R-2024-262 - 9/26/2024 RESOLUTION NO. R-2024-262 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Underground, Inc. for the Lake Creek Wastewater Line Replacement Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Austin Underground, Inc. for the Lake Creek Wastewater Line Replacement Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 26th day of September, 2024. CRAIG ORG , Mayor City of Round R ck, Texas AT ST: A FRANKLIN, City Clerk 0112.20242:4892-0281-7508 EXHIBIT Page I of 3 „A„ -10 Contract Quantity Adjustment/Change Omer In—= r., rev,Ol'6 Department: UES Project Name: Lake Creek Wastewater Line Replacement Date: 7/25/24 City Project Change Order/Quantity ID Number LC1P1 Adjustment No. 4 Vendor Austin Underground,Inc. P.O.Box 5650-Lago Vista,Texas 78645 (512)535-3285 Company Name Address Phone No. Justification Change Order/Quantity Adjustment No.4 is for the additional reimbursement for rail line inspection and rail line survey during installation of the wastewater under the railroad track at two locations.This change order also includes the raising several installed manholes. SUMMARY Amount %Change Original Contract Price: $3,591,170.00 Previous Quantity Adjustment(s): -$57,217.50 This Quantity Adjustment: $150,000.00 Total Quantity Adjustment(s): $92,782.50 Total Contract Price with Quantity Adjustment(s): $3,683,952.50 Previous Change Order(s): $53,924.86 1% This Change Order: $12,223.77 0% Total Change Order(s)To Date: $66,148.63 2% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $3,750,101.13 Difference between Original and Adjusted Contract Prices: $158,931.13 Original Contract Time: 240 Time Adjustment by previous Quan.Adj./Change Order: 360 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 600 7Prepared : Christopher Perkins, Principal Engineer,Round Rock Signature Printed Name,Title,Company Date Valentin 1 Contractor: Gomez,Jr. oe Sign Printed Name,Title,Company Date City Project Manager: v7 Christopher Perkins,Principal Engineer,Round Rock Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Contract Quantity Adjustment/Change Order Project Name: Lake Creek Wastewater Line Replacement Quan.Adj./Change Order No.: 4 Change Order Data Contract Time Adjustment Item Item Description Unit Qty. Unit Price Amount (Days) CO 4-1 Raise 3 manholes to required grade. LS 1 $12,223.77 $12,223.77 0 Page 3 of 3 Contract Quantity Adjustment/Change Order In— , Project Name: Lake Creek Wastewater Line Replacement Quan.Adj./Change Order No.: 4 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment Cost for RailPros for Rail Line Inspection during installation of the Steel Encasement Pipe under Rail Road ROW.Reimbursement to pay RailPros 28 Invoice plus 15°o LS 1 $125,000.00 $125,000.00 Cost for UPRR Certified Rail Survey to provide surveying of Centerline of Track during installation of the Steel Encasement Pipe under Rail 29 Road ROW.Reimbursement to be paid Invoice plus 15%. LS 1 $25,000.00 $25,000.00 ;.v..✓," `tet g '� , Dm�fl - - i ' • • 253 -a oo o'f{ 1 ti ter - . !Mn 11�� Completed Railroad Crossing �5 t �T" ' Of i Remaining Railroad Crossing • Manholes Lake Creek 1 WW Interceptor Lake Creek 1 Wastewater Interceptor Ro�NORo�k Gravity Mains