Loading...
CM-2025-032 - 2/7/2025 STATE OF TEXAS § § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WAELTZ & PRETE,INC. ("Engineer") ADDRESS: 211 N. A.W. Grimes Boulevard,Round Rock,TX 78665 PROJECT: Downtown Small Waterline Replacement This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock,Texas,hereinafter called the"City"and Waeltz&Prete, Inc.,hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 22nd day of August, 2024 for the Downtown Small Waterline Replacement Project in the amount of$166,781.86; and WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $14,750.00 to a total of$181,531.86; NOW THEREFORE,premises considered,the City and the Engineer agree that said Contract is amended as follows: I. Article 2,Engineering Services and Exhibit B,Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $14,750.00 the maximum amount payable under the Contract for a total of$181,531.86,as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF,the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 �2428;4928-3121-8960 84275 2ea6"---Caz 1 WAELTZ & PRETE, INC. By: Antonio A. Prete. P.E. - President 30 Jan 25 Date Supplemental Contract Rev.06/16 0199.202428;4928-3121-8960 84275 2 CITY OF ROUND APPROVED AS TO FORM: By: �� �/r� Step anie L. Sandre, City Attorney Printed Name: &Zk 4 S ge/1f) ff Title: ',i] MAag r Date Signed: 7/ZS • Supplemental Contract Rev.06/l6 0199.202428,4928-3121-8960 84275 3 WAELTZ & PRETE, INC. Small Water Line Projects ADDENDUM TO EXHIBIT "B" ENGINEERING SERVICES 1. PROJECT START-UP: a. Project Kick-Off Meeting. Coordinate with the City of Round Rock to identify project goals, schedules, and design elements. b. Gather, assemble, and review existing As-Built information within project limits. c. Site visits. 2. PROJECT COORDINATION & MEETINGS: a. Project coordination meetings with the City of Round Rock throughout the design process (Assumes 3 — 2 hour meetings: 30%, 90%, 100%). b. Coordinate and meet with the project Team for items such as schedule, design coordination, and deliverables (Includes Project Surveyor). DESIGN PHASE (CD): Waeltz & Prete, Inc. shall prepare detailed construction plans for the project. The project scope includes the design of water line replacements at 7 various locations (See attached exhibits). Scope of services to include preparation of construction drawings, specifications, & Engineer's Opinion of Probable Construction Cost. 3. CONSTRUCTION DRAWINGS (CD —30%, 90% & 100%): The Final Construction Drawings will include: a. City of Round Rock General Construction Notes and Project Specific Notes. b. Overall Project Site Plan. c. Demo Plans. d. Erosion, Sedimentation, & Tree Protection Plans. e. Utility Plans. f. Traffic Control Plans. g. Construction Details, as required. h. Prepare plan submittals at 30%, 90%, and 100%. i. Revise "Engineer's Opinion of Probable Construction Cost" for 30%, 90% & 100% submittal. j. QA/QC— In house. WAELTZ & PRETE, INC. Small Water Line Projects 4. PERMIT PROCESSING: a. Process plans for approval through the City of Round Rock's Utilities & Environmental Services Department. 5. BIDDING: a. Preparation of the City of Round Rock's standard contract documents and specifications. b. Issue addendums/clarifications, if required. c. Attend and preside over the pre-bid conference & bidding opening. d. Prepare bid tabulations and assist the City of Round Rock with the evaluation of bids and recommendations of the Contractor. 