CM-2025-062 - 3/7/2025Page 1 of 3 rev, 01/16 Department: Project Name:Date:2/26/25 City Project ID Number DDIMP-595 1 Vendor Greystone Construction 512-348-1038 Company Name Phone No. Justification SUMMARY Amount % Change Original Contract Price:$4,305,750.00 Previous Quantity Adjustment(s):$0.00 This Quantity Adjustment:$0.00 Total Quantity Adjustment(s):$0.00 Total Contract Price with Quantity Adjustment(s):$4,305,750.00 Previous Change Order(s):$0.00 0% This Change Order: $32,540.55 1% Total Change Order(s) To Date:$32,540.55 1% $4,338,290.55 Difference between Original and Adjusted Contract Prices:$32,540.55 Original Contract Time:365 calendar days Time Adjustment by previous Quan. Adj./Change Order:0 Time Adjustment by this Quan. Adj./Change Order:23 calendar days New Contract Time: 388 calendar days Prepared By: Signature Printed Name, Title, Company Date Contractor: Signature Printed Name, Title, Company Date Mayor/City Manager Signature Printed Name, Title Date Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Change Order/Quantity Adjustment No. Line Item #1: Construction drawings had these outlets as standard, but due to proximity to a "wet location", the City of Round Rock inspector required that these be converted to GFCI. Line Item #2: During the RAS inspection, it was determined that locker cubbies in the ADA lockers would need to be lowered to 48" to become ADA compliant. This was not accounted for in construction drawings. Aftermarket metal lockers were modified and mounted in the ADA lockers at appropriate height. Line Item #3: (2) restrooms had non-locking hardware. This was a an error in the drawings, so we converted these restrooms to locking hardware. Line Item #4: The site fencing and gates were not accounted for in drawings and were added into the scope of the project at the request of the end user. The painting of these is being covered in this change order. Line Item #5: Additional concrete work that was not accounted for in the drawings and was determined to be outside of the original scope for Greystone. Line item #6: Landscaping was disturbed when replacing flatwork around the heritage building, sod and topsoil were brought in to revegate these areas to complete SDP closeout. Line Item #7: The specified sink for the Cafe Room had a depth that did not provide adequate knee clearance space. For this sink to become ADA compliant it was necesary to replace it with a sink with a more shallow depth. Submitted for Approval Approvals General Services Contract Quantity Adjustment/Change Order Hayden Schiller, Project Manager, City of Round Rock Josh Dyer, Senior Project Manager, Greystone Construction Address 409 West Main Street, Suite 202, Round Rock, TX 78664 Dell Diamond Visitor's Clubhouse Joshua Dyer (Mar 5, 2025 07:51 CST) Joshua Dyer Patrick Schiller (Mar 5, 2025 07:51 CST) Patrick Schiller Brooks Bennett (Mar 13, 2025 14:44 CDT) Page 2 of 3 rev, 01/16 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: 1 Item #Item Description Unit Qty.Unit Price Amount Contract Time Adjustment (Days) 1 GFCI Outlets in Lockers LS 1 $6,160.00 $6,160.00 2 ADA Locker Assemblies LS 1 $1,490.00 $1,490.00 3 Privacy Door Hardware LS 1 $238.15 $238.15 4 Painting of Site Ornamental Fences & Gates LS 1 $3,476.00 $3,476.00 5 Misc. Concrete/Batting Tunnel Caulking LS 1 $8,319.00 $8,319.00 6 Topsoil & Sod LS 1 $4,897.00 $4,897.00 7 ADA Sink & Plumbing Modifications LS 1 $975.00 $975.00 8 GCC General Conditions - 5 days @ $1,177.00/day days 5 $1,177.00 $5,885.00 9 GCC OH/P -3.5%LS 1 $1,100.40 $1,100.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:$32,540.55 23 Change Order Data Dell Diamond Visitor's Clubhouse Page 3 of 3 rev, 01/16 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.:1 Bid Item #Item Description Unit Qty.Unit Price Amount Contract Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:$0.00 0 Dell Diamond Visitor's Clubhouse Quantity Adjustment Data Greystone Construction Company 2995 Winners Circle Drive, Suite 200 Shakopee, Minnesota 55379 Phone: (952) 496-2227  Fax: (952) 445-4191  Project: GC23-8070 - Dell Diamond-Visitor CH &Stad 3400 East Palm Valley Blvd Round Rock, Texas 78665 Prime Contract Change Order #01: Final Owner Change Order