R-2025-033 - 2/13/2025 RESOLUTION NO. R-2025-033 WHEREAS, the City of Round Rock ("City") has previously determined in Resolution No. R-2024-241 that "Competitive Sealed Proposal" is the delivery method which provides the best value for the Chisholm Trail South Project, and WHEREAS, after advertising for and receiving proposals from offerors, the City of Round Rock determines that Cash Construction Company, Inc. is the offeror which offers the best value for the City, and WHEREAS, the City Council now wishes to enter into a "Standard Form of Agreement Between Owner and Contractor" with Cash Construction Company, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That, after advertising for and receiving proposals from offerors, the City of Round Rock hereby finds that Cash Construction Company, Inc. is the offeror which offers the best value for the City for the Chisholm Trail South Project. BE IT FURTHER RESOLVED, That the Mayor is hereby authorized and directed to execute on behalf of the City a "Standard Form of Agreement Between Owner and Contractor" with Cash Construction Company, Inc. for the Chisholm Trail South Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. 0112.20252;4909-1716-0470 RESOLVED this 13th day of February, 2025. CRAIGRG , Mayor City of Rand R k, Texas ATTEST: - 11416119L. ANN FRANKLIN, City Clerk 2 BID TABULATION THE CITY OF ROUND ROCK Bid Extended By:Dawn Scheel OF TE\11 Transportation Department Print Name Initials 3400 Sunrise Rd. Bid Opening Date: 12/3/2024 t Round Rock, Texas. 78665 Bid Opening Location:Bob Bennett Building DAWN E.SCHEEL Liquidated Damages: ,o , 66577 �i No.of Responses: 7 I p o .4 i Project Name: Chisholm Trail South Improvements Project Manager: Dawn Scheel t11;oF../CE"Ns�����G`�a�� Project ID: Project Consultant:Freese&Nichols 1 1\\�-'ONa� Project Duration:509 Calendar Das aC�Yl4J�C Bidders Name Smith Contracting DeNucci Aaron Concrete Cash Construction Texas Road LLC Patin Construction Joe Bland Construction Contractors Business Location Guarantee:Bid Bond,Cashier Check or Certified Check Yes Yes Yes Yes Yes Yes Yes Statement of Safety Experience,Yes or No Yes Yes Yes Yes Yes Yes Yes Addendum(s)Acknowledged,Yes,No,or N/A Yes Yes Yes Yes Yes Yes Yes APPROX. UNIT UNIT UNIT UNIT UNIT UNIT UNIT EM i ITEM DESCRIPTION QTY. UNIT PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST 1 100-6002 Pre ROW 9 STA $20,000.00 $180,000.00 $8,000.00 $72,000.00 $15,000.00 $135,000.00 $15,000.00 $135,000.00 $1,000.00 $9,000.00 $42,000.00 $378,000.00 $5,000.00 $45,000.00 2 104-6015 Rem Conc Sidewalk 743 SY $21.00 $15,603.00 $30.00 $22,290.00 $25.00 $18,575.00 $12.00 $8,916.00 $35.00 $26,005.00 $25.00 $18,575.00 $30.00 $22,290.00 3 104-6017 Rem Conc Driveway797 SY $30.00 $23.910.00 $30.00 $23,910.00 $25.00 $19,925.00 $15.00 $11,955.00 $35.00 $27,895.00 525.00 $19,925.00 $40.00 $31,880.00 4 104-6021 Rem Conc Curb 2258 LF $8.00 $18.064.00 $3.00 $6,774.00 $15.00 $33,870.00 $6.00 $13,548.00 $6.00 $13,548.00 $10.00 $22,580.00 $15.00 $33,870.00 5 110-6001 Excav Roadway5752 CY $60.00 $345,120.00 $165.00 $949,080.00 $80.00 $460,160.00 $26.00 $149,552.00 $63.00 $362.376.00 $50.00 $287,600.00 $70.00 $402,640.00 6 1132-6002 Emb Final Dens Cont Ty 218 CY $100.00 $21,800.00 $155.00 $33,790.00 $200.00 $43,600.00 $10.00 $2,180.00 $35.00 $7.630.00 $35.00 $7,630.00 $55.00 $11,990.00 7 162-6002 Block Sodding 799 SY $21.00 $16.779.00 $12.00 $9,588.00 $11.00 $8,789.00 $16.00 $12,784.00 $19.00 $15,181.00 $15.00 $11,985.00 $10.00 $7,990.00 8 168-6001 Ve atering 31 MG $150.00 $4,650.00 $110.00 $3,410.00 $40.00 $1,240.00 $49.00 $1,519.00 $110.00 $3,410.00 $100.00 $3,100.00 $130.00 $4,030.00 9 33110-6027 Prime Coat MC-30 or 943 GAL $4.25 $4,007.75 $20.00 $18,860.00 $4.40 $4.149.20 $5.00 $4,715.00 $5.00 $4,715.00 $5.00 $4,715.00 $4.00 $3,772.00 10 354-6045 Plane Asph Conc Pav 2" 2025 SY $5.00 $10,125.00 $22.00 $44,550.00 $9.80 $19,845.00 $6.00 $12,150.00 $5.50 $11,137.50 $6.00 $12,150.00 $5.00 $10,125.00 11 660-6016 Conc Pav Jointed CPCD 901 SY $350.00 $315,350.00 $225.00 $202,725.00 $300.00 $270,300.00 $215.00 $193,715.00 $180.00 $162,180.00 $250.00 $225,250.00 $90.00 $81,090.00 12 402-6001 Trench Excav Protec 3232 LF $1.00 $3,232.00 $5.00 $16,160.00 $1.25 $4,040.00 $5.00 $16.160.00 $3.00 $9,696.00 $10.00 $32,320.00 $20.00 $64,640.00 13 416-6088 Drill Shaft RDWY ILL 48 LF $615.00 $29,520.00 $600.00 $28,800.00 $1,900.00 $91,200.00 $358.00 $17,184.00 $710.00 $34,080.00 $650.00 $31,200.00 $1,750.00 $84,000.00 Pole 24" 14 420-6043 CL C Conc Footing 3 CY $7,600.00 $22,800.00 $2,000.00 $6,000.00 $6,400.00 $19,200.00 $1,730.00 $5,190.00 $8,500.00 $25,500.00 $1,500.00 $4,500.00 $6,150.00 $18,450.00 15 420-6071 Cl C Conc Collar 1 EA $5,000.00 $5,000.00 $2,500.00 $2,500.00 $1,900.00 11,900.00 $1,340.00 $1,340.00 $680.00 $680.00 $1,500.00 $1,500.00 $6.500.00 $6,500.00 16 464-6003 RC Pipe CL Ill 18" 385 LF $340.00 $130,900.00 $85.00 $32,725.00 $142.00 $54,670.00 $271.00 $104,335.00 $180.00 $69,300.00 $150.00 $57,750.00 $175.00 $67,375.00 17 464-6005 RC Pipe CL 111 24" 342 LF $390.00 $133,380.00 $125.00 $42,750.00 $166.00 $56,772.00 $372.00 $127,224.00 $220.00 $75,240.00 $200.00 $68,400.00 $195.00 $66,690.00 18 464-6007 RC Pipe CL 111 30" 329 LF $450.00 $148,050.00 $225.00 $74,025.00 $230.00 $75,670.00 $373.00 $122,717.00 $320.00 $105,280.00 $250.00 $82,250.00 $255.00 $83,895.00 19 464-6008 RC Pipe CL 11136" 270 LF $520.00 $140,400.00 $275.00 $74,250.00 $284.00 $76,680.00 $389.00 $105.030.00 $330.00 $89,100.00 $300.00 $81,000.00 $345.00 $93,150.00 20 465-6002 ManH Comp PRM 48" 1 EA $7,800.00 $7,800.00 $10,500.00 $10,500.00 $3,850.00 $3,850.00 $6,760.00 $6,760.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $6,000.00 $6,000.00 21 465-6018 Inlet Comp PCO 4'left 3 EA $7,900.00 $23,700.00 $6,500.00 $19,500.00 $7,050.00 $21,150.00 $8,940.00 $26,820.00 $8,800.00 $26,400.00 $10,000.00 $30,000.00 $12,750.00 $38,250.00 22 465-6029 Inlet Comp PCU 3'None 1 EA $6,000.00 $6,000.00 $5,000.00 $5,000.00 $4,830.00 $4,830.00 $7,210.00 $7,210.00 $7,000.00 $7,000.00 $10,000.00 $10,000.00 $11,500.00 $11,500.00 23 465-6030 Inlet Comp PCU 3'Left 3 EA $6,900.00 $20,700.00 $5.000.00 $15,000.00 $5,950.00 $17,850.00 $8,690.00 $26.070.00 $8.000.00 $24.000.00 $10.000.00 $30,000.00 $9,950.00 $29,850.00 24 465-6031 Inlet Comp PCU 3'Right 8 EA $6,800.00 $54,400.00 $5,000.00 $40,000.00 $5,850.00 $46,800.00 $8,690.00 $69,520.00 $8,000.00 $64.000.00 $10,000.00 $80,000.00 $8,000.00 $64,000.00 BID TABULATION THE CITY OF ROUND ROCK Bid Extended By:Dawn Scheel =�E OF Transportation Department Print Name Initials 3400 Sunrise Rd. Bid Opening Date: 12/3/2024 1- S1to Round Rock, Texas. 78665 Bid Opening Location:Bob Bennett Building i DAWN E.SCHEEL i Liquidated Damages: ......................... 66577 i No.of Responses: 7 tl-P p Project Name: Chisholm Trail South Improvements Project Manager: Dawn Scheel tlt�cF. CE N`�E,.G���� Project ID: Project Consultant:Freese&Nichols Xs a"` .01 Project Duration:509 Calendar Days 25 465-6062 Inlet Comp PSL RH 3'x3' 3 EA $7,100.00 $21,300.00 $5.000.00 $15,000.00 $5,010.00 F $15,030.00 $6,740.00 $20,220.00 $7,000.00 $21,000.00 $9,000.00 $27,000.00 $10,250.00 $30,750.00 26 465-6063 Inlet Comp PSL RH4'x4' 2 EA $8,500.00 $17,000.00 $6,500.00 $13,000.00 $6,320.00 $12,640.00 $7,320.00 $14,640.00 $8,500.00 $17,000.00 $1,000.00 $2,000.00 $13,750.00 $27,500.00 27 465-6065 Inlet Comp PSL RH 4'x5' 2 EA $9,000.00 $18,000.00 $6,000.00 $12.000.00 $6,900.00 $13,800.00 $8,790.00 $17,580.00 $9,000.00 $18,000.00 $12,000.00 $24,000.00 $14,250.00 $28,500.00 28 465-6066 Inlet Comp PSL RH 5'x5' 1 EA $9.300.00 $9.300.00 $7,500.00 $7,500.00 $6,900.00 $6.900.00 $8,080.00 $8,080.00 $9,000.00 $9.000.00 $15.000.00 $15,000.00 $14,500.00 $14,500.00 29 465-6148 Inlet Comp PSL SFG 2 EA $7,000.00 $14,000.00 $7.500.00 $15,000.00 $6.200.00 $12,400.00 $8.100.00 $16,200.00 $8,000.00 $16,000.00 $15,000.00 $30.000.00 $13,000.00 $26,000.00 3'x5'-3'x5' 30 501-6001 Mobilization 1 LS $500,000.00 $500,000.00 $250.000.00 $250,000.00 $560.000.00 $560,000.00 $310.000.00 $310,000.00 ########## $164,000.00 ########## $100,000.00 ########At# $195,000.00 31 502-6001 Barricades, Signs, 17 MO $11.000.00 $187,000.00 $12,000.00 $204,000.00 $24,000.00 $408.000.00 $5,000.00 $85.000.00 $4,500.00 $76,500.00 $15.000.00 $255,000.00 $3,750.00 $63,750.00 Traffic handling 32 506-6038 Temp Sedmi Cont Fence 114 LF $5.00 $570.00 $20.00 $2,280.00 $9.00 $1,026.00 $4.00 $456.00 $7.00 $798.00 $4.00 $456.00 $10.00 $1,140.00 Install 33 506-6039 Temp Sedmt Cont Fence 114 LF $2.00 $228.00 $5.00 $570.00 $2.00 $228.00 $1.00 $114.00 $4.00 $456.00 $1.00 $114.00 $5.00 $570.00 Remove 34 508-6001 Constr Detours 55 SY $450.00 $24.750.00 $160.00 $8,800.00 $350.00 $19,250.00 $333.00 $18.315.00 $170.00 $9,350.00 $325.00 $17,875.00 $400.00 $22.000.00 35 512-6009 Port CTB Fur&Inst Low 2280 LF $25.00 $57,000.00 $85.00 $193,800.00 $68.00 $155,040.00 $35.00 $79,800.00 $25.00 $57,000.00 $100.00 $228,000.00 $95.00 $216.600.00 Prof Ty I 36 512-6010 Port CTB Fur&Inst Low 340 LF 530.00 $10,200.00 $85.00 $28.900.00 $68.00 $23,120.00 $33.00 $11,220.00 $25.00 $8.500.00 $100.00 $34,000.00 $115.00 $39,100.00 Prof Ty 2 37 512-6033 Port CTB Move Low 5500 LF $11.00 $60,500.00 $45.00 $247,500.00 $14.00 $77.000.00 $6.00 $33.000.00 $30.00 $165,000.00 $20.00 $110,000.00 $15.00 $82,500.00 Prof T 1 38 512-6034 Port CTB Move Low 780 LF $15.00 $11.700.00 $45.00 $35,100.00 $14.00 $10,920.00 $6.00 $4,680.00 $30.00 $23,400.00 $20.00 $15,600.00 $15.00 $11,700.00 Prof Ty 2 39 512-6057 Port CTB Remove Low 2280 LF $25.00 $57,000.00 $35.00 $79,800.00 $23.00 $52,440.00 $9.00 $20,520.00 $12.00 $27,360.00 $20.00 $45,600.00 $15.00 $34,200.00 Prof TY 1 40 512-6058 Port CTB Remove Low 340 LF $30.00 $10.200.00 $35.00 $11,900.00 $23.00 $7,820.00 $9.00 $3.060.00 $12.00 $4,080.00 $20.00 $6,800.00 $15.00 $5,100.00 Prof Ty 2 41 529-6002 Conc Curb Ty II 2568 LF $35.00 $89,880.00 $28.00 $71,904.00 $45.00 $115,560.00 $34.00 $87,312.00 $24.00 $61,632.00 $30.00 $77,040.00 $38.00 $97,584.00 42 530-6004Driveways Conc 1264 SY $180.00 $227,520.00 $105.00 $132,720.00 $165.00 $208,560.00 $146.00 $184,544.00 $95.00 $120.080.00 $300.00 $379,200.00 $150.00 $189,600.00 43 531-6001 Conc Sidewalks 4" 1003 SY $150.00 $150,450.00 $60.00 $60,180.00 $110.00 $110,330.00 $136.00 $136.408.00 $78.00 $78,234.00 $150.00 $150,450.00 $115.00 $115,345.00 44 531-6004 Curb Ramps Ty I 1 EA $3,000.00 $3,000.00 $2.800.00 $2,800.00 $3,400.00 $3,400.00 $1,600.00 $1,600.00 $2,900.00 $2,900.00 $3,000.00 $3,000.00 $3,000.00 $3.000.00 45 531-6005 Curb Ramps TY 2 1 EA $3,000.00 $3,000.00 $2,800.00 $2.800.00 $3.300.00 $3,300.00 $1.740.00 $1,740.00 $5,800.00 $5.800.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00 46 531-6010 Curb Ramps TY 7 2 EA $3,000.00 $6,000.0-OT- $3,500.00 $7.000.00 $2,700.00 $5,400.00 $1,600.00 $3,200.00 $3,500.00 $7,000.00 $3,000.00 $6,000.00 $5,000.00 $10,000.00 47 531-6013 Curb Ramps TY 10 4 EA $3,000.00 $12,000.00 $3,500.00 $14,000.00 $2,600.00 $10,400.00 $1.600.00 $6,400.00 $2.400.00 $9,600.00 $3,000.00 $12.000.00 $5,000.00 $20,000.00 48 550-6003 Chain Lk Fence Install 8' 35 LF $24.00 $840.00 $10.00 $350.00 $25.00 $875.00= 875.00 $4.00 1 $140.00 $25.00 $875.00 $10.001 $350.00 $50.00 $1.750.00 49 550-6008 Chain Lk Fence Install 6'1 35 1 LF 1 $150.001 $5.250.001 $65.001 $2,275.00 1 $115.00 1 $4.025.00 1 $70.00 1 $2.450.00 1 $90.00 1 $3,150.00 1 $50.001 $1,750.00 $110.00 $3,850.00 BID TABULATION THE CITY OF ROUND ROCK Bid Extended By:Dawn Scheel OF Te\\\ Transportation Department Print Name Initials 3400 Sunrise Rd. Bid Opening Date: 12/3/2024 Round Rock, Texas. 78665 Bid Opening Location:Bob Bennett Building DAWN E.SCHEEL i Liquidated Damages: q' 66577 No.of Responses: 7 I-p Project Name: Chisholm Trail South Improvements Project Manager: Dawn Scheel #110"F �"C E N S" Project ID: Project Consultant:Freese&Nichols 1\\ 0NA=N� Project Duration:509 Calendar Days 50 550-6045 Chain Link Fence Gate I EA $6,100.00 $6,100.00 $4,500.00 $4,500.00 $7,600.00 $7,600.00 $3,820.00 $3,820.00 $6,000.00 $6,000.00 $2,500.00 $2,500.00 $7,250.00 $7,250.00 Instl 8'x30' 51 560-6025 Reloc Exist Mailbox 2 EA $670.00 $1,340.00 $100.00 $200.00 $670.00 $1,340.00 $625.00 $1,250.00 $340.00 $680.00 $500.00 $1,000.00 $1,000.00 $1000.00 52 610-XXXX Rd III ASM Special 10 EA $9,500.00 $95,000.00 $16,500.00 $165,000.00 $13,000.00 $130,000.00 $8,240.00 $82,400.00 $11,000.00 $110.000.00 $5,000.00 $50,000.00 $12,500.00 $125,000.00 53 618-6033 Cond PVC SCH 404" 2104 LF $33.00 $69,432.00 $45.00 $94,680.00 $130.00 $273,520.00 $39.00 $82,056.00 $38.00 $79,952.00 $50.00 $105.200.00 $120.00 $252,480.00 54 661086034 Condt PVC SCH 