Loading...
CM-2024-299 - 11/15/2024STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: K FRIESE & ASSOCIATES, LLC _ ("Engineer") ADDRESS: 1120 S. Capital of Texas Highway, CityView 2, Suite 100, Austin, TX 78746 PROJECT: BCRWWS Wastewater Master Plan This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and K Friese & Associates, LLC, hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 1 lth day of August, 2022 for the BCRWWS Wastewater Master Plan Project in the amount of $497,989.37; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $25,514.24 to a total of $523,503.61; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $25,514.24 the maximum amount payable under the Contract for a total of $523,503.61, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Z G �-Z� Supplements Contract 0199.202232;4860-5211-8518 Rev.06. 16 84275 K FRIESE & ASSOCIATES, LLC By: r f 40= Thomas M. Owens, P— E ., Vice President 08 NOV 2024 Date Supplemental Contract Rev.06!16 0199.202232:4860-5211-851$ 84275 CITY OF ROUND ROCK By• Printed Name: Title: �G Date Signed: Supplemental Contract 0199.202232:4860-5211-8518 APPROVED AS TO FORM: Stephanie L. Sandre, City Attorney licv.06/16 84275 ADDENDUM TO EXHIBIT A City Services The City of Round Rock will furnish to the Engineer the following items/information: • Designate a person to act as City's representative with respecttothe services to be performed orfurnished bythe Engineer. This representation will have authority totransmit instructions, receive information, interpret and define City's policies and decisions with respect to engineering services. • Provide allcriteria and full information asto City's requirements forthe project, including objectives and constraints and furnish copies of all standards which City will require to be included irk the project. • Assist Engineer by placing a I I available information pertinent to the Project, including previous reports and any other data relative to the Project at the ENGINEER's disposal. • Review and comment on the draft Report. ADDENDUM TO EXHIBIT B Engineering Services BCRWWS MASTER PLAN AMENDMENT 1 The Brushy Creek Regional Wastewater System (BCRWWS) is a regional wastewater system that serves and is owned by the cities of Round Rock, Cedar Park, Leander, and Austin (Owners). The system consists of gravity sewer mains, lift stations, force mains, and wastewater treatment facilities to treat and discharge wastewater into Brushy Creek in southern Williamson County. The main wastewater treatment facility in the system, the Brushy Creek Regional Wastewater Treatment Facility — East Plant (BCE), is currently under construction for an expansion from 20 million gallons per day (MGD) to 30 MGD average daily flow. In September 2022, the Owners retained K Friese + Associates (KFA) to provide professional engineering services for the BCRWWS Master Plan project. The objective of the Master Plan is to review the existing BCRWWS along with client -provided flow projections to identify proposed system upgrades. It will help resolve existing deficiencies and serve future population growth. During the project there were unforeseen delays and additional effort associated with data collection, data review, and hydraulic modeling. This amendment is related to additional effort required to complete the project, including: Task 1 — Project Management and Coordination The project was initially scoped for 12 months duration. The schedule was delayed as future flow projections were developed by the Owners and is the project is now anticipated to be 32 months duration. Additional effort was required for coordination, invoicing, and monthly status reports. Task 2 — Data Collection and Review The original scope assumed that the Owners would provide all as -built records and future