TO:  FROM:   DATE CREATED:2/24/2025 CREATED BY:Josh Dyer (Greystone Construction Company) CONTRACT STATUS:Pending - Proceeding REVISION:0 DESIGNATED REVIEWER:Josh Dyer (Greystone Construction Company) REVIEWED BY:   DUE DATE:02/25/2025 REVIEW DATE:  INVOICED DATE: PAID DATE:  SCHEDULE IMPACT:5 days EXECUTED:No   SIGNED CHANGE ORDER RECEIVED DATE: CONTRACT FOR:GC23-8070:Dell Diamond-Visitor CH &Stad TOTAL AMOUNT:$32,540.55 DESCRIPTION: CE #068 - Final Owner Change Order Final Owner Requested Items: •GFCI Outlets in Lockers o Required by CoRR Inspector & Approved by Client •ADA Locker Assemblies o Required by RAS & Approved by Client •Privacy Hardware  o Not Reflected on Plans or Submittal Review •Painting of Ornamental Fence & Gates o Not Included in Original Fence & Gate Change Event •Misc Concrete o Form & Pour Ramp Inside Batting Tunnel o Form & Pour Raised Area for Washer & Dryer o Repair Curb @ ADA Ramp o Restripe Entire Fire Lane Beyond Disturbed Areas •Topsoil & Sod o Provide & Install Topsoil & Sod at Heritage Center and New Concrete to Satisfy Round Rock Civil for TCO •ADA Sink & Plumbing Mods o Required by RAS & Approved by Client •GCC General Conditions - 3 Days •GCC OH/P - 3.5% New Substantial Contract Completion Date 2.14.2025 ATTACHMENTS: S2 Sink Replacement - Chabert Plumbing.pdf, INVOICE_823_from_Espinoza Landscape and Lawncare.pdf, DELL DIAMOND T AND M AND STRIPING GREYSTONE.pdf, DELL DIAMOND CO3.pdf, 013025 DELL DIAMOND GFI RECEPTACLES.pdf   Greystone Construction Company Page 1 of 2 Printed On: 2/25/2025  03:39 PM PCCO #01 Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO #Title Schedule Impact Amount 001 Final Owner Change Order 3 days $32,540.55 Total: $32,540.55 The original (Contract Sum)$4,305,749.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $4,305,749.00 The contract sum would be changed by this Change Order in the amount of $32,540.55 The new contract sum including this Change Order will be $4,338,289.55 The contract time will be increased by this Change Order by 5 days.                              ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate  ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE Greystone Construction Company Page 2 of 2 Printed On: 2/25/2025  03:39 PM PCCO #01 Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 Chabert Plumbing LLC · 641 Commercial Dr #102 · Buda, TX 78610 Change Order #16 Project: Customer: Prepared By: Dell Diamond Visitor Center Contract #8070-23-22 Contract Date: 6/14/2024 Greystone Construction 2995 Winners Circle Drive Shakopee MN 55379 Brandon Gardner b.gardner@chabertplumbing.com 2/21/2025 1. S2 Cafe sink replacement $975.00 Description of Change: Price for SLADA1921A553 - J w/ offset tailpiece. Remove sink, replace and re pipe connection to Dishwasher. Material: $850 Labor: $125 **Sink has a 10 day lead time from approval** Total Price: $975.00 We hereby agree to make the changes specified for Total Price listed above. CONTRACTOR: Chabert Plumbing LLC The above prices and specifications of this Change Order are satisfactory and are hereby accepted. All work shall be performed under the same terms and conditions as specified in the original contract unless otherwise stipulated. ACCEPTED BY: Greystone Construction Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 I N V O I C E E spinoza Landsca pe and Lawncare 525 Oak Dr Conve rse, T X 78109 javier@espinozalandsca pe.com +1 (210) 760-7499 www.espi noza landscape.com Bill t o Greystone construction 409 West Main S treet Suite 200 Round Rock, T X 78664 Ship to Greystone construction 409 West Main Street Suite 200 Round Rock, TX 78664 Invoice details Invoice no.: 823 Terms: Net 30 Invoice date: 02/20/2025 Due date: 03/22/2025 #Date Product or service Description Qty Rate Amount 1.Gr ade an in stall 4.5 p allets o f Ber mu da gr ass at the Dell diamond stad ium. 2.P allet o f Gr ass (Saint Augu stine/Ber mu da/zo y Sia) Ber mu da ti tu4.5 $386.00 $1,737.00 3.Deliv er ies 1 $75.00 $75.00 4.So il 3 y ar ds o f so il 3 $75.00 $225.00 5.Lab or 1 $2,860.00 $2,860.00 Ways to pay View and pay Total $4,897.00 Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 Rock and Roll Concrete PO Box 2337 Round Rock, TX 78680 Prepared For & On: 02/07/2025 Greystone Construction 409 W Main #202 Round Rock, TX 78664 512.771.4727 Attention: Josh Dyer Project Address: Dell Diamond 3400 E Palm Valley Round Rock, TX 78664 Mike Hail Cell: 737-932-3225 Mike@rockandrollconcrete.com Thank you for the opportunity to provide you with this proposal. We look forward to answering any questions you may have and working with you on this project. TIME AND MATERIALS • Grind and rub walls @ outfield stairs. • Repair multiple concrete edges and chips throughout jobsite • Repair curb @ ADA Ramp • Form and pour ramp inside doorway • Form and pour raised area for washer and dryer pad $4,500.00 STRIPING • Restripe red fire lane and white “FIRELANE NO PARKING” along face of curb $800.00 PREPARED BY: Mike Hail Rock and Roll Concrete proposes to furnish material and labor to perform the work outlined herein for the sum of $5,300.00 Client Signature: Today's date: 440-1 Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 Add/Credit DESCRIPTION: $238 ORIGINAL AMT $62,997.24 ADD AMT $238.15 Total: $63,235.39 ACCEPTANCE: Regional Sales Representative Signed: Title: Date: Change Order Proposal 11240 Gemini Lane | Dallas, TX 72559 | Phone: 214-630-3965 | Fax: 214-560-0326 Respectfully Submitted, E. JORDAN Project: DELL DIAMOND Location: 3400 E PALM VALLEY BLVD ROUND ROCK, TX 78665 ADDITION OF (2) PRIVACY LEVERS (SHIPPING INCLUDED) To: GREYSTONE CONSTRUCTION Attn: JOSH DYER Date: 2/19/25 Price change to furnish the following: Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 902 OLD AUSTIN HUTTO RD. STE. 204 PH: (512) 666-5301 PFLUGERVILLE, TX 78682 FAX: (512) 861-2491 HUB CERTIFICATE #1800731507200 HUB VENDOR #469913 NAVEJAS ELECTRIC PROPOSAL To: Date: January 30, 2025 Attention: Phone: Reference: DELL DIAMOND GFI RECEPTACLES Fax: Electrical Proposal Email: We are pleased to provide the following proposal for our understanding of the electrical activities associated with the above- referenced project. Base Bid Labor (excluding sales taxes): $ 3,483.00 Base Bid Materials (excluding sales taxes): $ 1,677.00 Base Bid Total (excluding sales taxes): $ 5,160.00 Qualifications: 1. Division 16000 activities. 2. This proposal is based on a “Lump Sum Contract”. 3. Procurement and demolition of existing receptacles installed in players locker room, coach’s locker room and managers locker room. 4. Procurement and installation of new GFI receptacles in players locker room, coach’s locker room and managers locker room per request of city inspector. 5. The quote is based on information requested by the Round Rock city inspector. 6. All work is to be performed in normal business hours. Exclusions: 1. Any work not included in scope 1-6 above. 2. Premium time or Holidays. 3. Providing of dumpster 4. Providing payment & performance Contingencies: 1. Due to the volatility in copper commodities, we are unable to define accurate future costs associated with copper wire. Navejas Electric reserves the right to adjust these copper costs associated with this proposal at the time the project is awarded or notice to proceed with change orders is issued. 2. This proposal is contingent on reaching a mutually agreeable contract. 3. This proposal is contingent on being released for construction 5 days from proposal date. 4. This proposal is contingent on all submittals being released for production, with engineer comments attached, after a “one-day” submittal review cycle with the engineer. After the one-day review cycle, the submittals will be re-submitted, corrected with engineer notes, for approval through standard channels. 5. This Proposal is based on 30-day net pay. Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0 902 OLD AUSTIN HUTTO RD. STE. 204 PH: (512) 666-5301 PFLUGERVILLE, TX 78682 FAX: (512) 861-2491 HUB CERTIFICATE #1800731507200 HUB VENDOR #469913 If you should have any questions and / or comments, please contact me at (512) 661-8423 Sincerely, Joe Navejas III Navejas Electric LLC Managing Partner Regulated by the Texas Department of Licensing and Regulation, P.O. Box 12157, Austin, Texas 78711, 1-800- 803-9202, 512-463-6599; website: www.license.state.tx.us/complaints. TECL# 27964 Docusign Envelope ID: 6D7289AB-732C-4CE8-8870-5D0554ADA3D0