BCRUA-2024-007 - 6/26/2024RESOLUTION NO. BCRUA-2024-007 WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a contract ("Contract") with Excel Construction Services, LLC for the BCRUA Phase 1 D Water Treatment Plant Expansion Plant Project; and WHEREAS, the BCRUA has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been detenmined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA, Change Order No. I to the Contract with Excel Construction Services, LLC, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of June, 2024. RENE 'LORES, President Brushy Creek Regional Utr ity Authority ATTES : ANNE DUFFY, Secret t 0339.4634•A.4879-3932.4616 EXHIBIT B141V Change Order No. 001 Uwe of Issuance: June 26, 2024 f:ffeetive Date. June 26, 2024 Project: BCRUA Phase 1 D WITP Expansion cTener. BCRUA oh te' omitact \s... N.A {.onmv: t)atcof Contract' May 10, 2023 Cimmcioc Excel Construction Services, LLC IieipjnsrtsPmrm.Gr.: 3.00809 The Contract Documents are modified as follows upon execution of this Change Order. 12escription:This Change Order includes approved Change Proposals 001, 002, 003, and 004 as identified below. CP-001: Additional excavation and subgrade preparation resulting from an unknown, buried trash/burn bit discovered beneath the proposed Sedimentation Basin. Price, Time: $14,283.00, 0 days, CP-002: Repair of a wall leak in an existing expansion joint at the intersection of the existing Phase IA and Phase IC settled water channels. Price, Time $10,583.00, 0 days. CP-003: i\Iodifications to Culvert #7 due to the elevations of two existing duct banks being shallower than indicated on record drawings. Price, Time: $32,256.00, 0 days, CP-004: Upgrades to eight existing Filter Remote Input/Output panels to replace control modules that are being phased out of production by the manufacturer, Price, Time: $133,841.00, 0 days. Attachments: list documents supriurting change): CP-001, 002, 003, and 004 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Pries: Orignal Contr ct Times: ❑ Working days ❑x (:akndar days Substantial completion (days or (1ate): 11 /20/2024 $16-836_100.00 Ready for final payintnt (days or ciaie): 01 /19/2025 Incmase] Ii]sereasel from previously approved Change Orders ]Increase] [Decreasel from Previously approeed Change Orders No. to Nu. No. to No. Substantial completion (days): NA S0.00 Ready for final payment (days): NA Contract Price prior to this Change Order: Contract Times prior to this (:hinge Order: Substantial completion (day, or din•): 11/20 / 2024 s 1 100.00 Rcadt- for final payment (days ,w date): 01 / 19/2025 increase of this Change Omer: Ilncrcascl IDecrcastl of this Change Order. 0 days Substantial completion (Jays or da(e): 1 1 /20/2024 s 190,963.00 _ Ready for final payment (days or dace): 01 / 19/2025 Contract Price incurrxirating this Char4W Order: Contract Timms with all approved (:hangs Orders: Substantial completion (days or date): 11 /20/2024 517,027,063.00 Ready fur final payment (days or d3tc):01/19/2025 RI�:(.'OAI\II?NI)1UX ACCIsP'17:D: ACCI.Y17d1): lty: 4A21 iSy: liv: , I?ngineer (Authoriztxl Signature) (honer (Authorzed Signature) Contractor (Authorized Signature) Datc:6/14/24 Date: Date: 6114124 Approved by funding Agency (if applicable): Dare: