Contract - Jordan Foster Construction - 4/10/2025 Page 1 of 4 _ Contract Quantity Adjustment/Change Order m.OSl2l Department: Transportation Project Name: Kenney Fort Boulevard-Segment 4C Date: 01/15/2025 City Project ID Number: Quantity Adjustment/Change Order No. 4 Vendor: Jordan Foster Construction 15603 IH 35,Pflugerville,TX 78660 (512)990-8313 Company Name Address Phone No. ]ustification The City of Round Rock increased the quantity of concrete median,as well as,added color and pattern to the finish.The quantity adjustments are to true-up the Contract Additional concrete sidewalk was removed and replaced on the north end of the project near the sports complex,removed with concrete curb and replaced with a concrete driveway for maintenance crews at STA 117+00,and removed and replaced with concrete ramps the SW comer of the intersection of Joe DiMaggio Blvd.Additional concrete curb was removed and flexible base,concrete curb,and hot mix asphalt was added to construct the additional lefttum lane at STA 163+50.Additional 18"RC pipe and inlet was added at STA 184+00.Additional manholes at STAB 112+50, 127+00, 137+00,and 183+00. Additional pavement markings,permanent,work zone,and elimination,remove and replace small signs,temporary traffic signals were added as part of the milling and overlaying at the intersections of Joe DiMaggio and Old Settlers Bivds.An existing fire hydrant near STA 117+50 was removed and replaced.One of SUMMARY Amount 0/6 Change Original Contract Price: $18,577,470.14 Previous Quantity Adjustment(s): $312,308.20 1.7% This Quantity Adjustment: $269,848.67 1.511/0 Total Quantity Adjustment(s)To Date: $582,156.87 311% Total Contract Price with Quantity Adjustment(s): $19,159,627.01 Previous Change Order(s): $290,886.95 L5% This Change Order: $289,856.68, 1.5% Total Change Order(s)To Date: $580,743.63; 3.0%6 Adjusted Contract Price: $19,740,370.64 [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)] Difference between Original and Adjusted Contract Prices: $1,162,900.50 Original Contract Time: 372 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan,Adj./Change Order: 0 New Contract Time: 372 Subs iftd1for Appmal Prepared By: �C �""'�' JC Kindel,Senior Project Manger,Jordan Foster Construction 01/1512025 Signature Printed Name,Title,Company Date AppMH815 Jordan Foster Construction,T.ZC _ `� John Goodrich,PE,Executive Vice President 02/12/2025 Contr ctor. - - Signature Printed Name,Title,Company Date City Project Manager. �� � r�) n It1 PM -3- 17-25 i Signature Printed Name,Title 7 Date Mayor/city Manager: r