Loading...
R-2025-082 - 3/27/2025 RESOLUTION NO. R-2025-082 WHEREAS, the City of Round Rock has duly advertised for bids for the 2024 Residential Street Maintenance Program Project; and WHEREAS, Asphalt Inc., LLC dba Lone Star Paving Company has submitted the lowest responsible bid; and WHEREAS, the City Council wishes to accept the bid of Asphalt Inc., LLC dba Lone Star Paving Company, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Asphalt Inc., LLC dba Lone Star Paving Company for the 2024 Residential Street Maintenance Program Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of March, 2025. CRAIGORG , Mayor City of tound ck, Texas ATTEST: ANN FRANKLIN, City Clerk 0112.20252;4906-3567-5944 Mayor Councilmembers City Manager Craig Morgan Michelle Ly Brooks Bennett Rene Flores Melissa Fleming ROUND ROCK TEXAS Mayor Pro-Tem Frank Ortega City Attorney PUBLIC WORKS Kristin Stevens Hilda Montgomery Stephanie L. Sandre 3/6/2025 Michael Thane Director, Public Works City of Round Rock 3400 Sunrise Road Round Rock,TX 78665 Re: 2024 Residential Street Maintenance Program (SMP) Engineer's Recommendation of Award of Contract A total of 5 sealed bids were received and opened on March 6, 2025 for the above referenced project.The bids ranged from $5,161,262.65 to $6,361,402.95. Lone Star Paving from Austin, Texas, submitted the lowest bid in the amount of$5,161,262.65. After reviewing the contractor's experience and bid price, I recommend award of this project to Lone Star Paving in the amount of$5,161,262.65. Sincerely, Matt Bushak, P.E. Senior Transportation Engineer City of Round Rock Enclosures cc: Reuben Ramirez, Project Manager, City of Round Rock Project File CITY OF ROUND ROCK PUBLIC WORKS DEPARTMENT.3400 Sunrise Road, Round Rock,Texas 78665 (P) 512.218.5555.(F) 512.255.6916.roundrocktexas.gov BID TABULATION THE CITY OF ROUND ROCK Bid Extended By: Matthew Bushak,PE MB Transportation Department Print Name Initials 3400 Sunrise Rd. Bid Opening Date: 3/6/2025 Round Rock, Texas. 78665 Bid Opening Location: 3400 Sunrise Rd,Round Rock,T\ Liquidated Damages: No.of Responses: Project Name:2024 Residential Street Maintenance Program Project Manager: Reuben Ramiro Project ID: Project Consultant: City of Round Rock Project Duration: Bidders Name Lone Star Paving Bennett Paving Alpha Paving Texas Materials Larry Young Paving Contractors Business Location Austin,TX Leander,'1'X Round Rock,TX Cedar Park,Tx College Station,Tx Guarantee:Bid Bond,Cashier Check or Certified Check Yes Yes Yes Yes Yes Statement of Safety Experience,Yes or No Yes Yes Yes Yes Yes Addendum(s)Acknowledged,Yes,No,or N/A N/A N/A N/A N/A N/A APPROX. UNIT I'NIT UNIT UNIT UN17 TEM A ITEM DESCRIPTION QTV. UNIT PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST I Pavement Repair,8"Depth 5324 TON $147.00 $782,628.00 $155.00 $825,220.00 $173.00 $921,052.00 $164.00 $873,136.00 $232.00 $1,235,168.00 2 Remove&Replace Sidewalk 20825 SF 519.00 $395,675.00 $15.00 $312,375.00 $12.00 $249,900.00 $13.50 $281,137.50 $9.35 $194,713.75 3 Remove&Replace Curb&Gutter 6295 LF $81.50 $513,042.50 $40.00 $251,800.00 $73.00 $459,535.00 $77.00 $484,715.00 $77.00 $484,715.00 4 Remove&Replace Driveway 21400 SF $18.50 $395,900.00 $20.00 $428,000.00 $15.00 $321,000.00 $16.00 $342,400.00 $12.90 $276,060.00 5 Remove&Replace Rams 12 IEA $4,625.00 $55,500.00 $1,650.00 $19,800.00 $2,900.00 $34,800.00 $3,000.00 $36,000.00 $2,700.00 $32,400.00 6 Remove&Replace Fillets 1020 SF $20.00 $20,400.00 $21.00 $21,420.00 $16.00 $16,320.00 $17.00 $17,340.00 $86.50 $88,230.00 7 Surface Mill,2" 196283 SY $1.05 $206,097.15 $1.25 $245,353.75 $3.40 $667,363 30 $1.98 $388,640.34 $1.25 $245,353.75 8 Type D HMAC Surface Course 21591 TON 5125.00 $2,698,875.00 $153.00 $3,303,423.00 $126.00 $2,720,466.00 $134.00 $2,893,194.00 $167.00 $3,605,697.00 9 Geogrid 12100 SY $2.50 $30,250.00 57.50 $90,750.00 $4.00 $48,400.00 $7.00 $84,700.00 $6.70 $81,070.00 10 Valve Can Adjustment 20 EA 540.00 $800.00 $25.00 $500.00 5150.00 $3,000.00 $150.00 $3,000.00 $71.00 $1,420.00 11 Manhole Adjustment 187 EA $40.00 $7,480.00 $50.00 $9,350.00 $345.00 $64,515.00 $350.00 $65,450.00 $71.00 $13,277.00 12 REFL PAV MRK TY I(W)6"(SLD)1570 LF $1.00 $1,570.00 $1.60 $2,512.00 $3.50 $5,495.00 $0.98 $1,538.60 $2.10 $3,297.00 100 MIL 13 REFL PAV MRK TY 1(W)12"(SLD) 1000 LF $4.00 $4,000.00 $6.00 $6,000.00 $12.00 $12,000.00 $4.50 $4,500.00 $7.90 $7,900.00 100 MIL 14 REFL PAV MRK TY I(W)24"(SLD) 137 LF $10.00 $1,370.00 $36.00 $4,932.00 $24.00 $3,288.00 $9.15 $1,253.55 $47.50 $6,507.50 100 MIL 15 REFL PAV MRK TY 1(W)8"(SLD)603 LF $1.50 $904.50 $2.00 $1,206.00 $8.00 $4,824.00 $1.30 $783.90 $2.65 $1,597.95 100 MIL 16 REFL PAV MRK TY I(Y)12"(SLD)455 LF $4.00 $1,820.00 $8.40 $3,822.00 $12.00 $5,460.00 $4.50 $2,047.50 $11.00 $5,005.00 100 MIL 17 REFL PAV MRK TY 1(Y)4"(SLD)9845 LF $0.85 $8,368.25 $0.60 $5,907.00 $2.50 $24,612.50 $0.65 $6,399.25 $0.80 $7,876.00 100 MIL 18 REFL PAV MRK TY I(W)(ONLY)7 EA $200.00 $1,400.00 $200.00 $1,400.00 $300.00 $2,100.00 $125.00 $875.00 $263.00 $1,841.00 100 MIL 19 1 REFL PAV MRK TY I (W)5 EA $175.00 $875.00 $400.00 $2,000.00 $275.00 $1,375.00 $95.00 $475.00 $525.50 $2,627.50 ARROW 100 MIL 20 TYPE I-C RPM 284 EA $6.75 $1,917.00 $4.00 $1,136.00 $10.00 $2,840.00 $7.25 52,059.00 $5.25 $1,491.00 21 TYPE II-B-B RPM(HYDRANTS) 96 EA $7.25 $696.00 $20.00 $1,920.00 $12.00 $1,152.00 $7.25 $696.00 $26.25 $2,520.00 22 TYPE 11-A-A RPM 251 EA $6.75 $1,694.25 $8.00 $2,008.00 $10.00 $2,510.00 $9.50 $2,384.50 $10.50 $2,635.50 23 TRAFFIC CONTROL 6 MO $5,000.00 $30,000.00 $2,500.00 $15,000.00 $15,000.00 $90,000.00 $30,000.00 $180,000.00 $10,000.00 $60,000.00 TOTAL: $5,161,262.65 $5,555,834.75 $5,662,006.70 $5,672,725.14 $6,361,402.95 Vif2y� . . F .It � SHEET: 1 of 1 r .............................:.. it MATTHEW BUSHAK j / .............................%...I o`• 91480 a,% (CENS�pG\��i \SS�•.NA1. '� � -.h � ' +'' ;' '� ~i 1'" 1 ,� = T1s 5f.n •_ ._� �_. � � ---'��:� �r °O` +'!' � • `/' � • iii 9w•,.► Zo ' '`.. �.; Z _ sTsc H0Off• ,. , E ACI ' e�. .� ♦ • N I a A �' s Nog•• •� � _ `� -` �y !.`os r ea��, f • •- N' / IF .,vL 4mn Q, O`a� ,J� , � C ,. 1 ► �x �� • tri ',Z �Z•,,r�"-'"' it 0 Sol IPA wa Ar , . iiV��� 'y 1 _ ' • - P`P`PNE�1 '� 20°i' , ' �' � -f ,. � . 4�. I . Y •` FPCPYP `• 1 ♦9_ ��A� �'. ` r• gt EP" �/ r � f'. ,1 a� �,. • � yop .y :�:.A r� W � 4 r Vii' �• _ � `NGN:�'. 1 i �NEVF H m O Pl— r-04-. .� •� �� 40aEst O O v � • i ry SW,E.ETGUMjL•N� y \ At IW ZA D �N �f m.m ✓ .� � � � a n FOE^Y r• ..�.. y.v'C< . .pr. "•y�YJiir�a r. i�l a►-..p 1 y! j• ,lir o � .�! �/� / '� of 1 I c m t s,�i4p n 'J �* Sag _ a T AMA i y y r � �(�WINCHESITrE�P •/ '� l x F LISA RAE DR OP , ' as � .• - .i � �. _ J 2" Mill and OverlayR f ' i ! d