Loading...
R-2024-264 - 9/26/2024 RESOLUTION NO. R-2024-264 WHEREAS, the City of Round Rock has duly advertised for bids for the Wyoming Springs Segment 1 Project; and WHEREAS, Capital Excavation Company has submitted the lowest responsible bid; and WHEREAS, the City Council wishes to accept the bid of Capital Excavation Company, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Capital Excavation Company for the Wyoming Springs Segment 1 Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 26th day of September, 2024. CRAIG 14ORGA , Mayor City of Round R ck,Texas ATT ST: ANN FRANKLIN, City Clerk 0112.20242:4887-5389-6932 :•: halff BID TABULATION Project:Wyoming Springs Segment 1 Capital Excavation Com Bid Submittal:Wednesday,August 14,2024 @ 2:00 PM P Pany James Construction Group,LLC Patin Construction,LCC Jordan Foster Construction,LLC Joe Bland Contrlallon,LLC Enpinaars Eatimete Owner:City of Round Rock Engineer:Halff Associates City Bid Form x x x x x Bid Bond Form x x x x x Statement of Bidder's Safety Experience x x x x x LOWEST RESPONSIVE BIDDER Ban Bid It.. Description um ausseft Lh*Price Total Pr..id.d Unit Price Total Unit Price TOM UrAt Prim Total Unit Prim TOM Unit Prim Total 1 1006002 PREPARING ROW STA 67 $4,520.00 $302,840.00 $35,000.00 $2,345,000.00 $2,500.00 $167,500.00 $37,000.00 $2,479,000.00 $1,750.00 $117,250.00 $2,206.00 $147,802.00 2 104$015 REMOVE CONC SIDEWALK SV 172 $50.00 $8,600.00 $15.22 $2,789.84 $20.00 $3,440.00 $25.00 $4,300.00 $50.00 $8,600.00 $50.00 $8,600.00 3 104$017 REMOVE CONCRETE DRIVEWAYS SV 213 $43.50 $9,265.50 $21.18 $4,511.34 $20.00 $4,260.00 $25.00 $5,325.00 $75.00 $15,975.00 $28.80 $6,134.40 4 1048022 REMOVE CONC CURB 8 GUTTTER LF 389 $21.50 $8,363.50 $10.72 $4,170.08 $5.00 $1,945.00 $14.00 $5,148.00 $50.00 $19,450.00 $37.00 $14, 393.00 5 1056016 REMOVE STAB BASE d ASPH PAV SV 1,150 $15.00 $17,250.00 $6.34 $7,291.00 $11.00 $12,650.00 $19.00 $21,850.00 $30.00 $34,500.00 $20.00 $23,000.00 6 110$001 EXCAVATION ROADWAY CV 18,687 $26.00 $485,862.00 816.81 $314,12647 $11.00 $205,557.00 $21.00 $392,427.00 $18.00 $336,366.00 $20.00 $37 3,740.00 7 132-6004 EMBANKMENT FINAL DENS CONT B CV 26,954 $28.00 $754,712.00 $22.07 $594,674.78 $10.00 $269,540.00 $6.65 $179,244.10 $10.00 $269,540.00 $40.15 $1,082,203.10 8 1606003 FURNISHING AND PLACING TOPSOIL 4' SV 58,808 $3.08 $181,126.64 $1.79 $105,266.32 $2.00 $117,616.00 $2.60 $152,900.80 $3.00 $176,424.00 $6.25 $367,550.00 9 164$003 BROADCAST SEED PERM RURAL CLAY SV 45,656 $0.50 $?2,828.00 $0.19 $8,674.64 $1.00 $45,656.00 $0.32 $14,609.92 $1.00 $45.656.00 $2.15 $98,160.40 10 164-6009 BROADCAST SEED EMP ARM SV 22,628 $0.50 $11,414.00 $0.17 $3,880.76 $1.00 $22.828.00 $0.32 $7,304.96 $1.00 $22,828.00 $1.05 $23,969.40 11 164-6011 BROADCAST SEED MP COOL SV 22,828 $0.50 $11,414.00 $0.17 $3,880.76 61.00 $22,626.00 $0.32 $7,304.96 $1.00 $22,628.00 $1.04 $23,741.12 12 1646028 CELL FBR MUCH SEED PERM URBAN CLAY SV 13,152 $0.50 $8,576.00 $0.62 $8,154.24 $1.00 $13,152.00 $0.52 $6,839.04 $1.00 $13,152.00 $1.95 $25,646.40 13 164-6011 CELL FBR MLCH SEED TEMP ARM SV 6,576 $0.50 $3,288.00 $0.59 $3,879.84 $1.00 $6,576.00 $0.52 $3,419.52 $1.00 $8,576.00 $1.60 $10,521.60 14 1646031 CELL FBR MLCH SEED TEMP COOL SV 6,576 $0.50 $3,288.00 $0.59 $3,879.84 $1.00 $6,576.00 $0.52 $3,419.52 $1.00 $8,576.00 $1.80 $11,836.80 15 168-6001 VEGETATIVE WATERING MG 1,718.8 $41.00 $70,470.80 $57.02 $96,005.98 $10.00 $17,186.00 $50.00 $85,940.00 $45.00 $77,346.00 "a 00 $116,67840 16 1696001 SOIL RENTENTION BLANKET(CLI) A SV 2,676 $1.50 $4,014.00 $2.59 $6,930.84 $3.00 $6,028.00 $4.00 $10,704.00 $3.00 $8,028.00 $6.16 $16,537.68 17 1696006 SOIL RENTENTION BLANKET CL 2 F SV 1,352 $3.00 $4,056.00 $2.88 $3,893.76 $3.00 $4.056.00 $10.00 $13,520.00 $10.00 $13,520.00 $2.15 $2,906.80 18 1696007 SOIL RENTENTION BLANKET CL 2 G SV 89 $5.50 $469.50 $6.69 $613.21 $3.00 $267.00 $50.00 $4,450.00 $22.00 $1,958.00 $4.00 $356.00 19 1706001 IRRIGATION SYSTEM LS 1 $123,000.00 $123,000.00 $135,951.65 $135,951.65 $125,000.00 $125,000.00 $120,000.00 $120,000.00 $165,500.00 $185,500.00 $150,000.00 $150,000.00 20 1926015 LANDSCAPE EDGE LF 278 $23.50 $6,533.00 $37.94 $10,547.32 $45.00 $12,510.00 s50.00 $13,900.00 $30.00 $8,340.00 $20.75 $5,768.50 21 1926025 PLANT MATERIAL 45 GAL REE EA 61 $860.00 $52,460.00 $677.00 $53,497.00 $750.00 $45,750.00 $1,060.00 $64,660.00 $500.00 $30,500.00 $730.00 $44,530.00 22 1926027 PLANT MATERIAL 100 GAL REE EA 51 $1.470.00 $74,970.00 $1,577.87 $80.471.37 $1,400.00 $71,400.00 $1,600.00 $81,600.00 $1,500.00 $75,500.00 $1,200.00 $61,200.00 23 1926028 PLANT MATERIAL 1 GAL SHRUB EA 330 $16.00 $5,280.00 $18.67 $6,161.10 $40.00 $13,200.00 $11.20 $3,696.00 $50.00 $16,500.00 $7.50 $2,475.00 24 192-6030 PLANT MATERIAL 3 GAL SHRUB EA 397 $30.00 $11,910.00 $34.13 $13,549.61 $55.00 $21,835.00 $34.00 $13,498.00 $50.00 $19,850.00 $75.00 $2 9,775.00 25 192-6063 PLANT BED PREP TYPE I SV 3,067 $32.00 $98,144.00 $39.50 $121,146.50 $28.00 $85,876.00 $22.00 $67,474.00 $10.00 $30,670.00 $17.30 $53,0 59.10 26 1926064 PLANT BED PREP E II SV 1,191 $31.00 $36.921.00 $11.05 $13,160.55 $57.00 $67,887.00 $28.00 $33,348.00 $20.00 $23,820.00 $0.95 $1,131.45 27 247-6366 FL BS CMP IN PLC A GR 5 FINAL POS CV 11,688 $52.00 $607,776.00 $47.92 $560,068.96 $85.00 $993,480.00 $51.00 $596,088.00 $50.00 $584.400.00 580.00 $935,040.00 28 2606002 LIME HYDRATED LIME(SLURRY)) TON 375 1 $50.00 $16,750.00 $324.45 $121,666.75 $350.00 $131,250.00 $0.01 $3.75 $515.00 $193,125.00 $275.00 $103,125.00 29 260-6073 LIME TRT SUBGRADE 8' SV 20,551 $1-00 $20,554.00 $342 $70,294.68 $10.00 $205.540.00 $0.01 $205.54 $10.00 $205,540.00 $2.50 $51,385.00 30 3106005 PRIME COAT MULTI OPTION GAL 5,428 $4.50 $24,426.00 $3.65 $19,812.20 $6.00 $32,568.00 $3.80 $20,62640 $5.00 $27,140.00 $6.74 $36,564.72 31 4006005 CEM STABIL BKFL CV 936 $230.00 $215,280.00 $165.61 $155,010.96 $150.00 $140,400.00 $170.00 $159,120.00 $130.00 $121,680.00 $254.00 $237,744.00 32 4006008 CUT 8 RESTORING PAV ASPH SV 36 $142.00 $5,112.00 $562.59 $20,253.24 $165.00 $5,940.00 $800.00 $28,800.00 $195.00 $6,660.00 $185.00 $6 ,660.00 33 4016001 FLOWABLE BACKFILL CV 114 $320.00 $36,480.00 $164.87 $18,795.18 $300.00 $34,200.00 $350.00 $39,900.00 $275.00 $31,350.00 $535.00 $60,990 .00 34 4026001 TRENCH EXCAVATION PROTECTION LF 6,289 $6.00 $37,734.00 $2.88 $18,112.32 $5.00 $31,445.00 $3.40 $21,382.60 $5.00 $31,445.00 $7.65 $48,110.85 35 4166001 DRILL SHAFT 18 IN LF 190 $360.00 $68,400.00 $394.51 $74,956.90 $500.00 $95,000.00 $145.00 $27,550.00 $375.00 $71,250.00 $237.00 $45,030.00 36 4166004 DRILL SHAFT 36 IN LF 1,554 $500.00 $792,000.00 $411.83 $652,338.72 $700.00 $1,108,800.00 $410.00 $649,440.00 31665.00 $894,960.00 $367.00 $581,328.00 37 4166029 DRILL SHAFT RDWY ILL POLE 301N LF 152 $590.00 $89,680.00 $500.00 $76,000.00 $625.00 $95.000.00 $532.00 580,864.00 $1,200.00 $182,400.00 $395.00 $60,040.00 38 416-6032 DRILL SHAFT RF SIG POLE 36 IN LF 42 $840.00 $35,280.00 $710.00 $29,820.00 J $890.00 $37,380.00 $755.00 $31,710.00 $1,400.00 $58,800.00 $319.35 $13,412.70 38A 4206002 CL A CONC MISC CV 14 5780.00 $ 10,920.00 $1,144.39 $16,021.48 $1,500.00 $21,000.00 $735.00 $10,290.00 $1,850.00 $25,900.00 $1,441.32 $20,178.48 39 420-6013 CL C CONC ABUT CV 218.4 $1,270.00 5315,468.00 $1,074.50 5286,905.80 51,500.00 $372,800.00 21,200.00 $298,080.00 $1,500.00 $372,800.00 $1,593.00 $395,701.20 40 4206029 CL C CONC CAP CV 1 356.1 1 1 $1,650.00 1 $587,565.00 $1,245.94 $443,679.23 $1,500.00 $534,150.00 $1,500.00 $534,150.00 $1,500.00 $534,150.00 $1,925.00 $685,492.50 41 4206037 CL C CONC COLUMN CV 1 219.8 1 1 $1,5110.00 1 $329,700.00 $1,195.73 $260.52345 $1,500.00 $329.700.00 $2,100.00 $461,580.00 $1,500.00 $329,700.00 52,000.00 $439,600.00 Page 1 of 7 08008 3880 8 8 8888,-4888888.88800o888888SSS�88o888SS8 � 000aR g8� E ■ ■E• 88 �g88gSS88� o 0 8SS8S8888888888888o88SS8o�888o8m o 0 0000 asmss�so �g��M �xoom �0880 s � es ��sss 888sse�sos�s��s8s.ss.s8�essssssoe888s � � � � o �oo _ x<� xs s$ "so�o�o� ssq�sR $s�a � o� g�$ � o �§ 6 N 88 88 8 0 8o 18S88Sss888g8888888888888888 88 888gg ' 8 68-0810 s 2asr ���„§ �ssss��o �� �� � � �$deo ~ »W, W- »~» »»gym»»»»»�"- "x»,6 .6g ww a $ 080888888 8 8 S888R88 8 S888SS8888888888. 