flow projections. As the Owners were developing the flow projections, KFA coordinated with the Owners on the projections. Some sets of projections required several iterations of review and coordination before the projections were finalized and ready for use in the regional system project. The coordination was more than what was anticipated in the original scope. Additionally, not all as-builts were provided with the initial data request and there were significant differences between the GIS data and as -built plans, requiring more coordination to obtain available as-builts for confirming and updating the system components from the GIS data. Task 5 — Hydraulic Capacity Analysis of Existing System, and Future Flow Scenarios Additional effort was required to revise the hydraulic model with the changes to the flow projections and system geometry. KFA developed the initial model, but changes to the flow projections and obtaining additional as -built records required the model to be updated. KFA revised all three planning horizons in SewerGEMS, including updating proposed system improvements required to meet the updated flow projections. K FRIESE + ASSOCIATES 10131/2024 Page 1 of 2 11 LOCHNGM ADDENDUM TO EXHIBIT B Engineering Services BCRWWS MASTER PLAN AMENDMENT 1 Task 7 — Treatment & Sludge Disposal Evaluation Several changes to the approach for the treatment & sludge disposal evaluation portion of the project led to additional effort by the KFA team. This includes: Changes to the influent design concentration requiring model updates Revisions to the flow projections provided by the Owners resulting in updated calculations, technical memorandum changes, and sludge production projections. Additional treatment capacity evaluation for the 2070 planning horizon. The Owner's flow projections in 2070 were increased, putting the projected daily flows above the maximum capacities of BCE and BCW. Additional conceptual capacity sizing and scheduling for implementation was required for a new WWTP to handle the higher flows. K FRIESE + ASSOCIATES 10/31/2024 Page 2 of 2 it LCCMNRR 6CRWWS Wastewater Master Plan r ' CIS 1 Scope Document VIRP Change in Services 1 Additional Work Related to Changes in Flow Projection and General Project Schedule Delays (KFA Project No. 0882) Original Contract Amount: $ 204,009.37 Previous Increases/Decreases in Contact Amount: $ 0.00 CURRENT CONTRACT AMOUNT: $ 204,009.37 This Increase/Decrease in Contract Amount: $10,174.24 REVISED CONTRACT AMOUNT: $ 214,183.61 DESCRIPTION OF WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES: I. Project Management and Resource Scheduling for prolonged project duration and schedule shifts. a. Scoped Final Master Plan Deliverable — 01/02/2024 b. Latest Final Master Plan Deliverable—11/15/2024 c. Change for 9 months PM additional services 2. Concentration Data: Previous data evaluation completed and submitted 11/27/2023 (Chapter 2) used historical data to select "master planning" influent design concentrations. Now that the 40 MGD project is underway, the special sampling and 40 MGD scope defined the influent TSS to be slightly lower than the Chapter 2 recommendation (504 mg/L vs 480 mg/L). Adjustments needed: a. Text, Figures, Tables in Chapter 2 b. Model influent parameters and model run results in Chapter 3 3. Wastewater Flow Data: Old wastewater flow projections from City of Austin have been updated from the confirmed values on 07/18/2023 to the values provided on 10/27/2023.Old wastewater flow projections from City of Round Rock have been updated from the confirmed values on 07/18/2023 to the values provided on 04/15/2024. Adjustments needed: a. Background calculations for flow projections, projection charts, TCEQ expansion triggers, and future capacity sizing recommendations. b. Re -write Chapter 2, Section 3 in its entirety c. Text, charts, and schedule in Chapter 4 d. The previous 2070 flow projections were lower (53.9 MGD) as compared to the new 2070 flow projections (56.1 MGD). The new 56.1 MGD projection for 2070 puts the system beyond the previous recommendation of a 60 MGD facility for the ultimate BCE plan.. need additional scope for new alternatives to handle higher flows. e. Sludge production projections text, charts, tables, and general approach in Chapter 5. . . .. _ . 