Loading...
CM-2024-223 - 8/30/2024STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: BGE, INC. ("Engineer") ADDRESS: 101 West Louis Henna Boulevard, Suite 400, Austin, TX 78728 PROJECT: Chisholm Trail Road This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and BGE, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of June, 2021 for the Chisholm Trail Road Project in the amount of $204,513.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. I on March 24, 2022 to amend the scope of services and to increase the compensation by $374,512.80 to a total of $579,026.60; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $54,128.48 to a total of $633,155.08; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Il. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $54,128.48 the lump sum amount payable under the Contract for a total of $633,155.08, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.06A6 0199.202112; 4882.8148-2713 84275 &q-2p7,, �- �2 1 BGE, INC. By: Eric Busker Director 0812t12o24 Date Supplemental Contract Rev.06A 6 0199,202112,4882-8148-2713 84275 CITY OF ROUND ROCK By: t�2crhu ��J Laurie Hadley, City Manager Gj 2 Date Supplemental Contract 4199.202112; 4882-8148-2713 APPROVED AS TO FORM: Stephanie L. Sandre, City Attorney Rev.05/ 15 84275 Chisholm Trail City of Round Rock From FM 3406 to IH 35 SBFR Exhibit B Services to be Provided by the Engineer ADDENDUM TO EXHIBIT B ENGINEERING SERVICES BID PHASE SERVICES (Function Code 170) A. Provide bidding support services, including assistance with responding to bidder questions, attend pre -bid meeting, and prepare minutes. B. Prepare Responses to Bidders' questions. C. Tabulate, evaluate bids, and make apparent low bidder award recommendation CONSTRUCTION PHASE SUPPORT SERVICES (Function Code 309) A. Engineer shall provide construction support services, including assistance with responding to contractor questions, attend pre -construction meeting, and prepare minutes. B. Assist City with Shop Drawing and material review and approval (assume 16 submittals) C. Assist City with preparation of Change Orders, Alternate Design or Additional Design Details D. Respond to Questions related to the Plans - The Engineer shall be available to respond to questions related to the plans and specifications as needed throughout the duration of the construction. The Engineer will document each question in sufficient detail, formulate a response and submit a written version of the response to the City for distribution to all involved parties. Estimate assumes no more than ten (10) Requests for Information. E. The Engineer representative to attend site visits as needed at the request of the City, estimated at eight (8) site visits, not included are visits to resolve E&O issues. F. The Engineer shall not at any time supervise, direct, control, or have authority over any contractor's work, nor shall Engineer have authority over or be responsible for the means, methods, techniques, sequences, or procedures of construction selected or used by any contractor, or the safety precautions and programs incident thereto, for security or safety at the construction site, nor for any failure of a contractor to comply with Laws and Regulations applicable to such contractor's furnishing and performing of his work. The Engineer will not bear any responsibility or liability for defects or deficiencies of the contractor. Sheet i of? ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page Chisholm Trail Road EXHIBIT C-2 Work Schedule ID 1 2 3 4 Task Name Durabon Start Finish Predecessors Successors Chisholm Trail Road Project Schedule 27S days Thu B/8/24 Wed 8127/25 Supplemental WAV Execution 0 days Thu 8/8/24 Thu 8/8/24 3,4 Bid Phase Services 0 days Thu 8/8/24 Thu 8/8/24 2 Construction Phase Services 27S days Thu 8/8/24 Wed 8/27/25 2 2025 1 A S D L.N�O�1�—F I M--j A M 1 1 A. _ S 8/8 .,. Supplemental WAN2 Execudon 8/8, Bid Phase Services Page 1 EAIIl itc-2 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page PROJECT NAME: CHISHOLM TRAIL EXHIBIT D-2 - FEE SCHEDULE FROM FM 3406 TO IH 35 SBFR FC DESCRIPTION BGE TOTAL FC 120 ENVIRONMENTAL $ - $ - FC 130 ROW $ - $ - UTILITY COORDINATION $ - $ - FC 145 GENERAL MANAGEMENT / COORDINATION $ - $ - FC 150 FIELD SURVEYING $ - $ - FC 160 ROADWAY DESIGN CONTROLS $ - $ - FC 161 DRAINAGE $ - $ - FC162 SIGNING, PAVEMENT MARKINGS AND SIGNALIZATION $ - $ - FC 163 MISCELLANEOUS ROADWAY $ - $ - FC 164 UTILITIES DESIGN $ - $ - FC 170 BID PHASE SERVICES $ 12,370.00 $ 12,370.00 FC 309 CONSTRUCTION PHASE SUPPORT SERVICES $ 41,662.00 $ 41,662.00 EXPENSES $96.48 $ 96.48 TOTAL $54,128.48 $54,128.48 SGE, INC. PROJECT NAME: CHISHOLM TRAIL FROM FM 34a6 TO IH 35 SSFR EXHISR D-2. FEE SCHEDULE TASK DESCRIPTION 8enlor Pr*d MgrMan Prajsct Poject En QC M f E]T Senior nw Tech Savor CADD Senkx ENV ENV Sdom '�N Cbrkd T,, TOTAL LABOR HRS.A COSTS FC 120 ENVIRONMENTAL COMPLIANCE MD PUBLIC INVOLVEMENT $0.00 0 FC 130 ROW 1DEN711FICAnON $0'00 0 $0.00 FC 14S P MANAGEMENT 0 50.00 FC 1 S0 BOUNDARY SURVEY REVIEW $0.00 a $0.00 FC 140 ROADWAY DESIGN CONTROLS 0 Se -de 0 $0.00 FC 161 DRAINAGE 0 .00 0 SO.DO FC 142 SIGNING PAVEMENT MARKINGS AND SIGNALVATION 0 $0'00 0 $0.00 FC 163 MISCELLMIEOUS A 50 000 FC 164 UTILITIES DESIGN 6 $0.00 0 50.00 FC 170 I1D PHASE SERVIGEB 76 Pre d Ada dance 2 2 4 .00 Re 10 maera' QUOStlanS 4 8 1 16 1 32 Ba S9,02D.00 BW Taeuladm g Award 2 1 4 1 8 1 14 510.00 FC 300 CONSTRUCTION PHASE SUPPORT SERVICES 240 $41 Pm-muvudlan jiwsw nce 2 2 2 2 8 $1,228.00 SRO Vhhs a "1 15 16 16 46 S8,720.00 Orawi upmiSda Review 15 as 4 16 12 16 48 37.940.00 Orders Review no ProcusIng 8 8 18 B B 2 52 9 218.00 Re toConhacIorQuecoms RFIs 10as 8 12 18 10 g 2 56 1045B.00 PrpJed Wam- 4 4 8 8 2 26 44.m= HOURS SUS -TOTALS so 72 so 18 0 0 0 0 a 31g CONTRACT RATE PER HOUR TOTAL LABOR COST $225.00 $11,250.00 S195.D0 14.040.00 $160.00 $12,800.00 Z30.00 ,140.00 125.00 S71,250.00 140.00 .00 AO .00 .00 .00 135.00 .00 $69.00 .00 S54,03Z00 W.032,00 SUBTGTu D=00 (TOTAL COSTS( DIRECT I TOTAL LABOR COSTS i Project I Manager I Engineer I Manger I EIT I Engineer I CoaDO I ENV I Sdardst I CbAtal I I TOTAL NH IY FC I EmaR. madam*mundnxkte"LgV