8885^ s 88s $os 88 g8o8o8sags$°���r�om„ 8���� ������ sss^�o U ffi 888888888858888aao 888 0 8 8 gg8gSSR8 - 0 8888g88s888.8.8.88.8858 ,8 g8888�8885 $ $ 888888Sg00008S8808.888888-88SS88888889 so 0088 _ " C' 8s ssseeee888s8ss � oaoog $asege8888 8 8 888880.08888898888Ng889 X000 V O m p O p p m p y O p y op m C n N eppl g mmO.8 N m N !. R N O p$ W♦�A O 8 s N O O y N ^ < 0 t rot N�Op 7 2 ~' O 0 t+� N p � » » C3�a »»^»-»a3- "» P ��» s a mai~3z s N �asma�rs�o.m��xa�s.moo.o ry m��N '88 ��m8a 8 8 88os�88ssssaesoasassseesa8ssssassss88000000 88§e-§. $ g § ems P s a sa8ge8»8s. s 8 8$s.sseeses88888sss8sse�sessgsssgs888oso8s»»$ a aa �g» s a ssR�r�sss2mx8�� gasss � � � � �$'��s cm ,0000 > 000i ' v v uu�u�� w�����w �u�u5u�u�u�u5u5uS�Su�u5�3uSu��Su�u� u� u� � �uS�S�w� z =O W Z O S r LL X Z Z Z U a o 0 cr Oo . ZWO-d,m aQmN�i�aaaUUo r z�z?m % z zr`�riri Lx) id.K id a eS 2 U U x ���'a U' rczQppp z zw aim w w LLv"'z v �, ^ a..w K =aaaaa � .O w �oo92JO O fzdd0 z IizzZzz���V000��p444 00 L)UKpo2 wa 3mY on z w o_�gz ozzzm,�-y i ;OMMOO m 2222m m rd. .. U '' ng..Ud a UarrU y.Npp>�N nddd a dd��}r}r} 2 jw-o mga w wzw mmm d ZN..� 2S zz z z z 0 2 man am2 3�UUaUUz z-z0 0 a� p====»��d��� ��00c� �m � d ab z mmi w wU(�m3zzdzZ0 o�oz3o3 4a� r��0-----ddd�daaaarJJJ Nnnr, rrrr4 Uzp2o00wOOr 6Nro Ow'pK&mm )XUUUUUmmmommmm� �____ _ mmmmr ZomU 00Lo0NZ— mUssw�z�aw 000 00000r _ = _rU a K m Ng m W MON W W W W W U U U U U U U U U m J6 - m W w W w o?rr�°dg°dg°dg °dmgg gg r S�O aaadd r 3333 <Q �»»"� UwmammUd�dd awdadd ° U-----222 rrrr O U O 2 Z O d r W W Z Z 2 w w_ a d z d d d a a z z z W w W W w w pQ pQ QQ 2 r r til W m W KdwK d'OQddmdYddldrQQQQQQ��f ODUUUU JJw��m W W�1-W W ru w w w a W w W W QUppKmaKd mUUUUKMMIr:K �ZZZzZd2223mm m m m d EL it Ir Mill -- vvo�`�����$aae������a��3�`�� m" X08 � 8 8$$8o8o8Sgom�8888x8S<88o 88Sa8$�88S.�8go88oSSoSSS moNoo N $a�6 vi vi �$ oco E ■ S 8gm 8� 88S 8R8o8nSS0o�?S w � °°53< 8 "o0�$SOa�OOQSO'o 0 808+= Sg8$SOOgg s sss s g �sSsso000s�ss�sssssssssssoos000sgsgsgggsssgs��ssss U $ Now 0� Not '808 00 $ $ OS88S 080 o8g m o 808 8 8 8gg8.8g888S08gg Og S g S8a88.88 8„goon pI � ss� �� ; �ms� a�� �x �ra ��� J $ sss s s sgAs s0oo�osg�sgsss.assssssgoagssgssgsssgs gogogg � $gRg9 M 9,Ami gg's „o8os $ ” .� AWN � a »»»»� ' U S sC G G G Css. as. s sass CCO po ss.sGs. C ag 0s a oxa= »»� »rR �ss �s �» gig' N»��x� r» gs � �sr N. s a88888$oog. �s�sgsgs.gg$osssososgssssssggo666 -N sgsosssg s. s s0osao�gNgsosI §'n 1 §Eg g23gggss g sig »»s» »»»x� w»» " Oa8 8�M8 B:,S°°�g�<`�88a8$ass�9gssgss8ss$8�s8S 8821 1?8N 'd Ni so �s'= � �g ate$ $ms x ��N �mm s �� s; $ max �rN�ms »»a » » » =»»»»»» »»p A SIR» »» »»»»»x»»„»xis»$»»»»Q»»»»»~x»» o o Nets ss��oa==^.mr�g�oo�YRssAoss.sssg � $8gm�s € »�»»fir »a� »»»»» r $ OSS 0 o 88288gg8a$88$8g8g8gg88g8g8o8$088$88$SS88g888g88gggg 'a � _ � N- » » »x»s»i»»»»»="» �» 3 0 � s. o s sasses$oNN os8gggs08$$oN�ssass$ sgg M » xass»»»»»»»»»» »x� 3� »»»»»» 3»„»» fir aimcli oANes.<�r�Nr<s� O z Ny p F _ ap W J Z m LL Ny > Q o W Q O N W J O AK U W 7 LL Z Z W N W Z_Z_W ~yytr=iA J OC w'3 w C W Q� >O O W W Wt�l7��m�ymt5/7�NU Q a0�W iAm W 3oN m m W JN N JZ y_OyOayyOD to U2 �f HpF �f.)f.)O V O�U �N H 3N'NNc• 7QN W W ~�F� Z_NN W U U ZZJJJ7p m A gi'typ p� 10 XpoO R'7 N ? K 5 LL 4 2 Z Z p o W WW f 2 Fi U Y m om O O 'F N Z N N a Z� O O O p V Z e a'° )A IA LL Z W m Z=LL N O O==2 m m m m Q y Cy m�dV J Z Q Q Q Z Z Z p€j U U U O 7 O N J J F N 0 IWi o Z 0 y N F U N000p p pUUNyN2 y�UQQQ (9 Z W J QQQ mNN`d X 77 Nmmm K N m w w U U F 0 0 0~8 N N N O W ly O N K m X X O o- Z mmNU) (Lm . C9J �m m mUUUUU OooOom mzzzzmm Wp f f FW-W W j K K m U�'C m>>W W O Y H W W K K K Z Z m m m U' �X N m m N N Q-- W W WWW 7 0 7 7 Q Q o o Z N O f 7 7 O O o O p w>7 0 0 0 0 0 w ULLLLLL NN(7(7(7 UU22mN MUD' HH F-HUU2Z2>m KKKKo> W W W m p U U GG11 f�iill U U m m m U 3 m K Z W 7 p U o 0 0 0 Q 0 0 z o o U U 7 7 7 N f f 4 0 0 0 2 Z Z>>Z Z K 0'K Q f W J Z m m m Z Z Z 2 2 2 2 W W O 0 0 U 7 N m N N m Z �$$$. �WW00000000rcoo777'6JJ7� LLWo op00000JJrc �wJ W mrcAON m U��g3mmmU4000ooUUUUUU c7Uc�az4U3zZU000UUUWW�3oc�ic�mwJ¢4zzzzzm 121N, pW�p�p app tp�p tp�p�rp�p��p�p ��pp�pWp tpp ��Ip���{_J��� yy SpA SpA�p tp�p�M W����� �W�`��`4w yy��pp�ypW W� N N N N N N YI N N�§IA�(NJ qh h N iNA iA N YNf N N Yf�IyA N U IA IA 10 10 f0 IO f0 10 10 iA IO�ip0 i0 b tND iA N.b tND m tD 1A fD m gg; $, 8 O oao$oo°10�����°�m�'NNNNNNNNNNR(rn"'Mlyin�il�n�n'v: a3raaaa9, m N�N NN ��OO��pp ��pp��pp��Op ��OO 0o mm pmp Om� mm VV VV pp�� Ap�Cpo�Oq pq. OW� t{!D� 0 V 00Appp�pm�m ��mmmOe OO CO OC Of pgpOOI D7 OINO,pppggq���pp��pp�l pp�� pp�l pp��pOH,pO1�QQ��pp��pp��pp��pp��pp��pp��pp��pp��Qp��pp�1T O)�O,O,O, j AMNO O NN W+p N N+ pOOO+ po f�NNN+mpp OD V A V{J� {�1 W V+Oo A A F A Z ,mL D D D T T m m m m m Z r r r m m m m m m m m m m m m T T T T T T m m m m m y T �O v O y y y m m m m 0 0 0 0 2 S 2 2 2 2 y��.;m T T A r r r r r r ��yy NN NN N��yy v� <Om 3 rDr Tim mmm—'00000 550Dy(OyUI W y 2 L LL 3D30 3D 3D 31 �«< 0. T.