6. CONSTRUCTION PHASE: a. Attend and preside over the preconstruction meeting. b. Attend bimonthly project progress meetings (assumes 5 months construction). c. Assist with pay application reviews and recommendations. d. Review of submittals, shop drawings, and samples. e. Respond to RFI's, if required. f. Periodic site visits (Assumes 2 per month). g. Preparation of final punch list. h. Issue "Engineer's Concurrence Letter" at project completion. i. Preparation of "Record Drawings". Waeltz & Prete will make changes to plans based upon Contractor's "mark-ups". 7. DESIGN & TOPOGRAPHIC SURVEY (SUB-CONSULTANT— DIAMOND SURVEY): a. Waeltz & Prete will secure the surveying services from Diamond Survey for professional land surveying. The scope will be to provide design & topographic survey. Their proposal and detailed scope of service is attached directly behind the Civil Scope of Services. 8. REIMBURSABLE EXPENSES: a. All copying, purchases of maps and documents, tax certificates, deeds, plats, printing of reports and plans, mailing, courier, express/overnight and other related expenses shall be charged at cost. 9. SUPLIMENTAL#1 — DESIGN OF ALLEY WASTEWATE LINE: Page 2 of 3 WAELTZ& PRETE, INC. Small Water Line Projects a. Provide additional topographic surveying scope of services. Survey services to be provided by subconsultants Diamond Surveying, Inc. b. Provide additional engineering scope of services. Design of replacement wastewater line within the existing alley. (See attached scope limits). CLARIFICATIONS • The scope for Area 6 is not entirely known. Water line easements for the existing and proposed infrastructure will be determined through the design process. Once the total number of easements are verified, a supplemental services fee will be initiated for those easements. • The scope excludes Subsurface Utility Engineering for existing infrastructure. Existing utilities will be located based upon provide as-built drawings, 811 Locates, &visible utilities. • The City Attorney's office will aid with title searches, if needed. • The Surveyor will send Right-of-Entry letters as noted in their proposal. The city will assist with landowner's that deny access to the project areas. EXCLUSIONS ➢ Conflict Resolution ➢ Traffic Impact Analysis ➢ Legal Lot Determinations - Construction Staking ➢ Off-Site Designs of Any Nature ➢ Subsurface Utility Engineering ➢ Water System Modeling ➢ Assembly and Recording of Legal Documents ➢ Geotechnical Construction Testing ➢ Governmental Fees & Fiscal Lab Services • Environmental Studies ➢ Preparation & Processing of Waivers, or Variances • Platting ➢ SWPPP (End of Basic Scope of Services) Page 3 of 3 CityView 0 % —S Sign In °• Find addres or place CAIIII • '+ / . r e■ /'/• 's t l 9�/' • ` b �,4 e 1 ' a . V k 1 . A • ' k. 'f.' `' � 6. Ito le°,\r- 't- _- 41. . \ 106 _.. - ,-• , al. .., k. - . ilfirgli -.A • \ \1 "f` + • 4ck ki 416.. it'It ‘ • S \ \ Aar . •- r A AO .-- . it . ' V lilt cl SURVEY&CIVIL41111.00r11.60, LIMITS OF SCOPE , ,4 \ill d FOR P "� ' WASTEWATER p®- .\ , .»' �D \IS LINE 0 m bCc''c:\ lir REPLACEMENT r'` ,N s • all Pv E A �'�PGpV� ,. .. . , ..