on Mc e Printed ame,r4V I Date Page 2 of 4 gQUyop�(M Contract Quantity Adjustment/Change Order os;a3 Project Name: Kenney Fort Boulevard-Segment 4C Quantity Adj./Change Order No.: 4 Change Order Data Contract Time Adjustment Item# Item Description Unit Quantity Unit Price Amount (Days) C017-01 536-0000 CONC MEDIAN(Color and Pattern) SY 1,473.00 $193.36 $284,819.28 0 C031 01 644-0000 IN SM RD SN SUP&AM TY10 BWG(1)SA EA 5.00 $1,007.48 $5,037.40 0 TOTALS: $289,856.68 0 Page 3 of 4 Contract Quantity Adjustment/Change Order aoutionou i�.�•. ev.05/23 Project Name: Kenney Fort Boulevard-Segment 4C Quantity Adj./Change Order No.: 4 Quantity Adjustment Data ontract Time Adjustment Bid Item# Item Description Unit Quantity Unit Price Amount (Days) 2 104-6015 REMOVING CONC(SIDEWALKS) SY 1,063.00 $10.00 $10,630.00 0 4 104-6021 REMOVING CONC(CURB) LF 530.00 $8.00 $4,240.00 0 11 164-6009 BROADCAST SEED(TEMP)(WARM) SY (12,681.00) $0.18 ($2,282.58) 0 12 164-6011 BROADCAST SEED(TEMP)(COOL) SY (12,153.00) $0.18 ($2,187.54) 0 14 POS 366 FL BS(CMP IN PCL)(TY A GR 5)(FNAL C, 215.00 $53.00 $11,395.00 0 15 310-6027 PRIME COAT(MC-30 OR AE-P) GAL (1,831.80) $5.00 ($9,159.00) 0 42 464-6003 RC PIPE(CL III)(18 IN) LF 148.00 $87.00 $12,876.00 0 46 465-6002 MANH(COMPL)(PRM)(48 IN) EA 1.00 $7,200.00 $7,200.00 0 47 465-6003 MANH(COMPL)(PRM)(60 IN) EA 1.00 $8,700.00 $8,700.00 0 48 465-6004 MANH(COMPL)(PRM)(72 IN) EA 2.00 $12,000.00 $24,000.00 0 50 465-6016 INLET(COMPL)(PCO)(3FT)(BOTH) EA 1.00 $8,900.00 $8,900.00 0 52 465-6149 INLET(COMPL)(PAID)(SL)(3FTX3FT) EA (1.00) $6,000.00 ($6,000.00) 0 53 465-6557 INLET(CURB)(SPL) EA (2.00) $7,000.00 ($14,000.00) 0 60 S02-6001 BARRICADES,SIGNS,AND TRAFFIC MO 700 $3,400.00 $23,800.00 0 HANDLING 61 506-6002 ROCK FILTER DAMS(INSTALL)(TY 2) LF 30.00 $32.00 $%0.00 0 62 506-6003 ROCK FILTER DAMS(INSTALL)(TY 3) LF 11.00 $50.00 $550.00 0 63 506-6011 ROCK FILTER DAMS(REMOVE) LF 41.00 $6.30 $258.30 0 64 506-6020 CONSTRUCTION EXITS(INSTALL)(TY 1) SY (598.00) $4.20 ($2,511.60) 0 65 506-6024 CONSTRUCTION EXITS(REMOVE) SY (598.00) $2.10 ($1,255.80) 0 69 5086^6042 BIODEG EROSN CONT LOGS(INSTL) LF (64.00) $11.00 ($704.00) 0 70 506-6043 EROSN CONT LOGS(REMOVE) LF (64.00) $2.20 ($140.80) 0 73 530-6004 DRIVEWAYS(CONC) SY 250.00 $102.00 $25,500.00 0 74 531-6001 CONC SIDEWALKS (4-) SY 416.00 $78.00 $32,448.00 0 75 531-6010 CURB RAMPS(TY 7) EA 4.00 $2,900.00 $11,600.00 0 76 536-6002 CONC MEDIAN SY (7.00) $320.00 ($2,240.00) 0 85 618-6046 CONDT(PVC)(SCH 80)(2-) LF 179.00 $14.50 $2,595.50 0 86 [618-6054 18-6047 CONDT(PVC)(SCH 80)(2")(BORE) LF (115.00) $68.00 ($7,820.00) 0 PRESSURE GROUT CONRETE CONDT(PVC)(SCH 80)(3")(BORE) LF (345.00) $79.00 ($27,255.00) 0 PRESSURE GROUT CONRETE 93 21-6002 TRAY CABLE(3 CONDR)(12 AWG) LF 139.00 $1.70 $236.30 0 Page 4 of 4 Contract Quantity Adjustment/Change Order aouNo aocK uxn•. ev.05/23 94 624-6002 GROUND BOX TY A(122311)W/APPRON EA 1.00 $1,160.00 $1,160.00 0 97 628-6002 REMOVE ELECTRICAL SERVICES EA (1.00) $580.00 ($580.00) 0 99 644-6001 IN SM RD SN SUP&AM TY10 BWG(1)SA EA 7,00 $820.00 $5,740.00 0 100 644-6076 REMOVE SM RD SN EA 1.00 $110.00 $110.00 0 102 666-6006 REFL PAV MRK TY I(W)4"(SLD) LF 9.00 $3.70 $33.30 0 100MIL 103 666-6036 REFL PAV MRK TY I(W)8"(SLD) LF 435.00 $7.40 $3,219.00 0 100MI1 104 666-6042 REFL PAV MRK TY I(W)12"(SLD) LF 741.00 $2.10 $1,556.10 0 100MIL 105 666-6054 REFL PAV MRK TY I(W)(ARROW) 5.00 $2.10 $10.50 0 (100 MIL) 106 666-6078 REFL PAV MRK TY I(W)(WORD) EA 4.00 $195.00 $780.00 0 100MIL 107 666-6099 REFL PAV MRK TY I(W)18"(YLD TRI) EA 8.00 $235.00 $1,880.00 0 100 MIL 108 666-6126 REFL PAV MRK TY I(Y)4"(SLD)(100 LF 788.00 $80.00 $63,040.00 0 109 672-6007 REFL PAV MRKR TY I-C EA 8.00 $7.10 $56.80 0 110 672-6009 REFL PAV MRKR TY II-A-A EA 28.00 $7.10 $198.80 0 123 684-6046 TRF SIG CBL(TY A)(14 AWG)(20 LF 197.00 $5.00 $985.00 0 CONDR 124 684-6080 TRF SIG CBL(TY C)(14 AWG)(2 CONDR) LF 364.00 $1.00 $364.00 0 128 688-6001 PED DETECH PUSH BUTTON(APS) EA 2.00 $890.00 $1,780.00 0 149 3076-6001 D-GR HMA TY-B PG64-22 TON (886.46) $104.00 ($92,191.84) 0 150 3076-6009 D-GR HMA TY-C PG70-22 TON 789.76 $135.00 $106,617.60 0 151 CORR 501 JACKING OR BORING 42-IN STEEL PIPE, LF 20.00 $875.00 $17,500.00 0 1/2-INCH THICK 168 CORR 511 VALVE(GATE TYPE)(24-IN DIA) EA 1.00 $30,000.00 $30,000.00 0 171 CORR 511 FIRE HYDRANTS EA 1.00 $5,000.00 $5,000.00 0 180 512-6009 PORT CTB(FURN&INST)(LOW PROF) LF 120.00 $19.08 $2,289.60 0 182 512-6057 PORT CTB(REMOVE)(LOW PROF) LF 120.00 $19.08 $2,289.60 0 188 662-6060 WK ZN PAV MRK REMOV(W)4"(BRK) LF (32.00) $5.30 ($169.60) 0 189 662-6063 WK ZN PAV MRK REMOV(W)4"(SLD) LF (3,550.00) $1.06 ($3,763.00) 0 190 662-6095 WK ZN PAV MRK REMOV(Y)4"(SLD) LF 2,103.00 $3.71 $7,802.13 0 192 677-6001 ELIM EXT PAV MRK&MRKRS(4") LF (3,025.00) $0.58 ($1,754.50) 0 193 677-6007 ELIM EXT PAV MRK&MRKRS(24") LF (60.00) $3.18 ($190.80) 0 194 677-6008 ELIM EXT PAV MRK&MRKRS(ARROW) EA (5.00) $106.05 ($530.25) 0 195 677-6012 ELIM EXT PAV MRK&MRKRS(WORD) EA (5.00) $185.59 ($927.95) 0 202 681-0000 TEMP TRAF SIGNALS EA 1.00 $4,029.90 $4,029.90 0 203 686-0000 REMOVE SIGNAL POLE ASSEMBLY EA 2.00 $1,590.75 $3,181.50 0 TOTALS: $269,848.67 0