40 4" 76 LF $110.00 $8,360.00 $185.00 $14,060.00 $520.00 $39,520.00 $72.00 $5,472.00 $130.00 $9,880.00 $95.00 $7,220.00 $500.00 $38,000.00 re 55 618-6046 Condt PVC SCH 80 2" 1059 LF $15.00 $15,885.00 $85.00 $90.015.00 $100.00 $105,900.00 $23.00 $24.357.00 $17.00 $18,003.00 $30.00 $31,770.00 $95.00 $100,605.00 56 618-6047 Condt PVC SCH 80 2" 38 LF $100.00 $3.800.00 $250.00 $9,500.00 $465.00 $17,670.00 $58.00 $2,204.00 $120.00 $4,560.00 $80.00 $3,040.00 $500.00 $19.000.00 Bore 57 620-6009 Elec Condr NO 6 Bare 1097 LF $3.25 $3,565.25 $6.00 $6,582.00 $4.00 $4,388.00 $2.00 $2,194.00 $4.00 $4,388.00 $5.00 $5,485.00 $4.00 $4.388.00 58 620-6010 Elec Condr No 6 2194 LF $3.50 $7,679.00 $6.00 $13.164.00 $5.30 $11,628.20 $3.00 $6,582.00 $4.50 $9,873.00 $6.00 $13,164.00 $5.00 $10,970.00 Insulated 59 624-6002 Ground Box TY A 6 EA $2,300.00 $13,800.00 $1,800.00 $10,800.00 $3,200.00 $19,200.00 $1,800.00 $10,800.00 $2,700.00 $16,200.00 $2.500.00 $15,000.00 $3,050.00 $18,300.00 122311 W/A ron 60 628-60 SS Elec SRV TY A 120/240 060 SSI EA $16,200.00 $16,200.00 $8,500.00 $8,500.00 $13,000.00 $13,000.00 $7,500.00 $7,500.00 $19,000.00 $19,000.00 $13,000.00 $13.000.00 $12,525.00 $12.525.00 61 644-6068 Relocate RD SN 3 EA $950.00 $2,850.00 $350.00 $1,050.00 $940.00 $2,820.00 $881.00 $2,643.00 $1,000.00 $3,000.00 $1,500.00 $4,500.00 $1,000.00 $3,000.00 SUP&AMT 10 BWG 62 662-6075 WK ZN PAV MRK 44 LF $26.00 $1,144.00 $20.00 $880.00 $27.00 $1,188.00 $25.00 $1,100.00 $30.00 $1,320.00 $30.00 $1,320.00 $26.00 $1,144.00 Remov W 24"SLD 63 666-6030 REFL Pav MRK TY I W 125 LF $8.50 $1,062.50 $10.00 $1,250.00 $9.00 $1,125.00 $8.00 $1,000.00 $9.50 $1.187.50 $10.00 $1.250.00 $8.00 $1,000.00 8"DOT I OOML 64 666-6036 REFL Pav MRK TY I W 170 LF $8.50 $1,445.00 $10.00 $1,700.00 $9.00 $1,530.00 $8.00 $1,360.00 $9.50 $1,615.00 $10.00 $1,700.00 $8.00 $1,360.00 8"SLD I OOML 65 666-6042 REFL Pav MRK TY I W 92 LF $15.00 $1,380.00 $16.00 $1,472.00 $15.00 $1.380.00 $14.00 $1,288.00 $17.00 $1,564.00 $15.00 $1,380.00 $15.00 $1,380.00 12"SLD 100ML 66 666-6048 REFI Pav MRK TY I W 23 LF $54.00 $1,242.00 $22.00 $506.00 $55.00 $1,265.00 $51.00 $1,173.00 $60.00 $1,380.00 $60.00 $1,380.00 $50.00 $1,150.00 24"SLD IOOML 67 666-6054 REFL Pav MRK TY I W 2 EA $305.00 $610.00 $650.00 $1,300.00 $304.00 $608.00 $284.00 $568.00 $340.00 $680.00 $300.00 $600.00 $295.00 $590.00 Arrow IOOML 68 666-6057 REFL Pav MRK TY I W 1 EA $425.00 $425.00 $650.00 $650.00 $425.00 $425.00 $398.00 $398.00 $470.00 $470.00 $500.00 $500.00 $500.00 $500.00 DBL Arrow I OOML 69 666-6078 REFL Pav MRK TY i W 2 EA $365.00 $730.00 $650.00 $1,300.00 $365.00 $730.00 $341.00 $682.00 $410.00 $820.00 $400.00 $800.00 $350.00 $700.00 Word IOOML 70 666-XXXX REFL Pav MRK TY I 3594 LF $1.95 $7,008.30 $8.00 $28,752.00 $2.00 $7,188.00 $2.00 $7,188.00 $2.00 $7,188.00 $3.00 $10,782.00 $2.00 $7,188.00 Y 6"SLD 100ML 71 C 2-6007 REFL Pav MR KR TY I- 9 EA $9.45 $85.05 $65.00 $585.00 $9.50 $85.50 $9.00 $81.00 $10.00 $90.00 $10.00 $90.00 $9.00 $81.00 BID TABULATION THE CITY OF ROUND ROCK Bid Extended By:Dawn Scheel jE OF Transportation Department Print Name Initials CP t �yS 111 3400 Sunrise Rd. Bid Opening Date: 12/3/2074 , Round Rock, Texas. 78665 Bid Opening Location:Bob Bennett Building j DAWN E.SCHEEL i Liquidated Damages: ..a',.........66�j77...........Q-i No.of Responses: 7 I p 11 O,c <iCENSE �� Project Name: Chisholm Trail South Improvements Project Manager: Dawn Scheel 11 F Project ID: Project Consultant:Freese&Nichols 1,\��ONAI e Project Duration:509 Calendar Days 72 672-6009 22-6009 PEF'Pav MRKR TY II- 111 EA $9.45 $1,048.95 $65.00 $7,215.00 $9.50 $1.054.50 $9.00 $999.00 $10.00 $1,110.00 $10.00 $1,110.00 $9.00 $999.00 73 1004-6001 Tree Protection 12 EA $610.00 $7,320.00 $600.00 $7,200.00 $304.00 $3,648.00 $426.00 $5,112.00 $200.00 $2,400.00 $250.00 $3.000.00 $250.00 $3,000.00 74 3076-6003 D-GR HMA TY-B 4709 TON $120.00 $565,080.00 $160.00 $753,440.00 $150.00 $706,350.00 $148.00 $696,932.00 $150.00 $706,350.00 $150.00 $706,350.00 $127.00 $598.043.00 PG64-22 EXEMPT 75 3076-6077 D-GR HMA TY-D 811 TON $170.00 $137,870.00 $198.00 $160,578.00 $192.00 $155.712.00 $187.00 $151,657.00 $200.00 $162,200.00 $200.00 $162.200.00 $166.00 $134,626.00 SAC-B PG70-22 EXEMPT 