R-2025-046 - 2/13/2025 RESOLUTION NO. R-2025-046 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with C.C. Carlton Industries, LTD for the Chandler Road 36-inch Water Transmission Main Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with C.C. Carlton Industries, LTD for the Chandler Road 36-inch Water Transmission Main Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 13th day of February, 2025. 40,1 CRA14 MOR AN,Mayor City of Roun Rock, Texas ATTEST: ANN FRANKLIN, City Clerk 0112.20252;4900-7490-9460 EXHIBIT "A" Page 1 of 4 Contract Quantity Adjustment/Change Order m,006 Department: Public Works Project Name: Chandler Road 36-Inch Water Transmission MAIN Date: 1/15/25 City Project Change Order/Quantity ID Number CRDWL Adjustment No. CO 1 Vendor C.0 Canton Industries, LTD 3102 Bee Caves Rd.Ste.200 Austin Texas, 78746 512-4764282 Company Name Address Phone No. Justification Removal of last bore at FM 1660 to avoid conflicts with a planned future intersection improvement.Addition of flowable fill along portions of the project that are in conflict with future Chandler Road expansion,adding a bore location at CR 130 and omitting installation of 1-36-Inch Gate Valve. SUMMARY Amount %Change Original Contract Price: $11,161,145.40 Previous Quantity Adjustment(s): ¢0.00 This Quantity Adjustment: -$156,556.00 Total Quantity Adjustment(s): -$156,556.00 Total Contract Price with Quantity Adjustment(s): $11,004,589.40 Previous Change Order(s): $0.00 0% This Change Order: $163,103.13 1% Total Change Order(s)To Date: $163,103.13 1% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $11,167,692.53 Difference between Original and Adjusted Contract Prices: $6,547.13 Original Contract Time: 300 days Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 35 New Contract Time: 335 days Prepared By: C tx Mark Hurd, Project Manager,City of Round Rock 1/15/25 Signature Printed Name,Title,Company Date Contractor: Garrett Gunter, Project Manager, CCCarlton 1/15/2025 Signa re Printed Name,Title,Company Date City Project Manager: Mark Hurd 1/15/25 Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 4 lmll' Contract Quantity Adjustment/Change Order ev,G1/16 Project Name: Chandler Road 36-Inch Water Transmission MAIN Quan.Adj./Change Order No.: CO 1 Change Order Data Contract Time Item# Item Description Unit Qty. Unit Price Amount Adjustment inauci evise bacKtill of pipe per Detail B on sheet CZ-2 as indicated on Revised 1.1 ISheets C-11,C-12,C-13 and C-21 LF 822 1 $127.09 $104,467.98 5 Per revised Sheet C-19, provide and field route 1-Inch Sch 80 PVC conduit from rectifier(STA 87-60)to a power source provided by the City of Round Rock. 1.4 Estimated length is 2,300 LF. LS 1 $3,350.00 $3,350.00 5 Per revised Sheetsan ,revise installed depth of 36-inch CL 250 Ductile IronPipe to depths from STA 102+00 to 1.5 STA109+00 LF 700 $74.23 $51,961.00 5 1.11 Restocking fee 10%for Steel Casing LF 159 $35.85 5,700.15 0 1.12 Deduct for installation of Gate Valve EA 1 -$5,876.00 -$5,876.00 0 1.13 Enlarge thrust block EA 1 $3,500.00 $3,500.00 0 $0.00 0 0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 0.00 $0.001 Page 3 of 4 P.* Contract Quantity Adjustment/Change Order ev,01/16 Project Name: Chandler Road 36-Inch Water Transmission MAIN Quan.Adj./Change Order No.: CO 1 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment Per revised sheet C-12 and C-13, provide 36-inch CL 250 Ductile Iron Pipe in steel casing by trenchless method, Including excavation,joint restraints, steel casing, boring pits,dewatering, polyethylene wrap, bedding, backfill and trench surface restoration, complete in place as detailed 1.2 and specified. LF 215 $1,940.00 $417,100.00 20 Per revised sheet C-12 and C-13, provide 36-inch CL 250 Ductile Iron Pipe in steel casing, (open cut),Including excavation, joint restraints,steel casing, boring pits, dewatering, polyethylene wrap, bedding, backfill and trench surface restoration, complete in place as detailed and 1.3 specified. LF -215 $940.00 -$202,100.00 0 Per revised Sheet C-25, provide 36-Inch CL 250 Ductile Iron Pipe in Steel Casing by Trenchless Method,including excavation,joint restraints, steel casing, boring pits, dewatering, polyethylene wrap, bedding, backfill,and trench surface restoration,complete in place as 1.6 detailed and specified. LF 110 $1,940.00 $213,400.00 0 Per revised Sheet C-25, remove 36-Inch CL250 Ductile Iron Pipe in steel casing, (open cut), including excavation,joint restraints, steel casing,dewatering, polyethylene wrap, bedding, backfill,and trench surface restoration, complete in 1.7 place as detailed and specified. LF -110 $940.00 -$103,400.00 0 remove 36-Inch CL250 Ductile Iron Pipe in steel casing,(open cut),joint restraints(as required),fittings, excavation,dewatering, polyethylene wrap, bedding, backfill,and trench surface restoration,complete in place as 1.8 detailed and specified. LF -187 $448.00 -$83,776.00 0 Page 4 of 4 Contract Quantity Adjustment/Change Order !fes om, 0 rev,01,16 Per revised SheetS C-36,remove 36-Inch CL250 Ductile Iron Pipe in steel casing, (open cut), including excavation,joint restraints, steel casing,dewatering, polyethylene wrap,bedding, backfill,and trench surface restoration,complete in 1.9 place as detailed and specified. LF -159 $940.00 -$149,460.00 0 Per revised SheetS C-36,remove 36-Inch CL250 Ductile Iron Pipe in steel casing by trenchless method, including excavation, joint restraints, steel casing, boring pits, dewatering, polyethylene wrap, bedding, backfill, and trench surface restoration, complete in place as detailed and 1.10 specified. LF -128 $1,940.00 -$248,320.00 0 $0.00 0 $0.00 0 0.00 0 0.00 0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 `^ Ilk ObdiwWORhandler Road s` jppp Vag t. �• `y �..x ♦ r i gyp. t ap 1 y T ! 1 i • • r Chandler Road 36-inch ROUND ROCK Water Transmission Main