R-2025-003 - 1/9/2025 RESOLUTION NO. R-2025-003 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Austin Underground, Inc. for the Lake Creek Wastewater Line Replacement Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 5, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 5 to the Contract with Austin Underground, Inc. for the Lake Creek Wastewater Line Replacement Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of January, 2025. CRAIG MORGN, Mayor City of Round Aock,Texas AT ST: ANN FRANKLIN, City Clerk 0112.20252:4926-4932-9160 EXHIBIT Page 1 of 3 "A„ Contract Quantity Adjustment/Change Order iowm RlAS a,anis Department: UES Project Name: Lake Creek Wastewater Line Replacement Date: 11/27/24 City Project Change Order/Quantity ID Number Lon Adjustment No. 5 Vendor Austin Underground,Inc. P.O. Box 5650-Lago Vista,Texas 78645 (512)535-3285 Company Name Address Phone No. Justification Change Order/Quantity Adjustment No.5 is for the additional reimbursement for rail line inspection and rail line survey during installation of the wastewater under the railroad track.This change order also includes the addition of 180-feet of split-steel encasement pipe to protect the wastewater line from the proposed Lake Creek Trail. SUMMARY Amount %Change Original Contract Price: 1$3$724,493.75 Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): $66,148.63 2% This Change Order: $403,314.59 11% Total Change Order(s)To Date: $469,463.22 13% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)): $4,193,956.97 Difference between Original and Adjusted Contract Prices: $602,786.97 Original Contract Time: 240 Time Adjustment by previous Quan.Adj./Change Order: 360 Time Adjustment by this Quan.Adj./Change Order: 160 New Contract Time: 760 Prepared By: Christopher Perkins Principal Engineer,Round Rock 1 Z� Signature Printed Name,Title,Company Date ValentinJGomez, ogrt•in wsMew�•on, s�.�H Contractor: Jr. w�exa:anD1as6C600 Valentin J Gomez,Jr-Sr PM-Austin Underground Inc Signature Printed Name,Title,Company Date City Project / i✓ / Manager: Ci( (.--- Christopher Perkins,Principal Engineer,Round Rock IC L Lf ignature Printed Name,Title Date Mayor/City /1 Q q Manager Lro1g KQcq Signature Printed Ratne,Title ' Date Page 2 of 3 Contract Quantity Adjustment/Change Order o.+o.oae eras e.,oinE Project Name: Lake Creek Wastewater Line Replacement Quan.Adj./Change Order No.: 5 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price s Addition of I80ft of split-steel encasement,including restaints and casing CO 5-1 spacers. LS 1 $403,314.59 $403,314.59 160 Contract Quantity Adjustment/Change Order In Project Name: Lake Creek Wastewater Line Replacement Quan.Adj./Change Order No.: 5 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment Cost for RailPros for Rail Line Inspection during installation of the Steel Encasement Pipe under Rail Road ROW.Reimbursement to pay RailPros 28 Invoice plus 15%. LS 1 $22,473.73 $22,473.73 Cost for UPRR Certified Rail Survey to provide surveying of Centerline of Track during installation of the Steel Encasement Pipe under Rail 29 Road ROW.Reimbursement to be paid Invoice plus 15%. LS 1 $18,067.52 $18,067.52 TOTALS:10 541.251 0 1 Q '63 Q 0,00 o l� '. - 253 • • �►r�, \ �� c_.t Mfr. � 'o • �o Co�{ v V" a ' Ai- 5 Railroad Crossing' 42-inch Steel • ,r • Encasement +�+ - �vRailroad Crossing • �[fit ,° �' • v ` • Manholes Lake Creek 1 WW Interceptor Lake Creek 1 Wastewater Interceptor ' ROUNURUCK Gravity Mains