76 6001-6002 Port Changeable Mess 2 EA $18,000.00 $36,000.00 $24.000.00 $48.000.00 $25.000.00 $50.000.00 $24,000.00 $48,000.00 $34.000.00 $68,000.00 $75,000.00 $150,000.00 $49,050.00 $98.100.00 5ign 77 7134-6013 ADJ WW MANH 6 EA $4,000.00 $24,000.00 $1.800.00 $10,800.00 $2.100.00 $12,600.00 $549.00 $3.294.00 $1.100.00 $6,600.00 $1,500.00 $9,000.00 $2,500.00 $15,000.00 78 CORR 436 PC Concrete Valley 335 SF $30.00 $10,050.00 $18.00 $6,030.00 $18.65 $6,247.75 $25.00 $8.375.00 $20.00 $6.700.00 $110.00 $36,850.00 $80.00 $26,800.00 Gutters CORR 505-1 12" AWWA C900 79 DR18 PVC Pipe w/24" Steel 60 LF $540.00 $32,400.00 $485.00 $29,100.00 $500.00 $30,000.00 $540.00 $32.400.00 $270.00 $16.200.00 $750.00 $45.000.00 $450.00 $27,000.00 Casing by Open Cut 80 CORR 505-2 12" PC350 DI Pipe 10 LF $660.00 $6.600.00 $700.00 $7,000.00 $605.00 $6,050.00 $640.00 $6,400.00 $350.00 $3,500.00 $700.00 $7,000.00 $625.00 $6,250.00 w/24"Casing by Open Cut CORR 505-3 8" AWWA C900 81 DR18 PVC Pipe w/18"Casing by 29 LF $470.00 $13.630.00 $650.00 $18.850.00 $365.00 $10.585.00 $440.00 $12.760.00 $220.00 $6,380.00 $700.00 $20,300.00 $375.00 $10,875.00 Open Cut 82 CORK 505-4 Conc Encasement 8" 95 LF $130.00 $12,350.00 $145.00 $13.775.00 $115.00 $10,925.00 $85.00 $8.075.00 $160.00 $15,200.00 $100.00 $9,500.00 $300.00 $28.500.00 Dia Pi 83 CORR 505-5 Split Steel Casing 20 LF $320.00 $6,400.00 $600.00 $12.000.00 $655.00 $13.100.00 $495.00 $9,900.00 $370.00 $7,400.00 $500.00 $10.000.00 $375.00 $7.500.00 84 CORR 510-1 12" AWWA C900 1455 LF $290.00 $421,950.00 $125.00 $181.875.00 $155.00 $225,525.00 $265.00 $385,575.00 $220.00 $320,100.00 $250.00 $363,750.00 $165.00 $240,075.00 DR18 PVC Pipe by Open Cut 85 CORR 510-2 8" AWWA C900 316 LF $200.00 $63,200.00 $95.00 $30,020.00 $120.00 $37,920.00 $205.00 $64,780.00 $230.00 $72,680.00 $350.00 $110.600.00 $185.00 $58,460.00 DR18 PVC Pipe by Open Cut 86 CORR 510-3 12" PC350 DI Pipe 43 LF $350.00 $15,050.00 $165.00 $7,095.00 $180.00 $7,740.00 $312.00 $13,416.00 $320.00 $13,760.00 $500.00 $21,500.00 $325.00 $13.975.00 by Open Cut 87 CORR 510-4 Ductile Iron Fittings, 5.7 TON $5,000.00 $28,500.00 $11,000.00 $62,700.00 $6,700.00 $38,190.00 $6,470.00 $36,879.00 . $6,500.00 $37,050.00 $50,000.00 $285,000.00 $6,250.00 $35,625.00 mi 88 CORR 510-5 Wet Connection to 2 EA $8.000.00 $16,000.00 $4.500.00 $9,000.00 $4,900.00 $9,800.00 $4,990.00 $9,980.00 $5,000.00 $10,000.00 $25,000.00 $50,000.00 $15,000.00 $30.000.00 12"Water Main 89 CORR 510-6 Wet Connection to 2 EA $10,000.00 $20,000.00 $8,000.00 $16.000.00 $4.200.00 $8.400.00 $4.770.00 $9.540.00 $6,200.00 $12.400.00 $25,000.00 $50,000.00 $25,000.00 $50.000.00 10"AC Water Main 90 CORR 510-7 Wet Connection to 8" 3 EA $6,000.00 $18,000.00 $3,800.00 $11,400.00 $3,200.00 $9,600.00 $2,690.00 $8.070.00 $4,000.00 $25,000.00 $25.000.00 $75.000.00 $15,000.00 $45,000.00 Water Main 91 CORR 510-8 Wet Connection to 6" 2 EA $5,000.00 $10.000.00 $3,800.00 $7,600.00 $4,000.00 $8,000.00 $2,930.00 $5,860.00 $5.500.00 $11,000.00 $25,000.00 $50,000.00 $15,000.00 $30,000.00 Water Main BID TABULATION THE CITY OF ROUND ROCK Bid Extended By:Dawn Scheel =�E OF Transportation Department Print Name Initials 3400 Sunrise Rd. Bid Opening Date: 12/3/2024 Round Rock, Texas. 78665 Bid Opening Location:Bob Bennett Building j' - -.. �0, i DAWN E.SCHEEL j Liquidated Damages: 0 66577 .. i No.of Responses: 7 /-p Project Name: Chisholm Trail South Improvements Project Manager: Dawn Scheel t1IOc'•. ce NSE ..•\�'�� Project ID: Project Consultant:Freese&Nicholst1\1%ONA ENG- Project Duration:509 Calendar Days 92 CORR 10-9 10" Existing AC 1691 LF $15.00 $25,365.00 $85.00 $143,735.00 $25.00 $41275.00 $10.00 $16,910.00 $25.00 $42,275.00 $50.00 $84,550.00 $75.00 $126,825.00 Waterline Aband and Grout Fill 93 11000RR 510-10 8" Exist AC 28 LF $30.00 $840.00 $250.00 $7,000.00 $115.00 $3,220.00 $17.00 $476.00 $65.00 $1,820.00 $50.00 $1,400.00 $150.00 $4,200.00 Waterline Aband and Grout Fill 94 CORR 510-1 1 6" Exist AC 308 LF $10.00 $3,080.00 $95.00 $29,260.00 $23.00 $7,084.00 $5.00 $1.540.00 $35.00 $10,780.00 $50.00 $15.400.00 $95.00 $29,260.00 Waterline Aband and Grout Fill 95 CORR 510-12 6" Exist AC 32 LF $20.00 $640.00 $450.00 $14,400.00 $280.00 $8.960.00 $43.00 $1,376.00 $100.00 $3,200.00 $50.00 $1,600.00 $450.00 $14,400.00 Waterline Aband and Remov 96 CORR 510-13 1" DIA HDPE 5 EA $2,000.00 $10,000.00 $2.600.00 $13,000.00 $3,800.00 $19,000.00 $3.090.00 $15,450.00 $3.000.00 $15.000.00 $20,000.00 $100.000.00 $1,500.00 $7,500.00 Service 97 CORR 510-14 1.5" DIA HDPE 5 EA $2,500.00 $12,500.00 $2,600.00 $13.000.00 $3.900.00 $19,500.00 $4.070.00 $20,350.00 $3,800.00 $19,000.00 $20,000.00 $100,000.00 $2,500.00 $12.500.00 Service 98 CORR 510-15 2" DIA HDPE 1 EA $3,000.00 $3,000.00 $2,600.00 $2,600.00 $4,000.00 $4,000.00 $5.320.00 $5,320.00 $4,500.00 $4,500.00 $20,000.00 $20,000.00 $3,000.00 $3,000.00 Service CORR 510-16 Remove and 99 Replace Exist 6"WW line w/SDR- 44 LF $400.00 $17,600.00 $600.00 $26,400.00 $180.00 $7,920.00 $102.00 $4,488.00 $230.00 $10,120.00 $2,500.00 $110,000.00 $55.00 $2,420.00 26 ASTM D2241 PVC 100 CORR 5510-17 Aband Exist Water I I EA $1,000.00 $11,000.00 $80000 $8.800.00 $920.00 $10,120.00 $220.00 $2,420.00 $1.000.00 $11,000.00 $2,500.00 $27,500.00 $13.925.00 $153.175.00 Sery Line 101 CORR 510-18 Cement Stabilized 45 LF $200.00 $9,000.00 $300.00 $13,500.00 $275.00 $12,375.00 $38.00 $1,710.00 $90.00 $4,050.00 $250.00 $11,250.00 $425.00 $19,125.00 Sand Embedment 102 CORR 510-19 Flowable Fill 2 CY $500.00 $1.000.00 $3,000.00 $6,000.00 $1,200.00 $2.400.00 $207.00 $414.00 $730.00 $1.460.00 $2,500.00 $5,000.00 $325.00 $650.00 103 CORR 511-1 Gate Valve MJ 12 EA $6,300.00 $75,600.00 $6,800.00 $81,600.00 $5,700.00 $68,400.00 $5,570.00 $66,840.00 $6,000.00 $72,000.00 $10,000.00 $120,000.00 $14,250.00 $171,000.00 104 CORR 511-2 8"Gate Valve MJ 8 EA $3,700.00 $29.600.00 $3,600.00 $28,800.00 $3,800.00 $30.400.00 $3,370.00 $26,960.00 $3,300.00 $26,400.00 $10,000.00 $80,000.00 $8,750.00 $70,000.00 105 CORR 511-4 Fire Hydrant 3 EA $11,800.00 $35.400.00 $10,500.00 $31,500.00 $13,500.00 $40.500.00 $17.000.00 $51,000.00 $9,500.00 $28,500.00 $15.000.00 $45,000.00 $12,500.00 $37,500.00 Asssemby 100 CORR 511-4 Fire Hydrant 3 EA $2,000.00 $6.000.00 $2,000.00 $6,000.00 $2,000.00 $6,000.00 $439.00 $1.317.00 $1,000.00 $3,000.00 $2,500.00 $7,500.00 $5.000.00 $15,000.00 Asssemby Removal 107 CORR 628 Filter Curb Inlet Protect 18 EA $245.00 $4,410.00 $105.00 $1,890.00 $200.00 $3,600.00 $97.00 $1,746.00 $200.00 $3.600.00 $250.00 $4,500.00 $125.00 $2,250.00 New Inlet 108 CORR 628 Filter Curb Inlet Protect 4 EA $125.00 $500.00 $105.00 $420.00 $335.00 $1,340.00 $97.00 $388.00 $200.00 $800.00 $250.00 $1,000.00 $125.00 $500.00 Exist Inlet 109 Erosion Control Force Account 1 LS $10,000.00 $10.000.00 $10,000.00 $10,000.00 $10200.00 $10,000.00 $10,000.00 110 1 Safety Cont Force Acct I LS $20,000.00 $20,000.00 $20.000.00 $20,000.00 $20,000.00 1 $20.000.00 $20,000.00 TOTALS $5,158,105.80 $5,487,395.00 $5,638,181.15 1 $4,261,098.00 $4,174,454.00 $6,257,206.00 $5,301,760.00 BID TABULATION THE CITY OF ROUND ROCK Bid Extended By:Dawn Scheel Transportation Department Print Name Initials PjE• F .r- TF1 ttt 5. t 3400 Sunrise Rd. Bid Opening Date: 1213/2024 r Ill Round Rock, Texas. 78665 Bid Opening Location:Bob Bennett Building i DAWN E.SCHEEL i Liquidated Damages: No.of Responses: 7 l/l 66$77 :.�Q-i O (Project Name: Chisholm Trail South Improvements Project Manager: Dawn Scheel llt�c'. e"s� Project ID: Project Consultant:Freese&Nichols t1'y O"`�Nr� Project Duration:509 Calendar Days Mayor CouncUrnembers City Manager Craig Morgan Michelle Ly Brooks Bennett yam' Rene Flores Melissa Fleming ROUND ROCK TEXAS Mayor Pro-Tem Frank Ortega City Attorney PUBLIC WORKS Kristin Stevens Hilda Montgomery Stephanie L. Sandre January 22, 2025 City of Round Rock City Council RE: Bid Opening and Recommendation of Award - Chisholm Trail South The bid opening for CORR, Chisholm Trail South was conducted on Tuesday December 3, 2024. Seven (7) bids were received for this Competitive Sealed Proposal for Construction Services and the bid tabulation is attached for information. Using the Competitive Sealed Proposal methodology, Cash Construction Company, Inc. was selected as the successful bidder with a bid of$4,261,098.00. It is hereby recommended that the contract for construction of the Chisholm Trail South project be awarded to Cash Construction Company, Inc. Sincerely, �DO-A��e Dawn E. Scheel, PE Project Manager CORR Public Works Department CITY OF ROUND ROCK PUBLIC WORKS DEPARTMENT.3400 Sunrise Road, Round Rock,Texas 78665 (P)512.218.5555.