z�-iPJ
r c SAik, , Oxiz- UlEy.
Printed Name,
K.
.1.I.z
Page 2 of i
itContract Quantity Adjustment/Change Order
'n SI k6
Project Name: Miokie Krebsbach Slide Tower Replaoement
Quan. Ad)./Change Order No.:
Chanae Order Data
1
1 7.II��
ii111111
I
,ditkmnal Metal Fatmication, welding,
and - structure1
:41 fl
i :�11 11
tl
1 1'1
1 1�1
_-
1 11
�-
1 11
rl 1 1
_-
1 11
1 ! 1
Page i of A
$-n-w
Contract Quantity Adjustment/Change Order
I Ni
Y A 16
Project Name: Midue Krebsbach Slide Tower Replacement
Quan. Adj./Change Order No.:
rIIIs.�LL�
.- _ .
- .-
•r
I
I
_-
71 III
MEMEMEME
alit
_-
1 1 I
_-
MEMMOMMIMI I