„. _.... ion, Isos City of Round Rock Utilities and Environment I Services Department Powered by Fsr WAELTZ& PRETE, INC. Small Water Line Projects ADDENDUM TO EXHIBIT "C" WORK SCHEDULE • Notice to Proceed (NTP) August 9, 2024 • Project Start-Up August 9. 2024 • Project Coordination & Meetings On Going • Design & Topographic Survey September 02, 2024 • 30% Drawing Submittal November 01, 2024 • 60% Drawing Submittal December 06, 2024 February 06, 2025 (REV) = 90% Drawings Submittal January 03, 2025 March 03, 2025 (REV) • 100% Drawing Submittal February 07, 2025 April 07, 2025 (REV) • Approved Drawings by CORR February 14, 2025 April 14, 2025 (REV) • Bidding (Post vis Civ Cast) February 17, 2025 April 17, 2025 (REV) • Award of Contract By City Council March 20, 2025 May 20, 2025 (REV) • Precon April 07, 2025 June 07, 2025 (REV) • Begin Construction April 21, 2025 June 21, 2025 (REV) • End Construction September 26, 2025 November 26 2025 (REV) ADDENDUM TO EXHIBIT D FEE SCHEDULE Attached Behind This Page ADDENDUM TO Exibit D-Project Summary: Small Water Line Projects WAELTZ&PRETE,INC. CIVIL ENGINEERS 07/02/2024 Revised 1/29/2025 Task Description PM PE EA SCT ECT ADM D.1-Project Start-up 10 22 0 0 0 0 D.2-Project Coord&Mtgs 40 9 0 0 0 8 D.3-Construciton Documents(CD-90%&100%) 43 178 0 0 0 0 D.4-Permit Processing 8 32 0 0 0 0 D.5-Bidding 18 24 0 0 0 0 D.6-Construction Phase 51 36 0 0 0 0 Total Hours 170 301 0 0 0 8 Salary Rate $77.00 $45.00 $35.00 $25.00 $18.00 $25.00 Direct Labor Cost $13,090.00 $13,545.00 $0.00 $0.00 $0.00 $200.00 Engineering Services Fee: Task Direct Labor Overhead Tot lab+OH Fixed Fee Total Cost 1.57 12% D.1-Project Start-up $1,760.00 $2,763.20 $4,523.20 $542.78 $5,065.98 D.2-Project Coord&Mtgs $3,685.00 $5,785.45 $9,470.45 $1,136.45 $10,606.90 D.3-Construciton Documents(CD-30%,90%&100%) $11,321.00 $17,773.97 $29,094.97 $3,491.40 $32,586.37 D.4-Permit Processing $2,056.00 $3,227.92 $5,283.92 $634.07 - $5,917.99 D.5-Bidding _ $2,466.00 $3,871.62 : $6,337.62 $760.51 $7,098.13 D.6-Construction Phase $5,547.00 $8,708.79 $14,255.79 $1,710.69 $15,966.48 Total Engineering Fee $26,835.00 $42,130.95 $68,965.95 $8,275.91 $77,241.86 D.7-Sub Consultant-Topographic Survey-Diamond Surveyin $88,040.00 Reimbursable Expenses: Copying and Reproduction $1,500.00 TOTAL FEE FOR BASIC SERVICES $166,781.86 D.9 Supplemental#1 -Design of Alley Wastewater Line $14,750.00 REVISED FEE FOR BASIC SERVICES&SUPPLEMENTAL#1 $181,531.86 N \ . et cE3 ' tailliirkt . .., Ifire_A It. .- A, A . 24:1•„, '‘4 CE3/ ii fAl% 6 \ -- , % S __.,..,-- , 1•1 A ...--'---- .1. , • Ok ...... I ...!.. r• •• e yt. alprip _ \ \ Ji-• . ‘% . ,„. . . - \ . . , . .,, •-- 1 O' . s% AO' • S • S55 _. . / , 4 .. it . • „ . -.±'A t /01°4• • '. - t't''' I* • ..f • 0 4. 2,. , k t \ # , . -"Atifi. • ‘ t - . . . .. 4 s‘..ay -., .4,, t• ,,,,, - ...- , • - • S • • , Ot '% , , !c. • • t- 1 • • i..1•,, . 1 . 4 .. ., ,. • ‘t1,14 ,00 ' CPS, .• - - ,• ‘• \ i, fort°Ail - ... • .• °-''', ,g-il 18•T:88 • - . .' ' \ i• i ' 0 00.•-• . Al .-. ........,.- • 1. Ill . ,.., 1110tp 11. * ..• 4 a0104' oist_.00.00.0.00.0. ...(t..... ii, \or. . • ,,- , , . . . . . • 0 .:(. ...fr.-_ --, - ,. 4 „,..„ .. .. • p , ,, $ '-'• A '' \ r , ... . , • , ,,"/• ' •' • 4. r - 44.i, ii dr • , . 1977050 -.1.0bIL., ',,i .. _ - A. • Legend • Manholes Downtown Small WL Engineering Supplemental 1 Gravity Mains