CM-2024-249 - 9/27/2024STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 6 TO CONTRACT FOR ENGINEERING SERVICES FIRM: BGE, INC. ("Engineer") ADDRESS: 101 West Louis Henna Boulevard, Suite 400, Austin, TX 78728 PROJECT: Red Bud Lane North This Supplemental Contract No. 6 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and BGE, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 12th day of September, 2019 for the Red Bud Lane North Project in the amount of $436,411.52; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on February 25, 2021 to amend the scope of services and to increase the compensation by $689,788.50 to a total of $1,126,200.02; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on May 26, 2022 to amend the scope of services and to increase the compensation by $49,912.00 to a total of $1,176,112.02;and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on October 27, 2022 to amend the scope of services and to increase the compensation by $128,389.00 to a total of $1,304,501.02; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on April 7, 2023 to amend the scope of services and to increase the compensation by $49,688.00 to a total of $1,354,189.02; and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 on January 19, 2024 to amend the scope of services and to increase the compensation by $56,436.00 to a total of $1,410,625.02;and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $24,040.00 to a total of $1,434,665.02; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Supplemental Contract Rev.06/16 0199.1947;4856-9969-7}26 � 84275 Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $24,040.00 the lump sum amount payable under the Contract for a total of $1,434,665.02, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.1947; 4856-9969-7126 84275 BGE, INC. By. - Eric Busker, PE 09/20/2024 Date Supplemental Contract Rev.06/I6 0199.1947; 4856-9969-7126 84275 CITY OF ROUND ROCK By: �I�CCdu-C �, Laurie Hadley, City Manager Date Supplemental Contract 0199.1947; 4856-9969-7126 APPROVED AS TO FORM: tephani'e L. Sandre, OITAttorney Rev.06/16 84275 Red Bud Lane North City of Round Rock From US 79 to Paloma Lake Blvd Exhibit B Services to be Provided by the Engineer ADDENDUM TO EXHIBIT B Engineering Services The work to be performed by the ENGINEER under this contract consists of providing engineering services required for the development of construction plans for the widening and reconstruction of Red Bud Lane from US 79 to Paloma Lake Blvd and along CR 122 approximately 500' and along Old Settler's Road approximately 600LF. The project consists of reconstructing approximately 1.5 miles of the existing 3-lane roadway section to a 4-lane divided facility and adding a right turn lane on CR 122. This project involves surveying, geotechnical, environmental, public involvement, engineering analyses, and associated details necessary to produce PS&E to a 100% design. The ENGINEER shall perform all work and prepare all deliverables in accordance with the latest version of the City of Round Rock criteria. The ENGINEER shall perform quality control and quality assurance (QA/QC) on all deliverables associated with this project. The ENGINEER shall provide traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD) when performing onsite activities associated with this contract. RIGHT OF WAY DATA (Function Code 130) 1. Subsurface Utility Engineering (Halff Associates, Inc.) A. The Engineer shall perform Subsurface Utility Engineering (SUE) services on the Red Bud Lane North Project. Proposed 6 Level A test holes. B. Subsurface Utilitl Engineering ( including utility investigations subsurface and above ground prepared in accordance with AASHTO standards [ASCE C-1 38-02] and Utility Quality Levels as follows. i. Utility Quality Levels are defined in cumulative order (least to greatest) as follows: • Quality Level A - Locate (6 additional test holes): Three-dimensional mapping and other characterization data. This information is obtained through exposing utility facilities through test holes. Actual locations are tied to survey control (performed by surveyor). Incorporates quality levels B, C and D information to produce Quality Level A. 2. Utility Coordination (Halff Associates, Inc.) A. Utility Engineer including the identification of utility conflicts, coordination, compliance with City of Round Rock standards, and resolution of utility conflicts. The Engineer shall coordinate all activities with the City of Round Rock, or their designee, and will be responsible for the following: i. Coordination with Utility Companies: Additional meetings and coordination with Atmos, Spectrum, and Oncor, including: a. Evaluate Impact of revisions: The Utility Engineer shall evaluate the relocation plans of the affected utilities and advise on any changes that need to be made. Sheel 1 of 2 Red Bud Lane North City of Round Rock From US 79 to Paloma Lake Blvd Exhibit B Services to be Provided by the Engineer b. Review Estimates and Schedules: The Utility Engineer shall review the revised utility adjustment estimates for reasonableness of cost and the timely scheduling of the adjustment. C. Review the Revised plans for compliance with City of Round Rock standards and proposed location data. The responsibility for quality and accuracy of Utility adjustment plans will remain with the Utility Company. d. Coordination on construction timeline for each utility relocation, and ensure construction timelines are on schedule and coordinate adjustments as needed. Sheet 2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page z I ! ` ; \ ; §f ! ! ) ! J } ! k k \ � FFF ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page HAIFFASSOCIATES PROJECT NAME: RED BUD NORTH FROM US]9 TO CA 117 EXHIBIT O-FEE SCHEDULE UTILITY SR UTILITY CAODI SR SURVEY SURVEY 2MAN SUE 1MAN ]MAN CONTRACT ADMIN TOTAL LABOR TASHIDESCRIPTION MANAGER ENGINEER COORDINATOR GIS MANAGER TECH SURVEY CHEW SUE SUE ADMIN ASSISTANT MAN- CHARGES TECH RPLS CREW MANAGER CREW CREW SPECIALIST HOURS TASK SUBSURFACE UTILITY ENGINEERING ISUE) SUE LEVEL A (up lob MIT U.K.) NU¢50IROMI 0 f ],500.00 SUE LEVEL El 3 16 12 2G 55 f S,WOAO SUBTOTALNOURSICOSTS 0 0 0 ] 0 16 0 12 24 0 0 0 s5 E 1]0]0.00 TASK UTILITY ADJUSTMENT COOROINATIONIENGINEERINO COORDINATION OF ENOWEERING ACTRUNES 3 60 5 80 S 10.5I0.00 MEETINGS IT public 02 InCIVItlual With eMh UUllyl 0 f - REVIEWPROPOSEDADJUSTMENTSMOOROMATECOMPLIANCE 0 f - D s sueroTu xouRSlDDsrs 3 B e0 D D G D D B o o s 6e s +o s]on0 FEE SUMMARY TASK SUBSURFACE UTILITY ENGINEERING ISUE) 55 f 13AIDAO TASK UTILITY ADJUSTMENT COORDWATIOWENGINEERWG 06 S10 ]GAO TOTAL NOU0.5 3 0 05 ] 0 16 - 0 13 3A 0 0 5 +9 RATESAl f E31500 519500 Et60.00 595.00 S19OW E12OW Et]000 E150.00 EB500 Et]11.00 E05.00 Efi5 C0 BASE SALAIRIES 6 REIMB'S TOTAL E645 SO VIEW E295 E0 $1 GO 1 EO Et]25 $2040 E0 EO $325 $2I OOG.W