CM-2025-056 - 3/7/2025Page 1 of 3 Contract Quantity Adjustment/Change Order Department: Public Works Project Nance: Round Rock West Area 5 Water Wastewater, and Storm Drain Improvements Date: 2/27/25 City Project Change Cirder/Quantlty ID Number RRWA5 Adjustment No. 1 Vendor Royal Vista, Inc. 350 CR 260 Liberty Bill, TX 78642 Company Name Address Phone No, Justification During construction it was found the condition of the existing items to remain were in poor condition and would need to be replaced. And upon Joser inspection of stone drain connections It was determined a smaller size pipe and channel regrading was needed to ensure adequate :learance. SUMMARY Original Contract Price: Amount % Change $3,867,802.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $11,881.50 Total Quantity Adjustment(s): $11,881.50 Total Contract Price with Quantity Adjustment(s): $3,879,683:0 Previous Change Order(s): 0.00% This Change Order: $7,629.10 0.20% Total Change Order(s) To Date: $7,629.10 0.20% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $3,887,312.60 Difference between Original and Adjusted Contract Prices: $19,510.60 Original Contract Time: 420 Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 420 S+rbittit ed for AppinawaI Prepared By: /fJBpy�y� .Ar.�z Noemi Avila 2128125 Signature Printed Name, Title, Company Date -Approval Contractor: Steve Green, Vice President, Royal Vista, Inc. 02128/2025 Signature Printed Name, Title, Company Date City project Manager: &dsx4: Noemi Avila 2/28/25 Signature C,K.2.dz� v5� Page 2 of 3 Contract Quantity Adjustment/Change Order Project Name: Round Rock West Area 5 Water, Wastewater, and Storm Drain Improvements Quan. Adj./Change Order No.: Chance Order data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da 74 Channel Excavation LS 1 $3,000.00 $3,000.00 RC Pipe (ArchxClass III) (15-Inch), (All Depths), Including Excavation and Backfill LF 21.58 $145.00 $3,129.10 81 8-Inch Gate Valve and Installation (Labor) LS 1 $1,500.00 $1,500.00 0.00 $0.00 0.00 $0.00 $0.0 $0.00 o.oa 0.06 $0.00 $0.00 0.00 00 00 00 a.00 0.00 00 $o. o 0.00 0.00 .oa Page 3 of 3 Contract Quantity Adjustment/Change Order fF!o-n�. � rcxns re,UU16 Project Name: Round Rock West Area 5 Water, Wastewater, and Storm Drain Improvements Quan. Adj./Change Order No.: Ouantity Adjustment Data Bid Item # Item Description Unit qty. Unit Price Amount Contract Time Adjustment 77 Relocate Existing Mailbox EA 1 $500.60 $500.00 59 New Manhole Construction, Ea. (WW) (Pre -cast Base) (All Depths) EA 1 $9,500.00 $9,500.00 60 Remove 81 Dispose Existing Wastewater Manhole EA 1 $3,500.00 $3,500.00 29 Pipe (RCP Class III) 18-Inches, (All Depths), Including Excavation and BackFill LF -21.58 $75.00 -$1,618.50 $0.00 $0.00 0 $6,00. $0.00 0.00 0.06 $0,00 00 o.o 0.00 0.00 0.00 $0.00 $0.00 0.00 o.66 $0.00 TOTAIT 11 1.50 0 O d41P' S �;e`N G,�de JO E Lei o� t t U 4TM 1 JO hill ' N d� w 0 O O a 4) N peep Wood pr 0 o s 13 doo1 , ,a ].. 4- n Ja ,"015p � e p P el%rl Pbbe`1 Rd - - J0 Po 4yood Rock Ot �d adJ D �o