> m p p y p m m m m m m m m m m m m m m s a s;;; m 3;M K M ; ;;;;; ;m y mDmi�� LL rrr min fn 0000000 «<AAA����AAAAA A�AAAAAAAmm mm� p vZ-O'um" + 7Cxx x7Cxxx x xx7C x)<x 7C AAAAA (/l A A A A A A 3 7C -Z z x x x 2�C�O A N D D D N N N m N N N N N N A A A A� �m m m m����� �m�������m y 0 D DDD D v r r r r "x x p D 0 0 D O Z Z Z Z Z O yO�m�p2myyy + mmmmmmWo-aar� -----�- ------� 00000 WE E zw!—mmz-lc,+++AAANNmmmOovvvov�s3s�-64444-----_-�< 4zzzzzN - Z-0,001 Z O A yD D D D D D D 0 0 0 c A A O O C A A A << O Am>mM f zmmmmAA A7,A -V mL r 0 O Orr Z Z L y y y v m;A S S o V N S W O p A D A m 0' y p 0 0 O O O y r 6 <<<<G = O a O 00;y A 00;00000 m s O A W O 0 0 f 6 0 y 01 0 5 m%y ccc000000 Z- F m�0 6o�v f O +��+++ vO;yNamz ozzzz 'ice ;'ZODDD g 8898§ +y AAyppv F z Z - r FIT"r (nVV b A IWN b A A" bog+W 4f++N o',oN W W VOW,N V.1216 mN�mOe W m�ob�mO W m$$,b0 V AO`b'o' g G r�u,N N N MNNNNNNM�rIa.g.r rrr NN N MM M_M_" Pl goo I So 8No88888S58i58888g8888oo8g88�^88888888g$888$8$gg8$$$8dg8sso m �oos�� ss § fig o99o999ss'gNmi�moN�� � mw 982 ' 88"".o8888s888sssss8o8ossgossg$o888so$8osso8s8ggssso.80000s �«MIN- msmN� 9�9�8�8�8�8--r8N � grg. P. �s8ss"»g�s«s»s»m».�s�»o»'sss » N " oNso�_s"AVN H � so'�oW� m�w $N�WN �$sN�N a s'��NH�o�0000���. o�o gsssssssassgaassasssssas�asso�s8���s�s88g����osBassN�sasBo= ��tt "Ns 'ttNtt�r � NtiN«� o gsssssssg8888ssgssg8sssssssso��sss8ss`osssssggs�o ' ass »ttN� ����rw »» «"rx"�x�NNxMx-xx�w���o��� « o mo- $ogs �000SH N �Em' s�Hmfo =H000000 �ssssggaa8ssssssssssssss8sssssssssssssssgssssss8s.ossa v««wN sS8g���uvv $SsgBfSaSSSUssss$sNssasa sss� s' 988 988888 ss ss ass s s 888 assess o 8 g xN�pr��N' ggssg.sss�ss�sossssssss�sssssgssssosossssos=sosssssaosssoss osH Bsss8ossg888ssss8sssas$$oggasss88s8g8sa8gs8 sass-ss 's o " "r"Nmti��Nx»twxr�xrx�"��Nwaw"�W"«w�NNrr�»��xr»��«rmg" N V Nb V- 'I A C+V .i ,N v o$.'a . � $$ �NN�ovs�. �U'o. Wsota i o�000seN��essW ..s� �N ossosos8s8s888s8o8ss8s8888888s$88s8$sosoossosossss$ssssss8o 11 rrN»«« ««r��NNN »» tt�«a»««s"»o»o »,Wo�N��»NN«"smso�N��o�'"�"�«o�wrs""W++ r., �" +a 8�'a�. ��!^a««« 000. �mU oo-ogSgW g"W>ooB'o8oo-9e'8�o�go8`000SeSuoUogo� eSoS88gBme.Ngm.uo m o " Now r A",!! -"fOa. rno+P�NNa;Y,dN=� _B �Yn'e,mu�c,o"�oin:i:io8`W' A Nw;Nm�mo v oNBm �m'�f,� K�sw `� m�P'm'mm�"�-Ngagoo .y aoog,m MOM sS .oos800000goo88b�g88$ov8gge8d000NOPoo�Boo6NmNo'oo808 � :-E halff Capitol E-ation Company James Construction Grp,LLC Patin Construction,LCC Jordan Foster Construction,LLC Joe Bland Contriafion,LLC En Estimate Engines,', It.. Description Unit Quantity unit Prim Total P-id.d Unit Price Total Unit Price Total Unit Prim Total Unit Price Total Unit Price Total Bid 209 CORR 5108'DUCTILE IRON PIPE LF 36 5142.00 Es,112.00 3175.00 56,300.00 $70.00 $2,520.00 S4s5.o0 E1s,7ao.00 Ezos oo 87.380.00 5105.00 53.780. 00 210 CORR 51030'DUCTILE IRON PIPE LF 770 $470.00 $361,900.00 $392.00 $301,840.00 $500.00 $395,000.00 $545.00 $419,650.00 5465.00 $358.050.00 $170.00 $130,900.00 211 CORR 510 DUCTILE IRON FITTINGS TON 4 $40,900.00 $763,600.00 $30,000.00 $120,000.00 $56,000.00 $224,000.00 $32,000.00 5128,000.00 $20,500.00 $82,000.00 $13,50000 $54,000.00 212 CORR 511 IRON BODY GATE VALVE 30'DIA. EA 1 $81.000.00 $61,000.00 $55,000.00 $55,000.00 $80.000.00 $80,000.00 $65,000.00 565,000.00 $73,500.00 $73,500.00 $69,000.00 $69,000.00 213 CORR 511 IRON BODY GATE VALVE 8'DIA EA 1 $3,130.0 $3,130.00 $2,500.00 $2,500.00 53,500.00 53,500.00 $4,000.00 $4,000.00 $4,250.00 $4,250.00 $5,000.00 55,000.00 214 CORR 511 IRON BODY GATE VALVE W DIA. EA 1 $2,400.00 $2,400.00 $1,750.00 $1,750.00 $5,000.00 $5,000.00 $3,400.00 $3,400.