CM-2024-227 - 8/30/2024Pogo I of 3 1-101 Contract QuentltV Adjustment/Change Order n,, 01136 Department: PARD Project Name., Heritage Trall West Date: IZII124 City Project Change Order/Quantity ID Number Adjustment No. 4 Vendor Patin Construction 38M W. Second St, T or, Texas 76574 512.269,1071 Company Name Address Phone No. Justification the plans show a portion of the project to be Irrigated. However the tap, meter, controller, etc. were shown on a plan sheet that was removed rom the construction project due to the original project funding. The entire sheet was marked as "Not in Contract" and no one noticed that he Irrigation connection was induded on that sheet. Additionally, the CO Includes adding rock to the flood gates along Chisholm Trall Road. lfter Installation, It was determined that these gates took away from the aesthetics of the area, Including in front of residences. This will also nclude painting the gates to blend in with the wrought Iron fence behind. Finally, this indudes updated the slgnage on the wall at the park to 110olm Trail Crossing Park rather than Herda a Trail. SUMMARY Original Contract Price: Previous Quanbty Adjustment(s): This Quantity Adjustment: Total Quantity Adjustrmt(s): Total Contract Price with Quantity Adjustment(s): Previous Change Qrder(s): This Change Order: Total Change Order(s) To Date: Adjusted Contraet Price [Original Contract Price Pius Quantity Adjustments) Plus Change Order(s)j: Difference between Original and Adjusted Contract Prices: Original Contract Tlme: Tlme Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan, Adj./Change Order: New Contract Time: Amount % Chance $1,573,775.00 8% $41,925.00 0% 1615 700.00 8% 1 115 700.00 $1,615,700.00 480 days 15 115 610 days hxe Printed Name, Title, Company Date Contractor: Jeff Birkhead, Chief Estimator, Patin Construction 4-11-2024 Sig ture Printed Name, Title, Company Date City Project i er: Manar er Manager Signal e L itd/ ( v, Printed Name},,,Tate LPi co ! � 1 . � J� %,-, Date �_ � —2h N2oZ`�, 2Z77 ,aol II.F4 Contract Quantity Ad justment/CharW Order ,w, oulf Project Name: Heritage Trap West Quan. Adj./Change Order No.: Macrae Order Date Pap 2 of " 1 a: 7-M. l: _ . 11171.�1 ea 11! 11 Noma-UM1111 -- TI 1'1 71 F�1 71 ITI -_ __- •1 ITI 1 11 1 tl I �- 1 i•1 Contract Quantity Adjustment/Change Order �.oarr .... m. au u Project Name- Heritage Tran West Quen. Adj.Xhange Order No.: 4 uantkv Adiustment Data I 1'1 11 ITi I JI Page 3 of