CM-2025-056 - 3/7/2025Page 1 of 3
Contract Quantity Adjustment/Change Order
Department: Public Works
Project
Nance: Round Rock West Area 5 Water Wastewater, and Storm Drain Improvements Date: 2/27/25
City Project Change Cirder/Quantlty
ID Number RRWA5 Adjustment No. 1
Vendor Royal Vista, Inc. 350 CR 260 Liberty Bill, TX 78642
Company Name Address Phone No,
Justification
During construction it was found the condition of the existing items to remain were in poor condition and would need to be replaced. And upon
Joser inspection of stone drain connections It was determined a smaller size pipe and channel regrading was needed to ensure adequate
:learance.
SUMMARY
Original Contract Price:
Amount % Change
$3,867,802.00
Previous Quantity Adjustment(s):
This Quantity Adjustment:
$11,881.50
Total Quantity Adjustment(s):
$11,881.50
Total Contract Price with Quantity Adjustment(s):
$3,879,683:0
Previous Change Order(s):
0.00%
This Change Order:
$7,629.10 0.20%
Total Change Order(s) To Date:
$7,629.10 0.20%
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)]:
$3,887,312.60
Difference between Original and Adjusted Contract Prices:
$19,510.60
Original Contract Time:
420
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
420
S+rbittit ed for AppinawaI
Prepared By: /fJBpy�y� .Ar.�z
Noemi Avila
2128125
Signature
Printed Name, Title, Company
Date
-Approval
Contractor:
Steve Green, Vice President, Royal Vista, Inc.
02128/2025
Signature
Printed Name, Title, Company
Date
City project
Manager: &dsx4:
Noemi Avila
2/28/25
Signature
C,K.2.dz� v5�
Page 2 of 3
Contract Quantity Adjustment/Change Order
Project Name: Round Rock West Area 5 Water, Wastewater, and Storm Drain Improvements
Quan. Adj./Change Order No.:
Chance Order data
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
Da
74
Channel Excavation
LS
1
$3,000.00
$3,000.00
RC Pipe (ArchxClass III) (15-Inch), (All
Depths), Including Excavation and Backfill
LF
21.58
$145.00
$3,129.10
81
8-Inch Gate Valve and Installation
(Labor)
LS
1
$1,500.00
$1,500.00
0.00
$0.00
0.00
$0.00
$0.0
$0.00
o.oa
0.06
$0.00
$0.00
0.00
00
00
00
a.00
0.00
00
$o.
o
0.00
0.00
.oa
Page 3 of 3
Contract Quantity Adjustment/Change Order
fF!o-n�. � rcxns
re,UU16
Project Name: Round Rock West Area 5 Water, Wastewater, and Storm Drain Improvements
Quan. Adj./Change Order No.:
Ouantity Adjustment Data
Bid Item #
Item Description
Unit
qty.
Unit Price
Amount
Contract
Time
Adjustment
77
Relocate Existing Mailbox
EA
1
$500.60
$500.00
59
New Manhole Construction, Ea.
(WW) (Pre -cast Base) (All Depths)
EA
1
$9,500.00
$9,500.00
60
Remove 81 Dispose Existing Wastewater
Manhole
EA
1
$3,500.00
$3,500.00
29
Pipe (RCP Class III) 18-Inches, (All
Depths), Including Excavation and BackFill
LF
-21.58
$75.00
-$1,618.50
$0.00
$0.00
0
$6,00.
$0.00
0.00
0.06
$0,00
00
o.o
0.00
0.00
0.00
$0.00
$0.00
0.00
o.66
$0.00
TOTAIT
11 1.50
0
O
d41P'
S
�;e`N
G,�de
JO
E Lei
o�
t
t
U
4TM
1 JO
hill '
N d�
w
0
O
O
a
4)
N
peep Wood pr
0
o s
13
doo1 , ,a ]..
4-
n
Ja ,"015p � e p
P el%rl
Pbbe`1 Rd
- - J0 Po
4yood Rock Ot
�d
adJ D
�o