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 215 CORR 511 FIRE HYDRANT ASSEMBLY EA 1 $7,400.00 $7,400.00 $8,900.00 $8,900.00 $7,500.00 $7,500.00 $10,300.00 $10,300.00 $7,250.00 $7,250.00 27,915.00 $ 7,915.00 218 CORR 511 WET CONNECTION 301N EA 2 $24,900.00 $49,800.00 $10,000.00 $20,000.00 $25,000.00 $50,000.00 $38,500.00 $73,000.00 $14,500.00 $29,000.00 $49,257.00 $98,514.00 r2lCORR 511 ADJUST WTR VALVE TOGRADE EA 6 $590.00 $3,540.00 52,500.00 515,000.00 $750.00 54,500.00 57,500.00 $9,000.00 $1,000.00 $6,000.00 $1,500.00 $9,000.00 CORR 610 PRESEVATION OF TREES AND OTHER VEGETAT EA 198 $350.00 $69,300.00 $25000 $49,500.00 $500.00 599,000.00 $320.00 $63,36000 $50000 $99.000.00 $500.00 599,000.00 CORR 623 DRY STACK ROCK WALL SF 1,335 544.00 $58,740.00 $75.00 $100,125.00 $40.00 $53,400.00 $6500 $88,775.00 $60.00 $80,100.00 $35.00 $46,725. 00 CORR SS 1000 SWAO-40-BYPASS STORMTROOPER EA 4 579,000.00 $316.WD.00 579,285.89 $317,143.56 5112,000.00 $448,000.00 590.000.00 $360,00.0 $82,750.00 $331,000.00 $99,150.00 5396,600.00 CORR SS 1000 SWAO-110-BYPASS STORMTROOPER EA 8 $102.000.00 $816.000.00 $100,964.44 $807,875.52 $152,000.00 $1,216.000.00 $140,00000 $1,120,000.00 $105,000.00 5840,000.00 $131,DDD.00 $1,048,000.00 CORR SS 1001 CARE OF WATER LS 1 $408,000.00 5408,000.00 $15,000.00 $15,00000 $100,000.00 $100,000.00 $125,000.DO $125,00000 $225,000.00 $225,00000 $200.0000 $200,000.00 CORR SS1002 CORRIDOR FENCE LF 4,523 $1070 $483,9610 $359.10 $1,824,209.30 $120.0 $542,760.0 $97.0 $438,731.0 $140.0 $633,22000 $97.0 $425,1 620333078-6002 HOT MIX ASPHALT D-GR TY-B PG 64-22 TON 924 $128.00 $118,272.00 $110.0 $101,640.0 5140.0 5129,360.0 $120.00 $110,880.0 $130.0 5120,120.00 $79.79 $73,725.96 EXEMPT 225 SS3076-6015 HOT MIX ASPHALT D-GR TYC PG 64-22 TON 3,074 $117.0 $359,658.00 $10.0 $307,40.0 $125.0 $384,250.0 $120.00 $368,880.00 $120.00 $368,880.00 $96.21 $295,749.54 EXEMPT 226 SS3076-6023 HOT MIX ASPHALT D-GR TYC PG 70-22 TON 2,458 $134.0 $329,372.00 $115.0 $282,670.00 $150.00 $368,70.0 $135.0 $331,830.00 $135.00 $331,830.00 $103.90 $255,373.91 EXEMPT 227 SS3076-6035 HOT MIX ASPHALT D-GR TY-D PG 64-22 TON 559 $121.0 $67,639.0 $104.0 $58,138.0 $130.0 $72,670.0 $114.0 $63,726.0 $125.00 $69,875.00 $93.85 $52,462.15 EXEMPT 228 ISS3081 TOMC SAC PG70-22 TON 1,004 $208.0 $20,824.0 $176.0 $176,707.0 $220.0 $220,880.0 $20.0 $20,80.0 $20.00 $20,80.00 $250.0 $251,00.0 229 SS3084-6001 BONDING COURSE GAL 961 $4.50 $4,324.50 $4.05 $3,892.0 $5.0 $4,805.0 54.20 $4,036.20 $9.0 $8,679.0 $5.00 $4.805.0 00 230 SS3085-61 UNDERSEAL COURSE GAL 4,467 $4.50 $20,101.50 $3.85 $17,197.95 $5.0 $22,335.0 $4.0 $17,868.0 $T0 $31,269.00 $12.0 $53,604.00 231 SS6001-6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2 $26,30.0 $52,60.0 $17,246.77 $34,493.54 $75,00.0 $150,000.0 $25,00.0 $50,000.0 $55,650.00 $111,300.00 $12,270.0 $24,570.0 231A SS601-6001 PORTABLE CHANGEABLE MESSAGE SIGN DAYS 56 $125.0 $7,00.00 $56.59 $3,169.04 $10.00 $5,600.00 $250.0 $14,000.0 $2,150.0 $120,400.00 $215.00 $12,040.0 232 SS6004-6031 ITS CO CBL ETHERNET LF 188 $2.0 $376.0 $7.80 $33840 $3.00 $564.00 $2.0 $378.0 $10.00 $1,880.00 $5.60 $1,052.80 233 SS6090-602 ILSN LED SD EA 1 $4,860.0 $4,860.0 $4,10.0 $4,100.0 $5,20.0 $5,200.00 $4,30.0 $4,30.00 $6,850.00 $6,850.00 $19.75 $19.75 234 SS6090-6005 ILSN LED 100 EA 2 $6,600.0 $13,20.0 $5,600.0 $11,20.0 $75,000.0 $30,00.00 $5,90.0 $11,80.0 $8,250.0 $16,50.00 $&DO $10.0 235 SS6306-6001 VIVDS PROSR SYS(ITERIS VANTAGE NEXT EA 2 $13,90.0 $27,80.0 $11,70.0 $23.40.00 $15,00.00 $30,000.00 $12,00.0 $24,000.0 $28,500.0 $57,00.0 $7,828.95 $15,65290 PLATFORM 236 SS6306-6003 VIVDS CAM ASSY VAR LNS(ITERIS VANTAGE EA 4 $7,70.0 $30.80.0 $6,50.0 $26,00.0 $8,50.0 $34,00.0 $6,90.0 $27,60.0 $11,00.0 $44,00.0 $2.034.80 $8,139.20 VECTORW ITH VANTAGE EXIT 237 NE 306-6003 VIVDS CAM ASSY VAR LNS(ITERIS VANTAGE EA 4 $3,440.00 $13,760.0 0 $2,9 .00 $11,600.00 54,000 0 . $16, 0.00 $3,000 00 . $12,000.00 $5,0 .00 $20,0 .00 $2,034.80 $8,139.20 238 SS6306-6005 VIVDS CNTRL SOFTWARE ITERIS EA 2 $1,010.00 $2,020.00 $850.0 $1,70.0 $1,500.0 53,000.0 $90.0 $1,80.00 $825.0 $1,650.00 $687.85 $1,375. 