Contract - Fuguay, Inc. - 9/12/2024 Page 1 of 3
Contract Quantity Adjustment/Change Order
�OYMO■OOc IkxnS
rev,01116
Department: Utilities and Enviromental Services
Project
Name: Cycle 3 Basins 4&5 Manhole Rehabilitation Date: 7/25/24
City Project , . _ Change Order/Quantity
ID Number t�i_a= Adjustment No. Q 1.1
Vendor Fuguay,Inc. 4861 Old Hwy 81, New Braunfels,Tx 78132 830-606-1882
Company Name Address Phone No.
Justification
Additional three Manholes for rehablitation identified by City of Round Rock crews. Repairs include infiltration repair,clay bottom bench
reworking and very deep interceptor manhole with infiltration with complete recoating of two manholes.
SUMMARY Amount %Change
Original Contract Price: $410,640.40
Previous Quantity Adjustment(s): $0,00
This Quantity Adjustment: $55,504.00
Total Quantity Adjustment(s): $55,504.00
Total Contract Price with Quantity Adjustment(s): $466,144.40
Previous Change Order(s): $0.00 0%
This Change Order: $7,572.00 2%
Total Change Order(s)To Date: $7,572.00 2%
Adjusted Contract Price (Original Contract Price Plus
Quantity Adjustment(s)Plus Change Order(s)]: $473,716.40
Difference between Original and Adjusted Contract Prices: $63,076.00
Original Contract Time: 140 Days
Time Adjustment by previous Quan.Adj./Change Order: 0
Time Adjustment by this Quan.Adj./Change Order: 0
New Contract Time: 140 Days
Prepared By: Lxr 9-7—
Signature
/—Si nature Printed Name,Title,Company Date
Contractor .G�c . a,Hc1r"NEN�RrdG��CFO F-",IvAY 4'NC. 8/? Zo t
Signature Printed Name,Title,Company Date
City Project G � {�
Manager: G,(l� ar (ARP /('0 /UG —7—
57g/5jr't
A
Printed Name,Title Date
Mayor/City
Manager
Sig ature Printed Tqm ,Title 'Dale
- 20,zq- 250
Page 2 of 3
ROUNOROQ IE%RS Contract Quantity Adjustment/Change Order
rev,01/16
Project Name: Cycle 3 Basins 4&5 Manhole Rehabilitation
Quan.Adj./Change Order No.: Q 1.1
Change Order Data
Contract
Time
Adjustment
Item# Item Description Unit Qty. Unit Price Amount Davs)
Remove and/or Abrade Existing Coatings
within Manhole or Structure SQFT 631 $12.00 $7,572.00 0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.00
Page 3 of 3
Contract Quantity Adjustment/Change Order
rev,01116
Project Name: Cycle 3 Basins 4&5 Manhole Rehabilitation
Quan.Adj./Change Order No.: Q 1.1
Quantity Adjustment Data
Contract
Time
Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment
Condition Standat s and Repair Methods
2 Condition 3 SQFT 1 999 $41.00 $40,959.00 0
Inflow&Infiltration Repair-Injection of
3 Chemical Grout Material GAL 12 $245.00 $2,940.00 0
Inflow&Infiltration Repair-Injection o
Chemical Grout Material-Labor&
4 Equipment HR 12 $185.00 $2,220.00 0
Manhole Bench and Invert Repair 4'
5 Diameter Base EA 2 $600.00 $1,200.00 0
9 Set Up 6"Pump(Per Pump) EA 3 $995.00 $2,985.00 0
10 Set Up 6" Piping/Hose LF 200 $8.00 $1,600.00 0
11 Operate 6" Pumping System DAY 3 $1,200.00 $3,600.00 0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$55,504.00 0
FUQUAY,INC. 'Boa�d'
0 `1.."""
D
a
Ms1 OM tI.Y II.Rrw anss44 Tr Tlli M.r IOM—,P..I WI v4V..,
PROPOSAL
DATE: July 27,2024
PROJECT:City of Round Rock Cycle 3 Be—4 6 5 MH Rehabilitation Addtttonel Ouantitias
Cured In Place Pipe CIPP for Pipeline Rehabilitation#731-24
PROJECT SPEC"
UST Paan MEMBER PRIG NO gaCUYMTFD PRMIMG
SECTOR P.UV CURPn PRODUCT
uaZ K.
3—(M--)R.h.01H1.1— C.—II..Pmnc—
enJ
.RJB
INS
rPsr��• noel( Iwuw --
unx nlasmriuwona CM 6x tCa t IIs) ] ] I. 50 00 1336D00 t t
__..
_ nlpwOP_IlMswn Rmrt-sxar.YonWCnmlulGrvulwnnua.av 6[quip<e�,t._.. _ IN 6x u0o li]OP t) x3fW tIt L60o tO00 1,11low
4v
II13f sW#sY WIUMrM N
..PCu.WIW�e I nvYnr
nn IIm R�swsram bib.En�.c_y_ruv�M.tlu.o5w<lu,r ] a t 10s , M.3 m uM
tw.) 33115 1mRSNMmbnnn.R..3eY RRUMIr.lsn[�.wlmm nw lltwnlw.h MAE p _..N_. Z.P� __Il ry II Wa3 ItrM It,tna0 {1 IyW
REM l
8psss for Onr1ry rlpellma sea R.Isls4 k.ms
IRS—
'vwyl e.Puny _ })960
1.1 yp6•PM^l^'ms—_ -- f650—wl roow It l9
_.. Opn_6'punyrq SMten,
REM 30
a1 oth.Utttl m—MI CanveoeaeR MM*mipPIseMIIW a.Me
.M Mlslsd Rsn.
Sue0lsmsnlsl esm.
n _Jd�eeom
Mn
3.3ar ),.m<<on
W■rRa3]n.w.M faM.i}4M
� ECIT KMvle.Mf
R R.Rxael Toee aR.aan.no.n ReMovu.Mo1..1.crMrn or.Rr.I.MI«aa Rauolo.
M
IS
rKlm,.R IRTewe.t as M wcwoen M ne.Roro.Re
n .00naM.0 wMnrtaf a.w M.Mloc.S won5«Ia wot.MM6.auonMn..
woo.,.wo
ILL
Iver or wfxoc.no..ww�mow allvc
[Uvu:xossolu eO.PCxe.nle aw<ee ml.0 fe ryo..To nu
.MOIM'Y nue6z0 To eovua rox um eu]TeE
reaels:
xWVnr.lnr Trtes ._