Loading...
CM-2024-200 - 7/26/2024 Page I of t Contract Quantity Adjustment/Change Order �M�oa�n us w.OU li Department: PARD Project Name: OSP Practice Field Improvement Project 2024 _ Date: 6113/24 �w City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Utz Environmental Services 10948 E.Crystal Fall Pkwy,Leander,TX 78641 Company Name Address Phone No. Justification This item includes a change in controller type-the controller specified was supposed to be discontinued,so the contractor bid the newer version. However,since OSP has several of the specified controller in the park,the manufacturer has agreed to continue providing them for the park. Additionally,PARD made the decision to no longer plant trees around the field so there was a decrease In the Irrigation amount and credit for excavation of the the tree pits. Finally,the controller was designed to be located In an existing enclosure, but the concrete needs to be removed to all access to the enclosure. SUMMARY Amount %Change Original Contract Shite: $121437.00 Previous Quantity AdjWrnent(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $121 437.00 Previous Change Order(s): 0% This Change Order: $5,013.00 4% Total Change Order(s)To Hate: 15,013.00 4% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)): $126,450.00 Difference between Original and Adjusted Contract Prices: $5,013.00 Original Contract Time: 45 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 45 Prepared ey: §AP)M= , _ r/7�.1L f/Gy' AiV- cure Printed Name,Title,Company Dat als Contractor: ",�1 Chris Utz- President - Utz Environmental Services 6/13/2024 Signature Printed Name,Title,Company Date City Project t Manager: 24 'gnature Printed Name,Title f ) Date mayot/oMa agerty N �i.Rz/�q,� IJ.3'�f T Cid 7!�IOV Signature Printed Name,Title Date M,),02 _ :2,00 Page 2 of I Contract Quantity Adjustment/Change Order ■ou�+�aae �. x+.oi,ic Project Name: OSP Practice Field Improvement Project 2024 Quan.Adj./Change Order No.: 1 Change Order Data MA Control Time Adjustment Item 9 item Description Unit Unit Price Amount MWE Demo concrete,core slab, install sleeves L for controller, 2eur concrete LS i $3,950.00 ;3,950.00 Irrigation controller add and tree bUbbleF 2 removal EA 1 $4,050.00 $4,00.00 3 Delete tree hole excavation and haul off LS 1 2,987.00 -#2,967.00 bo $0.00 $0.00 P. $0.00 00 ;0.00 #0.00 .001 .00 xo.oa s - 00 . o $5,013.001 U Page I of 3 Contract Quantity Adjustment/Change Order wy S. li Project Name: OSP Practice Field Improvement Project 2024 Quan.Adj./Change Order No.: i uan ' Adjustment Data Contract Time Bid Item 0 Item Description Unit Unit Price Amount Adjustment ;0.00 ;0.00 ;0.00 0.00 $0.00 ;0.00 0.00 .o ;0. 0.001 0. ;0.00 $0.00 ;0.00 $0.00 $0.00 ;0.00 ;0.00 5 . 50.00