70 239 SS6306-607 VIVDS CABLING LF 2,099 $2.50 $5,247.50 $2.0 $4,198.0 $3.00 $6,297.0 $2.20 $4,617.80 $7.0 $14,693.0 $3.30 $6,926.70 240 FORCE ACCOUNT EROSION CONTROL LS 1 $ 10,000.00 $10,000.00 $10,DDO.00 $10,000.00 $10,000.00 $10,00.00 $10,000.00 $10.00.00 $10,000.00 $10,000.0 $10,000.00 $10.000.00 241 FORCE ACCOUNT-SAFETY CONTINGENCY LS 1 $20,00.00 $20,00.0 $20,000.0 $20,00.00 $20,00.0 $20,000.0 $20,000.0 $20,00.0 $20,00.0 $20,000.0 $20,00.00 $20,00.00 242 IRRIGATION REPAIR LS 1 515,000.00 315,00.0 $15,00.0 $15,00.0 $15,00.0 $15,00.0 $15,00.00 $75,000.0 $15,00.0 $15,00.0 575,00.0 $15.00.00 i Bas.Subtotal wbhout $26,218,325.56 Contin enc Base Bid525.293,235.47 $25,673,907.01 $26,933,596.25 T 7,275,765.08 $28,371,397.00 BaaeTotal with 5 Contingency $27,529,247.66 Wage S o!7 9•E halff Capitol Excavation Company Jamas Construction Group,LLC Patin Construction,LCC I Jordan Foster Construction,LLC Joe Bland Contristion,LLC Engl......Estimate w Description Unit Quantity Unit Price Total Pritnilded Unit Price Total Unit Price Total Unit Price Total Unit Prim Total Unit Price Total 1 MOBILIZATION DEMOBILIZATION AND CLOSEOUT LS 1 $13,100.00 $13.100.00 $10.000.00 $10000.00 $50,000.00 $50,00000 $2,000.00 $2,000.00 $150,000.00 $150,00000 $28.800.00 $28.80000 2 WARRANTY BOND LS 1 $580000 $580000 $10,000.00 $10,000.00 $15.000 00 $15.000 00 $350000 $3,50000 $5,000.00 $5,000.00 3 PREPARE PUBLIC UTILITY EASEMENT,includes clearing and LF 1.175 576.00 $16,80000 $850.00 $998,750.00 $10000 $117,500.00 $20.00 $23,500.00 $100.00 $717,500.00 $7000 $82,250.00 brush removal as Mclured. 4 SILT FENCE,erosion protection as shown on the plans and LF 1,260 $4.50 $5,670.00 $5.00 $6,300.00 $4.00 $5,040.00 $3.20 $4,032.00 $500 $6,300.00 $3.50 $4,41000 outlined in the specifications,complete in place. 5 TRAFFIC CONTROL AND MAINTENCE,as shown on the plans LS 1 $17,300.00 $17,300.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $30,000.00 $30,000.00 $25,000.00 $25,000.00 $10.000.00 $10,000.00 and outlined in the s "ficebons complete in place. 6 12'X 12"WATER LINE CONNECTION TO DI,as shown in the EA 1 $14,500.00 $14,500.00 $5,200.00 $520000 $1500000 $1500000 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $6,500 00 $6,500.00 tans and outlined in the s d8cations complete in place. 12"X 12"WATER LINE CONNECTION TO AC,inducting 7 capping of remaining AC line as shown in the plans and outlined EA 1 $14,500.00 $14,50000 $7,500.00 $7,500 00 $20.000.00 $20,000.00 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $8,00000 $8,000.00 in the s ifications,com late in lace. 12"DI PIPE WATER LINE @ 4'MINIMUM DEPTH,including 6 fittings,bends,marking tape,tracer wire,excavation,backfill. LF 1,260 $214.00 $269,640.00 $150.00 $189,000.00 $115.00 $144,900.00 $262.00 $330,120.00 $350.00 $441,000.00 $185.00 $233,100.00 dewatering,restoration,etc.,as shown on the plans and as outlined in the specifications,complete in place. 9 TRENCH SAFETY,as shown on the plans and as outlined in LF 1,260 $900 $11.34000 $5.00 $6.300 00 $5 00 $6,30000 $340 $4,29400 $5.00 $6,300.00 $300 $378000 the s 'fications,com tete in lace. 24'STEEL CASING FOR OPEN CUT,including spacers,end 10 seals,etc.,as shown on the plans and outlined in the LF 227 $30000 $68,100.00 5450.00 $102,150.00 $25000 $56,750 00 $400.00 $90,800.00 $375.00 $85,125.00 $300.00 $68,10000 s ifications,com let.in place. FLUSH VALVE ASSEMBLY,including 6"piping,fillings, 11 connection,and gate valva,etc.,as shown on the plans and EA 1 $9,100.00 $9,100.00 $5,500.00 $5,500.00 $10.00000 $10,000.00 $6,200.00 $6,200.00 $8,000.00 $8,000.00 $8,500.00 $8,500.00 outlined in the s ificetions,com late in lace. 12'WATER LINE GATE VALVE AND BOX ASSEMBLY,as 12 shown on the plans and as outlined in the specifications, EA 2 $4,880 00 $9,760.00 $6,000.00 $12,000.00 $10.000.00 520,000.00 $5,700.00 $11,400.00 $15,000.00 $30.000.00 $6,000.00 $12,000.00 com late in lace- 13 2'AIR RELIEF VALVE ASSEMBLY,as shown on the plans and E.4 2 $590000 $11,800.00 $7,900.00 $15,800.00 $10,000.00 $20,000.00 $6,000.00 $12.00000 $8.500.00 $17,00000 $1000000 $20,000.00 outlined in the s ifications,com late in lace. 14 WATER LINE DISINFECTION AND TESTING,as shown on the LS 1 $14,700.00 $14,700.