CM-2014-439 - 6/13/2014City of Round Rock ''ROUND ROCK TIXAS wxeose ms�ott eaosroun Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Layne Heavy Civil, Inc. for the Treated Water Transmission Line - Segment 3 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/13/2014 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $12,487.39 Indexes: Self -Financed Water Construction Attachments: CO-QA#1_TreatedTransmissionSeg3_Layne_CM6.13.14 Department: Utilities and Environmental Services Text of Legislative File CM -2014-439 The Treated Transmission Line - Segment 3 is the final segment required to deliver BCRUA treated water to the City's- transmission system from Lake Travis. Segment 3 consists of approximately 12,000 linear feet of 48 -inch waterline. The horizontal alignment of Segment 3 generally follows the future extension of New Hope Drive from Ronald Reagan Blvd. to C.R. 175 north of RM 1431. The waterline will connect to the east end of Treated Waterline - Segment 2C at Ronald Reagan Blvd. and terminate at an existing 48 -inch stub -out at the northwest corner of the RM 1431 and C.R. 175 intersection and will be constructed within a City of Round Rock Waterline Easement. A 40 -foot segment of pipe left over from BCRUA Treated Waterline - Segment 2C, and stored on the Kienke property was found to be damaged. This segment of pipe was anticipated to be used as part of this Segment 2 Project. A replacement segment of pipe has been ordered and manufactured to replace the damaged segment of pipe. The cost of this replacement.is $12,487.39. Please execute Quantity Adjustment/Change Order No. 1 in the amount of $12,487.39. Staff recommends approval. City of Round Rock Page 1 Printed on 6/12/2014 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for S:ubrnission of.ALL City Council and City Manager Items Department Name:, Utilities & Environmental Services Project -Name: Treated WaterTrans"mission Lihe- Segment'3 Project Mgr/Resource: Jeff Bell ContractorlVendor: Layne Heavy Civil, Inc, ❑Council Action: ORDINANCE RESOLUTION ,Agenda Wording City Manager Approval CMA Wording Consider executing Quantity Adjustment/Change Qrder.No: 1 with Layne. Heavy Civil, Inc. for the Treated Water Transmission Line- Segment -3 Project. Attorney -Approval Attorney. Date 0:\wdox\S.CCints10199\14:051MISC100304612.XLS Updated :613108 Pulte Ii of 3 Contract Quantity Adjusbnent/Changei Order ProjectNarne: Treated Wat&TMhiamis!eionMain No. 3, Contr0daft, Layne Heavy Civil, tric., Date: 5/29/2014 Change Ord qr/Quan* Engineer: Jacobs Eholheering.Group,,Inc. Adjustntent No JIUStification de-Quanfity Adjustment Page and'enclosed'Inknination from Layne Heavy Civil. Original Contract Price: Previous Quantity Adjustment(s): This Qd6ntlty.Adjustrnent: Total Quantity—Adjustment(s):: Total Contract Price with Quantity Adjustment I (sy Prevlous.Change Order(s):� This.ChangeOrder., Total Change Oi0er(s) To Date: original Con -tract- Price Plus Change Ord s) Flus Quantity Ijustment(s): Original Untract Time:; Contract Time Prior to this Change Order: Contract Tine with All Approvedthangebrders: Contmcidr A Citypfft . ound ' ignature Rock 'CIy of Round Rock r- CM -2014-439 Glenn A. Bridges; P.E., Project Engineer `Jacobs Engineering --Group,, Inc. Printed Nane, Camp ,jiltle an Z 14 Printed Name, Title and Company mTIEI!G NaMe, I We SS,7B,720.2.5 $01.00 $0.00 $5,725,720.25 $0.00 0-000A0 $12,487.39 0.22(i/a $12,487.39 $5,738,207.641 .342 calendar days(F inal) .342 calendar days(Final) 344 calendar days, (Final) Date z Date T4c Zof 3 Contract Quantity Adjustment/Change Order Projed Narne:,Tr66tqd WatirtipiisinIW6n Wrf - gTent 3 (-,rM-3)_,. Quart. Adj./ilah9e Order No.; I Pogc 3 of 3 Contract Quantity Adjustment/Change Order Project Name: Treated (Nater Transmission Main _Segment 3(T M-3) Quan. Adj./Change Order No.: 1 hemntiiv Arti...F - -ni n�#-9 Bid Item #fi Item Description unit'Adj Qty: Unit Price Amount Contract. 'rime ustment 2.2A 48' CL 150 Steel Pipe --�53 $272.00 ---2$0.00 MLIF45.909$12,487:94 $0.00, $0.00 $0.00 . $0.00 $0.00 $0.00 $0.00 $0.00 .. . $0.0 $0.00 $0.00 MOO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 . $0.00 $12,487.39 2