R-2024-290 - 11/7/2024 RESOLUTION NO. R-2024-290
WHEREAS, the City of Round Rock ("City") wishes to enter into a Reimbursement
Agreement with Atmos Energy Corporation ("Atmos") for the extension of a gas service for the Multi-
Purpose Complex portion of the Old Settlers Park Buildout Project("Project"); and
WHEREAS, Atmos agrees to extend gas service to the proposed Multi-Purpose Complex
portion of the Project; and
WHEREAS, the City wishes to enter into a Reimbursement Agreement ("Agreement") with
Atmos to outline each party's obligations regarding the extension of the gas service, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City a
Reimbursement Agreement with Atmos Energy Corporation for the extension of gas service to the
Multi-Purpose Complex portion of the Old Settlers Park Buildout Project, a copy of same being
attached hereto as Exhibit "A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 7th day of November, 2024.
CRAI MORG , Mayor
City o Round ock,Texas
AT ST:
AN FRANKLIN, City Clerk
0112.20242:44872-5826-3028
EXHIBIT
REIMBURSEMENT AGREEMENT
Atmos Energy Corporation, ("Company") and the City of Round Rock ("Applicant"), whose
address is 221 East Main Street, Round Rock, Texas 78664, for good and valuable consideration,
the receipt and sufficiency of which is hereby acknowledged, agree as follows:
1. Company will extend gas service as identified in"Exhibit A," attached and made a part
hereof(the"Project").
2. Upon execution of this Agreement, Applicant will deposit with Company $518,344 which is
equal to the preliminary Ballpark Estimate("Exhibit B")for the Project. Within 120 days after
the completion of the Project,Company will forward a statement to Applicant setting forth the
total of the actual costs incurred by Company for the Project. If said actual costs are in excess
of said initial Ballpark Estimate of up to a cap of 120% (20% x $518,344 = $103,669) of the
Ballpark Estimate, then Applicant will, within 30 days after receipt of such statement,
reimburse Company for all such additional costs not to exceed $622,013. If the statement
establishes that the actual costs for the Project were less than the Ballpark Estimate, then
Company will, together with the statement, refund to Applicant the difference between the
actual costs for the Project and the Ballpark Estimate.
3. If easements are required, Applicant will provide Company two executed and notarized
originals of the easement. Applicant will provide Easement exhibits in the form of a certified
(Texas Registered Professional Land Surveyor)plat and metes/bounds description of the new
easement. In addition, Applicant agrees to provide Company necessary temporary working
easement and access to easement in order to design & construct Project.
4. Company's obligation to undertake the Project is subject to applicable laws, rules, and
regulations of governmental authorities and to any delay occasioned by force majeure or events
or conditions of whatever nature,which are reasonably beyond Company's control. Applicant
understands that Company will not be obligated or required to undertake the Project prior to
the construction of projects covered by contracts and authorizations that were entered into by
Company prior to the date of execution of this Agreement by Company(the"Effective Date"),
the construction of projects required to be constructed by the provisions of Company's
franchise, or construction or repair required to maintain existing service.
5. Applicant will be responsible for any landscape restoration work required after Company has
completed the Project,unless specifically stated in the project scope. To the extent allowed by
Texas Law, Applicant agrees to hold Company harmless from any and all claims,demands,or
judgments by other parties as a result of such restoration.
6. Title to the Project, including appurtenances, connections thereto, and extensions thereof, and
including the right to use, operate, and maintain the same, will forever be and remain
exclusively and unconditionally vested in Company, its successors and assigns.
7. Applicant will be responsible for any additional costs incurred by Company because of
Applicant's failure to perform any of the obligations required of Applicant under this
Agreement.
0
8. THIS AGREEMENT WILL BE CONSTRUED IN ACCORDANCE WITH THE LAWS OF
THE STATE OF TEXAS,IRRESPECTIVE OF ANY CONFLICT OF LAWS PROVISIONS.
9. In no event will any Party be liable to any other Party or any third party for any incidental,
special, indirect, consequential, punitive, or exemplary damages that might occur as a result
of,relating to,or arising out of the Parry's obligations under this Letter Agreement.
10. This Agreement constitutes the final expression of agreement between the parties and parol or
extrinsic evidence is inadmissible to explain, vary, or contradict the express terms of this
Agreement.
If the foregoing terms are acceptable to Applicant,please indicate by signing two(2)copies of this
Relocation Agreement in the spaces provided below and return both to this office for execution by
Atmos Energy. It is understood and agreed that this Relocation Agreement is conditioned on the
approval of Atmos Energy's management as evidenced by Atmos Energy's execution in the space
provided below. Following Atmos Energy's execution, one (1) fully executed original of this
Letter Agreement will be returned for your file.
City of Round Rock,a Texas Home Ruled Atmos Energy Corporation
Municipal Corporation
By: By:
Printed Name: Craig Morgan Printed Name: Marco Delira
Title: Mayor Title: Manager Engineering Services
Date: Date:
1
Exhibit "A"
Project Description—Install approximately 1,520 linear feet of 6" IP HDPE gas main along the
south side of East Old Settler's Boulevard from Harrell Parkway to the subject property. Scope
also includes one (1)road bore across Harrell Parkway to serve future Developments by the City
of Round Rock.
a ._.._ • ` 1. .„; + ,_._ .ram* _ '1 ; k%• • 1;
k ems'' ) Proposed On site Main Extension'�
;_ink. Existing 6-gas main to tie Into .- - . , .r * <* ; '
dikix . •II,*
..o.., • 4 1 \ ilPilattWl•
-- sot . z.-;- -_-,.."-„, -. ,
! , . ..0
. - A,A _ _ .
a i „.
4�
N.44..
rdt
,( 3B ,
, //r iltiI
j L
t i• .
{00009545/v2/CMCNABB/ECODEVO/00014/9/13/2017} 1
Exhibit "B"
CORR Old Settlers Park -West Offsite 09/18/2024
Project No. 080.87109 /2778635322
Williamson County,TX
EXECUTIVE SUMMARY
Item Estimated
Description Cost
1 Materials(Direct Quote from Material Supplier) $62,965
2 Contractor Labor(Itemized Below) $430,439
3 Company Labor $24,940
4 Corporate Overheads (Removed from Estimate) $0
5 Interest Carrying Costs (Removed from Estimate) $0
6 Franchise Fee(Removed from Estimate) $0
ESTIMATED PROJECT TOTAL COST $518,344
Estimation Assumptions:
1 MATERIALS
6" HDPE Pipe,Tie-In Material, and Miscellaneous Fittings
CONTRACTOR LABOR
2 Includes Contract Engineering, Pipeline Construction Contractor, Third-Party ROW,
Third-Party Environmental, and Third-Party Inspection Costs
3 COMPANY LABOR
Includes Project Management, Construction Management, and FCC Inspection