(F) 512.255.6916.roundrocktexas.gov m o o o o 46 cc V o F' L " N 2 5 O U U J N J N Q o C (n C U N fl N y N J U V U o o o c U U Price $4,161,454.00 $5,487,395.00 $5,638,181.15 $5,158,105.80 $4,261,098.00 $6,275,206.00 $5,301,760.00 Quoted Price,cost methodology,alternatives 50 38 36 47 49 33 39 50 proposed and markup for changes? Past Projects with References Listed 8 3 6 7 9 4 4 10 5 projects provided 3-$11M-$32M List of projects Missing provided.No $6m&$3.2M.No Provided huge completion dates. location of orfor contract amount No%completed; Provided list from spreadsheet of All other whom constructed; 3.1 Experience.Current Project-Attach a list Provided spreadsheet for listed;no No info for May 15,2024. Did completed projects information was no general nature of of all projects your organization is currently current work from 6.7.24. percentage contacts provided; not provide the when we asked for provided.Current the work provided;no constructing.Provide all required information All info included. complete; Missing specific information Current work with lots work with lots of scheduled requested info for completion dates we requested. both owner and of information detail. References completion date or engineer contact were positive. owner and engineer contact information. information. Large generic list submitted Not list of All requested Provided list from 3-5 requested. 7 projects included information was May 15,2024.Did Locations not Asked fora-5 Actually answered the 4 within 5 years; provided.3 not identify 3-5 provided;original and 5 Projects listed but all projects not 31.Did question and work similar to projects close project as actual cost at 3.2 Relevant Work Experience Want 3 required information not provided all CTS;No engineer not provide municipalities and requested. Not completion not projects with specific information requested. provided. information info;no PMs or information under$10 M. sure if information is provided;start date requested(e);(f); requested. Superintendents Lehman Rd similar current. Did not and original duration (h);or(i). identified complexity& provided all not provided; scope. Corridor H information Engineer name and a bit too. requested. info not provided;PM and Superintendent not provided. Generalized 3 3.6 Experience In high pedestrian and No problems or projects 4 projects with Did not answer all Vague answer with constraints mentioned but no the questions from no specific projects vehicular traffic. Identify Good answer about Good answer to the issues identified problems/constraints and how you overcame experience in these areas identified. Have question. specific with how they Section identified;no them. worked in issues/resolutions overcame them. Experience constraints and how downtown areas. other than good includingthis one. they overcame them. communication. Company and Construction Team Qualifications 10 12 8 14 5 5 35 Lots of projects Lots of experience Company is Company is Company is Lots of projects listed to listed to show Lots of project Is the company competent and experienced on projects. competent based competent based competent based on show experience to experience to history. Believe they to complete the proposed project? Competent to do on previous on previous projects previous projects complete this project. complete this would do a good job. the work. projects listed. listed. listed. project. Paul DeNucci will be PM&Joshua Walenta Super.?