1 „t .. _� 0612512024 BCRWWS Wastewater Master Plan CIS 1 Scope Document �t 4. New Approach to 2070 Treatment Capacity Expansion: a. Scoped Master Plan approach to BCE Expansion to 40 MGD —This work was completed in 2023 but the design of the BCE Expansion to 40 MGD is already underway and is no longer applicable information to include in a Master Plan. b. New treatment capacity options: i. BCE Expansion Using Primary Filters (Included in Scope) ii. 8CW Expansion (Included in Scope) iii. New treatment plant for large Austin Water flow increases between the 2040 planning horizon and the 2070 planning Horizon (New Option called "Far West WWTP") • The presentation of the Far West WWTP option is limited to conceptual capacity sizing and preliminary planning schedule for implementation. Proj Poncipai Senior PM Manager Proi. Eng. EIT CAD Task flame S 314 18 $ 259.58 S 1$9.28 S 156.83 $ 127.97 S 125.00 Total labor Expenses Total A.1 Progress Repartmg and Imo cane 2 9 S 2,331.99 S 2.331.88 A-2 Workshops and Meetings $ - S A-3 Cluali Review 2 2 1 S 1.336.80 S ;336.80 B.1 Data Collection and Review 1 4 4 S 1,328.40 029.49 C.1 Flow Projections and Loading 4 4 $ 1.384.44 S 1,384 44 C.2 Process Model 4 4 $ 1,W.44 S 1,384.44 C.3 Evaluation of East Plant Expansion 2 2 4 S 1.204 10 S 1,204.10 CA Evaluation of West Plant Expansion S S - C.5 Solids Mana rnentPlan 2 2 4 S 1,204.10 S 1.204-10 0.1 Final Report Documentation CIS 1 Tout 0612512024 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page W W W W W W W N N N N N AF N N j N .a p V OI VI . W ry. � pp d T y��1 p� yp1 WNW yry1� � 1 -4 a n m o; m o 7e $ Im a� n n• 0� o T a' o �� w 3 3 d A 76' go mr o m° D, > > c 3 as sa o to4N n $ N 3 ° e s n 3WX" � f A a o r N D D W p N a w W N A O W w N N N N OW V N A C - b.� pj W p r O O w p 3 3" 3 3 3 3 9 3" 3 0 0 '• �' o N r N r r r w }+ r\ r \\ D \\ N N N w w r lNf� N Ln N A 0 A A A A T T T T T T 77 T T T T W N w r w w W r w r r 1.3 N r a s v N w w U, l\N71 %n kn N N a N N A A 0 a 0 0 0 0 0 0 0 0 0 3e 3p 0 0 0 0 0 n 7 J J 5 = 7 7 7 7 D 7 ] 7 7 7 7 J 3 S W N. W kn A D w r r w M tO V V A p W N 000 A V V IJ \ 10 In N r W W W W \ \ \ \ A N \ \ V W 0 0 O \ \ N N N NsN N to A N N \\ N N N A p W A p V. D a W W W w w V d1 p1 to In r to V r+ DD w V V a r \ \ \ \ \ W r N N N W N Oi \\\ r N \ r A A\ W N O N N A N N N A N N N N N N N N N a A A A A A A W W N N p p a a p A p W W jlL D 3 Y Y } C ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page _ \§to P4 CLM wQimCrW ----% /�§M CL Or Cr %«(rL --vm� \■°k -°-�A2�Et\($K£ƒE CL 5&r,r- Ma' 2,%�• - l am FLCors■} /��� ; .i.,.,���•.� g= g■- 7 a E� �f�to fk w _ m M a. 0 0 0 0 ? �Bk s 8 � � � - I § 8 & Jk2E t ■ a � �\@ .ate � � ~ _\ƒ " $ § � & �oGoo #ooCh R w ( 8 8 8 8 8 2E | | )k)kw w§w � � ■ ■ � � � M. wl Vil .��k§ 22 t_ a. 1 '�� a . ice• � , � �� ._ ' .,��, ., � . C ryl`► 'v�' `j»r_ v: [, Yam,"Fe �. 60 44 i,'R`'`, !''"•+, y�+* •°J .'f� "�`'` �* �~ 51' ram, .`'` • • fo Vs iA jL 46 -��$. �'''�4. �,`•" O y {..,� •!� �' ,. +�•� is " �4 lsit ,:" Yrys% pG ; + � lY +� r ,{. .t y`.. 1 46 � v r�•�� �y ;1•�+� .� �"`TYYTT" * �'+ .ylr st--i '� deg. Js 41. — � 0 �:� ' � Mir' y ,.:��' � • t� ��'�''� X :7 �}'Ff -,4� �I�,�•f/� 4., . ��r J,:f���'. '�r4 '�� - tj Aw r ' 1 .k '- ` f� ." '�' `� � } � � L ,M � 4� 1t � � �� F ' �� O• '�.- ✓'' ``? ,So-` • - •