Loading...
R-2024-237 - 9/12/2024 RESOLUTION NO. R-2024-237 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Patin Construction, LLC for the Heritage Trail West Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 5, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 5 to the Contract with Patin Construction, LLC for the Heritage Trail West Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of September, 2024. //, A CRAIG OR N, Mayor City of kounlRock, Texas ATT T: AN FRANKLIN, City Clerk 0112.20242;4880-3305-7246 EXHIBIT Nage I of 3 Contract Quantity Adjustment/Change Order Rv,OU16 Department: PARD Project Name: Heritage Trall West Date: 8/1/24 City Project Change Order/Quantity ID Number Adjustment No. 5 Vendor Patin Construction 3600 W, Second St.,Taylor,Texas 76574 512.269.1071 Company Name Address Phone No. JustHlcation See attached justification form. SUMMARY _Amount %Change Original Contract Price, $19,500,000.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0,00 Total Contract Price with Quantity Adjustment(s): $19,500,000.00 Previous Change Order(s): $1,615,700.00 8% This Change Order: $208,395.57 1% Total Change Order(s)To Date: $1,824,095.57 9% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)): $21,324,095.57 Difference between Original and Adjusted Contract Prices: $1,824,095.57 Original Contract Time: 480 days Time Adjustment by previous Quan.Ad),/Change Order: 130 Time Adjustment by this Quan.Adj./Change Order: 21 New Contract Time: 631 days Prepared By: t-t C '� Pww- Slgmture Panted Name,Title,Company Date Contractor: Sig re Printed Name,Title,Co Date City Project Manager: V. Z (signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Pngc 2 of 3 Contract Quantity Adjustment/Change Order toy,of/M Project Name: Heritage Trail West Quan, Adj./Change Order No.: 5 Change Order Gate Contract Time Adjustment Item# Item Description Unit qty. Unit Price Amount p Embed Plate revision-due to engineer 1 resp2nse from shop drawing LS 1 $345,050.00 $36,050.00 2 Deduct for signage removed from scope EA -1 $5,500.00 -$5,500.00 3 Engrave"Memorial Park"on planter wall LS 1 $3,110.00 $3,110.00 Remove and replace concrete approach 4 at Lee Street low water crossing SF 525 $22.00 $11,550.00 5 Restroom wood panel with vinyl wrap LS 1 $4,821.00 $4,821.00 6 Modifications of metal panels at restroom LS 1 $21,728,00 $21,728.00 Deduct or collector box,scupper, rain 7 chain at pavilion LS -1 $6,963.43 •$6,963.43 8 Piers for scu ture EA 12 ¢8 $10,200.00 9 Concrete pad for sculpture SF 50 777T65. $3,250.00 Electrical and recepta or camera at 10 Round Rock LS 1 $13,900.00 $13,900.00 il Painfing structural steel at ram L 1 $73,500,00 $73,500.00 12 Stone Gadding for spiral ramp abutment SF 1450 $27.00 $39,150.00 21 Install rock maintenance drive a 13 Chisholm Trail Road LS 1 $3,600.00 $3,600.00 $0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 0. 0.00 Nage 3 of i Contract Quantity Adjustment/Change Order fev.01716 Project Name; Heritage Trail West Quan Adj./Change Order No.: 5 If I antiAd stment Data SPIN Contract Time Bid Item# Item Description Unit qty. Unit Price Amount Adjustment am $0.00 $0.00 00 $0.00 $0.00 $0. 0 00 $0 AO $0.00 -- $0.00 $0.00 $0.00 0.00 $T0-0 $0.00 00 $0.00 $0. .00 $0.00 0 $0.00 TOTALS: $0.90 0 Heritage Trail West Change Order #5 Summary Date: 8/1/2024 Change Order#5 to the contract with Patin Construction includes changes to the current phase of construction. These changes include: Embed Plate Revision: After shop drawings were submitted for the Spiral Ramp,the structural engineer required modifications to the embed plates. This item is the cost to made the necessary revisions. Cost: $26,000.00 Deduct for signage removed from scope: Signage was removed from the scope for the interpretive panels. The City is still working on finalized the design of the signs and will purchase and install the signs outside of the contract. Cost: $-5,500.00 Engrave Memorial Park on planter: The planter near the playground at Memorial Park has "Memorial Park" engraved on the parking lot side. Since there will be a lot of traffic from the trail side of the planter,this item includes engraving"Memorial Park" on that side of the planter as well. Cost: $3,110.00 Concrete work at Lee Street low water crossing:The Transportation Department requested for the approach to the low water crossing at Lee Street be removed and repoured for both safety and aesthetic reasons. Cost: $11,550.00 Restroom wood panel with vinyl wrap:A perforated metal panel needed to be converted to solid wood to limit water infiltration to the building. This wooden panel needed to be wrapped with vinyl to blend in with the other metal panels on the building. Cost: $4,821.00 Modifications of metal panels at restroom: Field modifications to the metal panels that bridge the gap between the steel pavilion and the stone restroom below. This included adding a rubber strip and creating metal channels. Cost: $21,728.00 Deduct for collector box,scupper,and rain chains: The rain collector box,scupper and rain chain were deleted from the scope because they were no longer needed. Cost: $-6,963.43 Piers for sculpture: Heritage Trail West will be home to several sculptures. This item includes installing piers for the installation of the Horse and Rider sculpture. Because the sculpture will be located in the floodplain, piers are required to keep the sculpture safe in the event of a flood. Cost: $10,200.00 Concrete pad for sculpture: The item is the concrete pad associated with the Horse and Rider sculpture installation. Cost: $3,250.00 Electrical and receptacle for placement of security camera at Round Rock:This item will allow a security camera to be installed at the round rock. Although there is electrical and a receptacle in the vicinity of the Round Rock existing, it is all tied to a photocell and only turns on when it gets dark. This item includes running a new circuit that will remain on 24/7. Cost: $13,900.00 Painting Structural Steel at Spiral: This item includes painting the structural steel at the spiral ramp. Plans called for the steel to only be primed, but the spiral is such an iconic element,the decision was made to paint it to match the columns. Cost: $73,500.00 Stone cladding at spiral ramp abutment: The abutment between the spiral ramp and serpentine trail (elevated trail section)was to be only concrete. All other walls in the park and along the trail are clad in limestone rocks. This item includes cladding this wall on the 3 visible sides. Cost: $39,150.00 Rock Maintenance Drive at Chisholm Trail: Railings associated with the roadway and bridge will limit maintenance access from Chisholm Trail. A small rock drive was installed through a landscape bed to provide access to PARD maintenance crews. Cost: $3,600.00 TOTAL:$208,395.57