CM-2024-200 - 7/26/2024 Page I of t
Contract Quantity Adjustment/Change Order
�M�oa�n us
w.OU li
Department: PARD
Project
Name: OSP Practice Field Improvement Project 2024 _ Date: 6113/24 �w
City Project Change Order/Quantity
ID Number Adjustment No. 1
Vendor Utz Environmental Services 10948 E.Crystal Fall Pkwy,Leander,TX 78641
Company Name Address Phone No.
Justification
This item includes a change in controller type-the controller specified was supposed to be discontinued,so the contractor bid the newer
version. However,since OSP has several of the specified controller in the park,the manufacturer has agreed to continue providing them for
the park. Additionally,PARD made the decision to no longer plant trees around the field so there was a decrease In the Irrigation amount and
credit for excavation of the the tree pits. Finally,the controller was designed to be located In an existing enclosure, but the concrete needs to
be removed to all access to the enclosure.
SUMMARY Amount %Change
Original Contract Shite: $121437.00
Previous Quantity AdjWrnent(s):
This Quantity Adjustment: $0.00
Total Quantity Adjustment(s): $0.00
Total Contract Price with Quantity Adjustment(s): $121 437.00
Previous Change Order(s):
0%
This Change Order: $5,013.00 4%
Total Change Order(s)To Hate: 15,013.00 4%
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s)Plus Change Order(s)): $126,450.00
Difference between Original and Adjusted Contract Prices: $5,013.00
Original Contract Time: 45
Time Adjustment by previous Quan.Adj./Change Order: 0
Time Adjustment by this Quan.Adj./Change Order: 0
New Contract Time: 45
Prepared ey: §AP)M= , _ r/7�.1L f/Gy' AiV-
cure Printed Name,Title,Company Dat
als
Contractor: ",�1 Chris Utz- President - Utz Environmental Services 6/13/2024
Signature Printed Name,Title,Company Date
City Project t
Manager: 24
'gnature Printed Name,Title f ) Date
mayot/oMa agerty N �i.Rz/�q,� IJ.3'�f T Cid 7!�IOV
Signature Printed Name,Title Date
M,),02 _ :2,00
Page 2 of I
Contract Quantity Adjustment/Change Order
■ou�+�aae �.
x+.oi,ic
Project Name: OSP Practice Field Improvement Project 2024
Quan.Adj./Change Order No.: 1
Change Order Data
MA
Control
Time
Adjustment
Item 9 item Description Unit Unit Price Amount
MWE
Demo concrete,core slab, install sleeves
L for controller, 2eur concrete LS i $3,950.00 ;3,950.00
Irrigation controller add and tree bUbbleF
2 removal EA 1 $4,050.00 $4,00.00
3 Delete tree hole excavation and haul off LS 1 2,987.00 -#2,967.00
bo
$0.00
$0.00
P.
$0.00
00
;0.00
#0.00
.001
.00
xo.oa
s -
00
. o
$5,013.001 U
Page I of 3
Contract Quantity Adjustment/Change Order
wy S. li
Project Name: OSP Practice Field Improvement Project 2024
Quan.Adj./Change Order No.: i
uan ' Adjustment Data
Contract
Time
Bid Item 0 Item Description Unit Unit Price Amount Adjustment
;0.00
;0.00
;0.00
0.00
$0.00
;0.00
0.00
.o
;0.
0.001
0.
;0.00
$0.00
;0.00
$0.00
$0.00
;0.00
;0.00
5 .
50.00