Contract - Atmos Energy Company - 11/7/2024 (3) REIMBURSEMENT AGREEMENT
Atmos Energy Corporation, ("Company") and the City of Round Rock ("Applicant"), whose
address is 221 East Main Street, Round Rock, Texas 78664, for good and valuable consideration,
the receipt and sufficiency of which is hereby acknowledged, agree as follows:
1. Company will extend gas service as identified in"Exhibit A,"attached and made a part
hereof(the"Project").
2. Upon execution of this Agreement, Applicant will deposit with Company $537,912 which is
equal to the preliminary Ballpark Estimate("Exhibit B")for the Project. Within 120 days after
the completion of the Project, Company will forward a statement to Applicant setting forth the
total of the actual costs incurred by Company for the Project. If said actual costs are in excess
of said initial Ballpark Estimate of up to a cap of 120% (20% x $537,912 = $107,582) of the
Ballpark Estimate, then Applicant will, within 30 days after receipt of such statement,
reimburse Company for all such additional costs not to exceed $645,494. If the statement
establishes that the actual costs for the Project were less than the Ballpark Estimate, then
Company will, together with the statement, refund to Applicant the difference between the
actual costs for the Project and the Ballpark Estimate.
3. If easements are required, Applicant will provide Company two executed and notarized
originals of the easement. Applicant will provide Easement exhibits in the form of a certified
(Texas Registered Professional Land Surveyor)plat and metes/bounds description of the new
easement. In addition, Applicant agrees to provide Company necessary temporary working
easement and access to easement in order to design &construct Project.
4. Company's obligation to undertake the Project is subject to applicable laws, rules, and
regulations of governmental authorities and to any delay occasioned by force majeure or events
or conditions of whatever nature, which are reasonably beyond Company's control. Applicant
understands that Company will not be obligated or required to undertake the Project prior to
the construction of projects covered by contracts and authorizations that were entered into by
Company prior to the date of execution of this Agreement by Company(the"Effective Date"),
the construction of projects required to be constructed by the provisions of Company's
franchise, or construction or repair required to maintain existing service.
5. Applicant will be responsible for any landscape restoration work required after Company has
completed the Project,unless specifically stated in the project scope. To the extent allowed by
Texas Law,Applicant agrees to hold Company harmless from any and all claims,demands,or
judgments by other parties as a result of such restoration.
6. Title to the Project, including appurtenances, connections thereto, and extensions thereof, and
including the right to use, operate, and maintain the same, will forever be and remain
exclusively and unconditionally vested in Company, its successors and assigns.
7. Applicant will be responsible for any additional costs incurred by Company because of
Applicant's failure to perform any of the obligations required of Applicant under this
Agreement.
0
R -�0'4(1-OAI
8. THIS AGREEMENT WILL BE CONSTRUED IN ACCORDANCE WITH THE LAWS OF
THE STATE OF TEXAS,IRRESPECTIVE OF ANY CONFLICT OF LAWS PROVISIONS.
9. In no event will any Party be liable to any other Party or any third party for any incidental,
special, indirect, consequential, punitive, or exemplary damages that might occur as a result
of,relating to,or arising out of the Party's obligations under this Letter Agreement.
14. This Agreement constitutes the final expression of agreement between the parties and parol or
extrinsic evidence is inadmissible to explain, vary, or contradict the express terms of this
Agreement.
If the foregoing tenons are acceptable to Applicant,please indicate by signing two(2)copies of this
Relocation Agreement in the spaces provided below and return both to this office for execution by
Atmos Energy. It is understood and agreed that this Relocation Agreement is conditioned on the
approval of Atmos Energy's management as evidenced by Atmos Energy's execution in the space
provided below. Following Atmos Energy's execution, one (1) fully executed original of this
Letter Agreement will be returned for your file.
City of Round Rock, a Texas Home Ruled Atmos Energy Corporation
MunANarne:
atio
By: By: ' �'?✓
Printaig Man Printed Name: Marco Delira
Title: Mayor Title:Manager Engineering Services
Date: rq Date: 11113/zj
1
Exhibit "A"
Project Description—Install approximately 1,250 linear feet of 6" IP HDPE gas main along the
western right of way of Kenney Fort Boulevard from Homestead Farms Drive to the subject
property. Scope also includes one (1)road bores across Kenney Fort Boulevard to serve the
future Rec Center/Admin Building Developments proposed by the City of Round Rock.
11
•1
411. /1111, i C./111 V11144'
22 PROPOSED'REC CENTER/ADMIN -_r- — , '-'
Y r.
z
BUILDING DEVELOPMENT
f-I I
tx [01
(ilk .4.01
, ,, !,�
R
t
W a
0
t * 1 it 4.. .,... :r, " .... 47.„----------\\,_
ii ,c-c, '
.:A "
) r
,
N J
p1940 00 i , -
` AL
r R/
v
.010
' P'''' ' ..; . ,i , ,, , . ..
,....,,, . , , i , .
.,
.. t ,
, ,,,,.. .
et
,.. r
iiiiiiiiiismel
{00009545/v2/CMCNABB/ECODEVO/00014/9/132017) I
Exhibit "B"
CORR Old Settlers Park -West ADMIN 09/25/2024
Project No. 080.87693 /2852986597
Williamson County,TX
EXECUTIVE SUMMARY
Item Estimated
Description Cost
1 Materials(Direct Quote from Material Supplier) $23,435
2 Contractor Labor(Itemized Below) $502,007
3 Company Labor $12,470
4 Corporate Overheads (Removed from Estimate) $0
5 Interest Carrying Costs (Removed from Estimate) $0
6 Franchise Fee (Removed from Estimate) $0
ESTIMATED PROJECT TOTAL COST $537,912
Estimation Assumptions:
1 MATERIALS
6" HDPE Pipe,Tie-In Material, and Miscellaneous Fittings
CONTRACTOR LABOR
2 Includes Contract Engineering, Pipeline Construction Contractor,Third-Party ROW,
Third-Party Environmental, and Third-Party Inspection Costs
3 COMPANY LABOR
Includes Project Management, Construction Management, and FCC Inspection