Loading...
R-2024-188 - 7/25/2024 RESOLUTION NO. R-2024-188 WHEREAS, the City of Round Rock ("City") has previously determined in Resolution No. R-2024-010 that "Competitive Sealed Proposal' is the delivery method which provides the best value for the Brushy Creek Regional Wastewater System East WWTP Tertiary Filters Project, and WHEREAS, after advertising for and receiving proposals from offerors, the City of Round Rock determines that Keeley Construction Group, Inc. is the offeror which offers the best value for the City, and WHEREAS, the City Council now wishes to enter into a "Standard Form of Agreement Between Owner and Contractor" with Keeley Construction Group, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That, after advertising for and receiving proposals from offerors, the City of Round Rock hereby finds that Keeley Construction Group, Inc. is the offeror which offers the best value for the City for the Brushy Creek Regional Wastewater System East WWTP Tertiary Filters Project. BE IT FURTHER RESOLVED, That the Mayor is hereby authorized and directed to execute on behalf of the City a "Standard Form of Agreement Between Owner and Contractor" with Keeley Construction Group, Inc. for the Brushy Creek Regional Wastewater System East WWTP Tertiary Filters Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. 0112.20242:U94-02384") RESOLVED this 25th day of July, 2024. CRAIG ORGA Mayor City of Round R k, Texas ATTEST: q, '� a,: 1� MEAGAN SPI , City Clerk 2 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services BY: A.Ho 3400 Sunrise Road DATE: May 22,2024 Round Rock,Texas 78665 BID TABULATION PROJECT: Brushy Creek Regional Wastewater System East Plant Tertiary Filters LOCATION: Virtual Teams Company Name: Keeley Construction Thalle Construction Co.,Inc. BID DATE: 5/22/2024 10:00 AM Statement of Safety?Yes Statement of Safety?Yes Addendum(s)? Addendum(s)? Bid Bond? Yes Bid Bond? Yes APPROX ITEM# QTY. UNIT UNIT PRICE COST UNIT PRICE COST 1 Bonds,Mobilization,and Insurance 1 LS $300,000.00 $300,000.00 $590,000.00 $590,000.00 2 Stormwater pollution prevention plan and maintenance 1 LS $15,000.00 $15,000.00 $15,000.00 $15,000.00 3 Furnish and install labor,materials,equipment,for Filter Basin and Associated Site/Civil 1 LS $2,000,000.00 $2,000,000.00 $6,154,374.00 $6,154,374.00 4 Raise walls on existing junction boxes and chlorine contact basin 1 LS $155,000.00 $155,000.00 $650,000.00 $650,000.00 5 Installation,testing,and startup of Aqua-Aerobic MegaDisk filters 1 LS 1 $230,000.00 $230,000.00 $200,000.00 $200,000.00 6 Storage of Aqua-Aerobic MegaDisk filters 1 LS $25,000.00 $25,000.00 $20,000.00 $20,000.00 7 Furnish and install labor,materials,equipment,for 84"FRP lines 1 LS $675,000.00 $675,000.00 $425,000.00 $425,000.00 8 Furnish and install labor,materials,equipment,for 48"FRP lines 1 LS $670,000.00 $670,000.00 $515,000.00 $515,000.00 9 Furnish and install labor,materials,equipment,for 24"FRP lines 1 LS $102,000.00 $102,000.00 $75,000.00 $75,000.00 10 84"diameter BFV operator manholes 2 EA $48,000.00 $96,000.00 $50,000.00 $100,000.00 11 48"butterfly valves with Rotork IQ series actuators 2 EA $98,000.00 $196,000.00 $85,000.00 $170,000.00 12 84"x 84"slide gates with Rotork IQ series actuators 2 EA $125,000.00 $250,000.00 $110,000.00 $220,000.00 13 54"x 54"slide gates with Rotork IQ series actuators 1 EA $73,000.00 $73,000.00 $65,000.00 $65,000.00 14 48"x 48"slide gates with Rotork IQ series actuators 4 EA $50,000.00 $200,000.00 $63,000.00 $252,000.00 15 36"x 48"slide gate with Rotork IQ series actuators 1 EA $45,000.00 $45,000.00 $60,000.00 $60,000.00 16 Trench safety 1 LS $30,000.00 $30,000.00 $1,000.00 $1,000.00 17 Bypass pumping and temporary construction sequencing 1 LS $870,000.00 $870,000.00 $150,000.00 $150,000.00 18 2-ton Bridge Crane 1 EA $47,000.00 $47,000.00 $100,000.00 $100,000.00 19 Electrical and Instnunentaiton Improvements associated with Tertiary Filters 1 LS $1,800,000.00 $1,800,000.00 $1,500,000.00 $1,500,000.00 20 SCADA and instrumentation programming and integration 1 LS $130,000.00 $130,000.00 $100,000.00 $100,000.00 21 All other items not included elsewhere 1 LS $215,000.00 $215,000.00 $10,000.00 $10,000.00 22 Owner's allowance for unanticpated costs 1 LS $50,000.00 $50,000.00 $50,000.00 $50,000.00 TOTAL BASE BID 58,174,000.00 $11,422,374.00 1 Hot mix asphaltic concrete pavement,2",type D. 1 LS $145,000.00 $145,000.00 $100,000.00 $100,000.00 2 Flexbase(10") 1 LS $125,000.00 $125,000.00 $50,000.00 $50,000.00 3 Demo of Existing Pavement 1 LS $35,000.00 $35,000.00 $25,000.00 $25,000.00 4 12"PVC line for NPW service to FC 14,including PRV vault 1 LS $135,000.00 $135,000.00 $225,000.00 $225,000.00 TOTAL ALT BID $440,000.00 $400,000.00 TOTAL $8,614,000.00 $11,822,374.00 1 PLUMMER 6/26/2024 Michael Thane, P.E. Director of Utilities and Environmental Services City of Round Rock 3400 Sunrise Road Round Rock, TX 78665 Re: Brushy Creek Regional Wastewater System East WWTP Tertiary Filters Engineer's Recommendation of Award of Contract A total of two sealed proposals were received and opened on May 22, 2024 for the above referenced project. The base bids ranged from $8,174,000.00 to $11,422,374.00. Keeley Construction Group, Inc. principal office of New Braunfels, Texas submitted the highest ranked proposal. Their base bid plus bid alternate no. 4 is in the amount of$8,309,000.00. After reviewing the contractor's experience and bid price, I recommend award of this project to Keeley Construction Group, Inc. in the amount of$8,309,000.00. Sincerely, &",— 4)i� Perran S. Hutton, P.E. Project Manager Plummer Associates, Inc. Enclosures cc: Rebecca Vento, P.E., Project Manager, City of Round Rock Project File 6300 La Calma Drive Suite 400 Austin,TX 78752 Phone 512.452.5905 Plummei.com TBPE Firm No.13 00 IJ jf 40' 1d lot _ I _ r 79 i "' s Project Location °� �+ a Brushy:.Creek Regional Wastewater, .: • sSyst`ems East WWTP • ' � �'� '7 , � +i = � s � Af �►= F t ' * ` 444 L' i Date:1/2/2024 BCRWWS Tertiary Filter Project,.