- Resume only for not specified. No Says see attached 4.1 Personnel. Identify PM and not provide provided. Missing Experience with Resumes(2)do Yes,Resumes(4) Project Manager. Only have resume for Sr. references with PM and but nothing attached. Project Manager not phone numbers,no Superintendent NO personnel Superintendent for the project.Attached references.One addresses but all Aviation work no Superintendent. No city of residence identified but did not identified for these resume with specific information requested. did not provide other required mention of references provided. noted,just listed include resumes. roles.No resumes address. information there. Transportation work every project they included. have ever done. experience. Not really a resume of capabilities. They have worked together on many projects that were No successful but no Teams has worked Yes they worked mention/informatio Says team has 4.2 Has this team worked together previously 3 projects listed. specific project list Did not answer this together. Projects together.List of n identifying team or worked together on Were these projects successful?List the No mention of if is included.They question. identified that were successful work experience two projects-both projects. successful. are currently on successful. projects included. together. PM buildings. CTN.CL was a bit difficult on aviation experience. submittals for CTN. Project Plans,Approach and Sequencing, 0 10 3 11 25 10 5 25 and Quality Control Schedule meets Included schedule NO schedule provided City needs but they Schedule provided Start 4.1.2025 and but they intend on are concerned Provided proposed but does not show sub comple.on meeting it?Will about project work plan with some the required break 5.1 Describe proposed work plan. Interested 6.17.26.We provide schedule if in starting on time Complete good detail. from Novemberto in sequencing plan and scheduled order and No schedule provided or top 3 bidders.List specified of and a concern schedule provided Schedule extremely January and should Plan for work. approach to accomplish full build out of substantial about milestones with sequencing of basic just a list of have more activities project. Be aware of vehicle and pedestrian completion by May activities for work plan.Want the CORK on projects in work and QC items and dates. No and details to show constraints etc. 18,2026 Steps to work with their general.They program. Gant/CPM chart to work sequence. appear to be in current work load and foresee additional show relationship Generic work plan order.Breaks will bid accordingly(?) costs for between activities. nothing specific for accounted for. mobilization and this project. materials. Contingency plan is to work as much as Very specific with 5.5 Does the company have a back possible until a point available No mention of contingency Generic answer for up/contingency plan for any unanticipated Not specific where going forwardresources etc.to Nothing specific. Nothing specific. delays? plan. would not be Contingency plan. accelerate if need economical for them be. or CORR. (???) Good description of quality program used for the 5.6 Describe your quality control program NO written quality Very detailed QC company.Took 3 projects from including methods used to ensure quality Mentioned-no control plan,just plan for the Section 3 Basic Ideas for QC. Basic Ideas for QC. control during construction phases of the specifics for 3 check each others company.No 3 Experience and Did not identity 3 Did not identify 3 project.Provide specific examples of how No quality plan mentioned projects or how work.3 projects not projects provided these techniques or procedures were used related to this identified with with specific identified how they projects and provide projects and provide from an of the three 3 projects listed in successfully used details for each. details for each. y ( )p i project. information examples of how response to Section 3 Experience. requested. used on projects. techniques and procedures from their QC program for a successful outcome. Compliance with Administrative Requirements and Information Requested 4 8 6 10 6 6 10 8 Did the Proposer follow the Proposal No. Did not answer all Answered most Mostly,Didn't answer Mostly,Didn't Mostly,Didn't Mostly,Didn't answer Instructions and Format? questions. questions. all questions answer all Yes answer all questions all questions questions TOTAL 69 69 63 81 107 58 59 110 0 5 ` 5 aowa .04 y['"� : ~ �� t y -44f.��� f�I .I' - •,V��� � r 1 � ^rryt ;1 ' • . " ,�. • .. A:p At L . + _ , !► t � •" lr.: � of r a* +' ,'1 wt t 1V •h 1!, Legend Chisholm Trail South Improvements Chisholm Trail South Improvements Round Rock Public Works Department ROUND ROCK TEXAS September 2024 a 250 Feet I I I