Contract Quantity Adjusttnent/Change Order
PARR
Stagecoach inn Rehabilitation Project
Date: 11 21 24
Change Order/Quantity
Adjustment No. 2
Page 1 of 4
HCS, Inc. 365 Wayside Dr. Waco, Texas 76705 254-829-3200
Company Name Address Phone No.
s change order includes relocating the gutter out of the pathway of travel and around the side of the buicilling. It also includes relocating
HVAC disconnect and plug. They were installed per plan, however after they were installed, they were inaccessible for use. it was also
:essary to add breakers for the HVAC. There was also an allowance Included in the bid for repointing the masonry that was not fully used,
there is a credit for the unused portion of the allowance. Finally, during final closeout of the buldling, there were miscellaneous items that
re called out by the City and Design team that were not included in the plans, but were needed to Improve the final asthedc of the Inn,
lulling caulking the fborboards, painting the register covers, and installing a batter backup for the exit lights (required by fire).
SUMMARY
Original Contract Price:
Previous Quantity Adjustrrrent(s):
This Quantity Adjiustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
300 da
8 days
New Contract Time: 322 days
m r
$2,437.77 0%
$5,827.00 1%
$8 264.77 1%
$722 635.77
0=
$8,264.77
7-
e Printed Name, Title, Company Date
>d
Contractor: '�,k In Jeff Kirkpatrick-HCS-PM 12/4/2024
'mature Printed Name, Title, Company Date
City Project
Manager: IL >;y. g4le, 2
Signature Pririnted Nfa�me, Tltie to
Manaciee l/�//ram I�ff /� / 3UK �% /�h/ . C✓t`+"V
Printed !Name, Title
P—'*� Contract Quantity Adjustment/Change Order
fa outs
Project Narne: Stagecoach Inn Rehabilitation Project
Quan. Adj./Change Order No.
Charon Order Data
Page 3 of 4
=keamn
Unit Price
Amount
y
Contract
rune
Adjustment
item Description
Unit
.:r
1
Gutter relocatton and new straps
LS
1
1360.27
$1,360.27
IStonere
D19conWraW plug relocation
L5
1
1,
4
3
Breakers for HVAC
LS
1
;i 11 .
1,115.
4
d
1
-; —5. 5
- 4,914.35
5
5
QVMt for Sash Bracing
L5
1
0.00
6
up Install
LS
1
$5j022.8S
$5MM
7
CauWng baseboard, hardware
replacement, paintlng HVAC reglsWrs
1S
1
$2,756.50
$2,756.50
00
0.
.00
.00
.00
$0.00
$0.00
$O.DO
.00
$0.00
$0.00
$0.00
so.00
Page 4 d 4
Contract Quantity Adjustment/Change Order
Project Name: Stagecoach Inn Rehabilitation Project
Quan. Adj./Change Order No.: 2
1 ITI
71 1 1
_-
TI 171
MI
_-
oil
1 1'1
71 iTl
--
1 f l
71 1�1
/ I'1