CM-2024-227 - 8/30/2024Pogo I of 3
1-101 Contract QuentltV Adjustment/Change Order
n,, 01136
Department: PARD
Project
Name., Heritage Trall West Date: IZII124
City Project Change Order/Quantity
ID Number Adjustment No. 4
Vendor Patin Construction 38M W. Second St, T or, Texas 76574 512.269,1071
Company Name Address Phone No.
Justification
the plans show a portion of the project to be Irrigated. However the tap, meter, controller, etc. were shown on a plan sheet that was removed
rom the construction project due to the original project funding. The entire sheet was marked as "Not in Contract" and no one noticed that
he Irrigation connection was induded on that sheet. Additionally, the CO Includes adding rock to the flood gates along Chisholm Trall Road.
lfter Installation, It was determined that these gates took away from the aesthetics of the area, Including in front of residences. This will also
nclude painting the gates to blend in with the wrought Iron fence behind. Finally, this indudes updated the slgnage on the wall at the park to
110olm Trail Crossing Park rather than Herda a Trail.
SUMMARY
Original Contract Price:
Previous Quanbty Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustrmt(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Qrder(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contraet Price [Original Contract Price Pius
Quantity Adjustments) Plus Change Order(s)j:
Difference between Original and Adjusted Contract Prices:
Original Contract Tlme:
Tlme Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan, Adj./Change Order:
New Contract Time:
Amount % Chance
$1,573,775.00 8%
$41,925.00 0%
1615 700.00 8%
1 115 700.00
$1,615,700.00
480 days
15
115
610 days
hxe
Printed Name, Title, Company
Date
Contractor:
Jeff Birkhead, Chief Estimator, Patin Construction
4-11-2024
Sig ture
Printed Name, Title, Company
Date
City Project
i
er:
Manar er
Manager
Signal e L
itd/ ( v,
Printed Name},,,Tate
LPi co ! � 1 . � J� %,-,
Date
�_ � —2h
N2oZ`�, 2Z77
,aol II.F4 Contract Quantity Ad justment/CharW Order
,w, oulf
Project Name: Heritage Trap West
Quan. Adj./Change Order No.:
Macrae Order Date
Pap 2 of "
1
a:
7-M. l: _ . 11171.�1
ea
11! 11
Noma-UM1111
--
TI 1'1
71 F�1
71 ITI
-_
__-
•1 ITI
1 11
1 tl
I
�-
1 i•1
Contract Quantity Adjustment/Change Order
�.oarr ....
m. au u
Project Name- Heritage Tran West
Quen. Adj.Xhange Order No.: 4
uantkv Adiustment Data
I 1'1
11 ITi
I JI
Page 3 of