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $4,100.00 $4,100.00 $8.000.00 $8,000.00 $7,000.00 $7,000.00 ens and as outlined in the s ificetions,com late in lace. PAVEMENT REPAIR, induding ho[-mix asphaltic concrete and 15 flexible base,as shown on the plans and outlined in the SY 3.5 $740.00 $2,590.00 $1,000.00 $3,500.00 $1,000.00 $3,500.00 $800.00 $2,800.00 $500.00 $1,750.00 $40000 $1,400.00 specifications,complete in place. 16 HEAVY DUTY CONCRETE DRIVE REPAIR,as shown on plans SY 14 $590.00 $8,26000 $150.00 $2.100.00 $75.00 $1,050.00 $350.00 $4,900.00 $200.00 52,800.00 $2,000.00 $28.000.00 and as outlined In the edfications,complete in lace. 17 TREE REMOVAL(N0.339),as shown on plans and as LS 1 $9.000.00 $9,000.00 $5,000.00 $5,000.00 $15,000.00 $15,00000 $1.500.00 $1,500.00 $25,000.00 $25,000.00 $50000 $500.00 outlined in the s 'ficetions,com late in lace. TREE PROTECTION(NOS 306,325,335,343,344 and 345), 18 as shown on the plans and outlined in the specifications, LS 1 $17,300.00 $17,300.00 $15,000.00 $15,000.00 $5.000 00 $5,000.00 $3,200.00 $3,200.00 $5,000.00 $5,000.00 $500.00 $500.00 complete in pitace FLOWABLE FILL(STA 6=73.04 TO STA 8+00),installed 19 around the proposed 12'BCMUD avatar line as shown on the L F 127 $130.00 $16,510.00 $11000 $13,970.00 $4000 $508000 $178.00 $22.606.00 $100.00 $12,700.00 $2000 $2,540.00 tans and outlined in the s dficatlons,com lets in place. SPLIT RESTRAINT HARNESS(127 LF),installed on the 20 existing Round Rock 16'DI water line,as shown on the plans FA 7 $3,450.00 $24,150 00 $1,500.00 $10,500.00 $1.500 00 $10.500 00 $2,500.00 $17,500.00 $2,500.00 $17,500.00 $500000 $3500000 and outlined in the s 'fixations,com late in lace. 21 REMOVE AND ABATEMENT OF 12"AC PIPE,as shown on LF 590 $83.00 $48,970.00 $100.00 $59,000.00 $40 00 $23,600.00 $108.00 $63,720.00 $150.00 $88,500.00 $45.00 $26,550.00 the tans and outlined in the specification,complete in lace. 22 ABANDON 12"AC PIPE,as shown in the plans and outlined in LF 730 518.50 $13,505.00 $125.00 $91,250.00 $3000 $21,900.00 $24.00 $17,520.00 $100.00 $73,000.00 $25.00 $16,250.00 the specifications,filled with flow a fill,com late in lace. Page 6 of 7 e:e halff Capitol Eacavat e,Company James Construction Group,LLC Patin C...t—ion,LCC Jordan Foster Construction,LLC Joe Bland Contristion,LLC Englne.e.Estimate Alsrnrte Bid it" Descriptlob Unit Quantity Unit Price TOW Provided Unit Prim Total Unit Price Total unit Prim Total Unit Prim TOM Witt Price Tated Alternate Subtotal $605,180.00 without Contingency Alternate Bid $624,395.00 $1,598,820.00 $596,120.00 $675.682.00 $1,160,475.00 Alternate Total with $865,698.00 10%Contingency i Base+Alternate Subtotal without $26,823,505.58 Contingency Base+Altemate Bid $25.917,63047 $27,272,727.01 827,529,716.25 $27,951,447.06 529,531,872.00 Base+Alternate with 5%and 10% 828,194,939.86 Contingency (Respectively) Note 1:Bid Total for James Construction has been corrected to increase$0.01 more that the total amount shown on their bid forth.The suspected reason for the difference is rounding. �ayN i o Engineer's Opinion of Probable Construction Cost group June 21,2024 WYOMING SPRINGS ROAD WATER LINE RELOCATION BRUSHY CREEK MUNICIPAL UTILITY DISTRICT(BCMUD) MRB GROUP PROJECT NO. 0226.22010 ITEM NO ITEM DESCRIPTION QUANTITY UNITS UNIT COST ESTIMATED COST 1 Mobilization/Demobilization (@5%) 1 EA $ 28,800 $ 28,800 2 Prepare PUE 1,175 LF $ 70 $ 82,300 3 Silt Fence 1,260 LF $ 3.5 $ 4,400 4 Traffic Control 1 LS $ 10,000 $ 10,000 5 12x12 Connection, DI 1 EA $ 6,500 $ 6,500 6 12X12 Connection,AC 1 EA $ 8,000 $ 8,000 7 12" Water line,open cut 1,260 LF $ 185 $ 233,100 8 Trench Safety 1,260 LF $ 3 $ 3,800 9 24"Steel casing open cut 227 LF $ 300 $ 68,100 10 Flush valve assembly 1 EA $ 8,500 $ 8,500 11 12 Water line gate valve and box 2 EA $ 6,000 $ 12,000 12 2"Air relief valve 2 EA $ 10,000 $ 20,000 13 Water line disinfection 1 EA $ 7,000 $ 7,000 14 Pavement repair 3.5 SY $ 400 $ 1,400 15 Heavy duty concrete drive repair 14 SY $ 2,000 $ 28,000 16 Tree removal (No 339) 1 LS $ 500 $ 500 17 Tree Protection(Nos.306,325,335,343,344 and 345) 1 LS $ 500 $ 500 18 Flowable Fill(Sta 6+73.04 to sta 8+00) 127 LF $ 20 $ 2,500 19 Split Restraint Harness(127 LF) 7 EA $ 5,000 $ 35,000 20 12"AC Pipe Removal and Abatement 590 LF $ 45 $ 26,600 21 12"AC Pipe Abandonment 730 LF $ 25 $ 18,300 SUBTOTAL 605 300 Contingency @ 10% $ 60,500 '�PEOF.tF�s11 TOTAL $ 665,800 i 5;• �l ................................ / THOMAS E.CAPONI if 54723 �I '•..( Eo.� . •...... _ N:\0226.22010.000\Ca1cs\Cost Estimate Final Revised 061724 �� sbNALE TV,4e Z� Z OZ V. halff To: Dawn Scheel, P.E. Date: 8/19/2024 (Updated 8/20/2024) City of Round Rock Transportation Department From: Eric Ratzman, P.E. Email: eratzman@halff.com Subject: Wyoming Springs Dr—Segment 1 Award Recommendation Letter& Bid Analysis Dear Ms. Scheel, Bids for the Wyoming Springs Drive—Segment 1 project were opened and read aloud at the City of Round Rock, on Wednesday, August 14, 2024, at 2:00 pm and the following five bids were received: • Capital Excavation Co.- Base Bid: $25,293,235.47 Alternate Bid: $624,395.00 Base + Alternate Bid: $25,917,630.47 • James Construction Group, LLC- Base Bid: $25,673,907.01 Alternate Bid: $ 1,598,820.00 Base + Alternate Bid: $27,272,727.01 • Patin Construction, LLC- Base Bid: $26,933,596.25 Alternate Bid: $ 596,120.00 Base + Alternate Bid: $27,529,716.25 • Jordan Foster Construction, LLC- Base Bid: $27,275,765.06 Alternate Bid: $675,682.00 Base + Alternate Bid: $27,951,447.06 • Joe Bland Construction, LLC - Base Bid: $28,371,397.00 Alternate Bid: $ 1,160,475.00 Base + Alternate Bid: $29,531,872.00 One minor($0.01) math correction was made to the Total Base Bid amount for James Construction Group, which was inconsequential in terms of which contractor has the lowest bid. Based on being the lowest responsive bid, we recommend award of the construction contract to Capitol Excavation Company. Reminder that the alternate bid should submitted to the BCMUD ("District") in accordance with item 6.02 of the city's interlocal agreement with them. The lower bidder's Alternate Bid of$624,395.00 is less than the District's Design engineer's 100% design submittal estimate, which totaled $665,800. If you have any questions regarding this bid tabulation, feel free to call me at (512) 777-4620. Sincerely, Eric J. Ratzman, P.E. Senior Project Advisor Attached: Bid Tabulation; District's Alternate Bid cost estimate Brushy Creek Water •!' ,,: �+�,1 �'�,:x..rs�e - ;, Line Location y 'r"'.ar4 �:c �" w✓ A F7 ,� �, l .� ! �„Tula.._ _y fr. } �� .•�,�p;'i. � '" � .J :Jt °V,,M. '�, a er. It �� J;• M • Q� L�CI•�.'7°�• rte. � y �� •�i' � ��F !. .t• _ Y�•�,�r;♦wy� 1SfY "�. aC J. .-.,[ w ='�7�Q._,,,�J�1 ��� �1 W � ?• �'�� 'y• reP F -'4,r .tea},,�� •�+ +` a_ ��f'� ! � IL 3 w w � � ' l .�tr. �t . ac ; � Fc' R .M�4�? wlFr /�2..� Sii�t 'Lw 'J7a `i.t�.► ..Ie;•`•f1,a ..ih1 y�.,;c+�i����'I,a• ♦i: •�' fry'hi . _ _ r .,, } _ r "ji'7j+•�' a-$W1.4 `.0 tia �re!{ i' +i_ ' t, R:Y^1F'r'.. ' _ 7 `e wt_. • r.• y- T !_� r, _ .,„ Z," � 'l•• S� �^ R•'j,i' • ert: • pt.•:i% y �t 1iJ t,•�.:t)` ..�,PF. •`•af wt. Sr••.!.�`t'�-" "117 �'-. i�i '"�';n `'•,.� a;r ���r °� � {t .t. �+� yt `•.�L"'wwi*rT1K __! R1 -4- C: h'� •^ �► ��' �` •�'jrr'6 !t r.. � •�\�. .+► • l�.�1. ✓ ��`.` ,� ..4r r�..:; � + .." .� �:''R •.�e��.rt N"r` �.•.l' � � .�'"7 E.: .�1'.-y r�f� �.. gi w!✓ r_ ., ai a ''a q ., ..r ^, r• 4 I 1 t M•.• k• +Y iy r • f c' � of � i «t., ��J f'� 9 �L t/R � •� 'R t" � r '.I�_.i.' J •�"��+'' •s•Y .'-( .., ' r `� >'yp�jr'F �' a?!G `.)f "a5sa ti'A _..r ? �. J� �'1• '• �k�_�! J �, r.ctir-4 ♦ d.. * •.j P Vit-) i ..f , i .r� t. .`.q��� a, �•r•• 1`� w,Y f'�1�•� '., jf�Y �' '' i rr�i �� ' � f ^(� �;'y�• �'�+t ft• •:' � .� '.1 I�f►� - ��• �?• t��,� � ,�t":s„R!t�+'""�'t:_I'��r :�r•' ,�,,. � •` :'7'e�j xY `r � P ..i ��;t�a ~+r �h'- IK �•1�C�1 .�i6't f <AJf. w.dJ�,ty,r. •�it..J.w fl;,fir•. .*� i• i•. �,"•,,�. :mil ry 1 /•�.• yam• '� r•. ��������61' ..�� •STI' �� F�� Jr"��'i! �'` ,16 � 'a'W°' Gid r•� — _ �'•` i � t. 'PT r Tsrtl'- r�`_ •�•. �,yl•�.p . t3^i,.l�j•,L� S Idt�.s _ ,` ��'�'' '�`s� i ,�,� •�� �'•}•�`v►3�` �� 'ti4� �".�,. (�j.' �' r t k t�'`.-'�4♦ ��'. �T'� _ c,,�,.i r 7Y � r,�� � yc ...�„`fir 1 '�'. ,•1_ ,} ” �• � "ice' '' .,-_!�.- r<+• s•'�-',• '• d' .�+. � �s+'ij:'Y •' -f_,`,.. '�.�w i,r�lkeliT;�S'`I r�r,'�1 +`, .t^ " � •r•t'. r, ;•.^, .;,i Legend Wyoming Springs Segment 1 n Wyoming Springs Segment 1 ROUND ROCK Round Rock Public Works Department R '! x� � August 2024 �� sao 1 000 reel