Loading...
CM-2024-266 - 10/25/2024Page I of 3 It-- mv. ouie Department: Project Name: City Project ID Number Contract Quantity Adjustment/ Change Order Public Works - Utilities & Environmental Services 30" Raw Waterline Relocation on DB Wood Road Date: 10/16/24 Change Order/Quantity CIP24-00002 Adjustment No. 2 Vendor Royal Vista, Inc. 350 CR 260, Liberty Hill, TX 78642 512-515-6824 Company Name Address Phone No. Justification Additional quantity of encasement and pipe is needed to make the connection along DB Wood Road due to a conflict with a curb inlet installed with the DB Wood Road widneing by the City of Georgetown SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Pius Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: 240 0 0 New Contract Time: 240 n Prepared By: Adam Levy, P.E. City of Round Rock 10/17/24 Signature Printed Name, Title, Company Date 0% $0.00 0% $0.00 0% $1,613,701.00 -$8,720.00 Contractor: c� Q,H, 7�)2./ ",I, Stevan DeLeon, Project Manager, Royal Vista Inc. 10/17/2024 Signature Printed Name, Title, Company Date City Project Manager: %�' Adam Levy,P.E., City of Round Rock 10/17/24 Signature �% Printed /Name, Title Date Mayor/City ! N r � "�/ I� r� A o,4 , + 0 ^�,y fr l0 Manager ,�py�w.�. Signature Printed Name, Title Date e�� 2-,(� -,-2-� 2-&( Page 2 of 3 Contract Quantity Adjustment/Change Order Project Name: 30" Raw Waterline Relocation on DB Wood Road Quan. Adj./Change Order No,: Chance Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Davs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order 4-*119" m., alrlk Project Name: 30" Raw Waterline Relocation on DB Wood Road Quan, Adj./Change Order No,: uanti Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment f naval 15 Trench Excavation Safety Protective Systems All Depths) LF 20 $5.00 $100.00 0 17 Factory Restrained Joint Pipe, 30" Dia, Class 250 Ductile Iron (All Depths) LF 20 $535.00 $10,700.00 0 19 Encasement Pipe 48" Dia., Steel, Open Cut, 3/8" Thick LF 20 $275.00 $5,500.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.01) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $D.00 0.00 $0.04 $0.00 $0.00 16 300.00 O rµnY •Fy� ,C IF • 1+I 4 T .' Ap 13. Pi ! ' -� �ri'�h (S'�"tti� �w Y. :ti r•I i'I'r�j `.S. c � .� �1 {j� .3 f '.+'r_1'� 111 .4?{, • � � ��'. ;,.' r i,�,]� '{�}i} I' ids.. IP■■ {{•y� • �� l� r- it �iti3��� {! i w'y vim {a ' `� � �• q } 5• ,il I>sli}yf '•.kyr' ,,,� r*#� .�-i.i5 .i�� +' +��a +i �'��'��r� ♦} 3Jr•N F f i '�F.'j.YN - 1[U 'PX 1 �X �_r �t�'}'y x �y •Y � f' �� LN 4Li � nr i„. '��ta .�,ry • ��- � - F,,�'�'-�•i'- -^fi +Y �yktk; �-�}� J'XMi���a� f fel f' � ' R.r'? �r . { '-f�f `.# ' "af ' � ■ ��� e{;��f`�}�➢Ii';ti�.a:' *..�J�_t�w�'lr�'��L:���e-t' ii ��'� 1+F'�L�.,�`�+#:�c;'� 3.1NMI I'R�i,�;i�*.+��n�l.*�'(f'tir���'i��$rf�' �i�'1, L_ Y .iLJ��•� .� �}' �q!'4� f �1*� �1• L!E.R� -An ='� 1,Y r:}'lA. ',I�YT"a�1 �i 9—,�t,;t'•� �� +�,+ JEIr� o�c��