Loading...
CM-2025-102 - 4/18/2025 Mayor Councilmembers City Manager Craig Morgan Michelle Ly Brooks Bennett Rene Flores Melissa Fleming ROUND ROCK TEXAS Mayor Pro-Tem Frank Ortega City Attorney ADMINISTRATION Kristin Stevens Hilda Montgomery Stephanie L.Sandre Texas Government Code Section 2269.056(a) requires the "governing body of a governmental entity that considers a construction contract using a method authorized by this chapter other than competitive bidding must, before advertising, determine which method provides the best value for the governmental entity. Pursuant to Section 2269.053,the Round Rock City Council delegated its authority to determine whether an alternative project delivery method provides the best value to the municipality to the City Manager by Resolution No. 2024-274. The City of Round Rock desires to use an alternative method other than competitive bidding when entering into a contract for the Cycle 4 - Basins 1 and 2 Wastewater Main Rehabi ("Project"). Chapter 2269 requires that a project-by-project determination be made as to what method provides the best value for the governmental entity in relation to a particular project. The City Manager has determined that the Project would be best served by utilizing the Competitive Sealed Proposal method. Legislative No.CM-2025-102 Requester: Michael Thane Request Date:04/11/2025 �66 _ Brooks Bennett,City Manager Date Approved:04/21/2025 CITY OF ROUND ROCK 221 East Main Street, Round Rock,Texas 78664 [P] 512.218.5401 • [F] 512.218.7097.roundrocktexas.gov s 3pit) City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider determining that"Competitive Sealed Proposal"is the delivery method which provides the best value for the Cycle 4-Basins 1 and 2 Wastewater Main Rehabilitation Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/18/2025 Dept Director: Director of Public Works, Michael Thane Cost: Indexes: Self-Financed Wastewater Construction Attachments: Alt. Delivery Method, MAP, LAF Department: Public Works Text of Legislative File CM-2025-102 The City is required to evaluate the wastewater system inside the Edwards Aquifer recharge zone every five years to comply with the Texas Commission on Environmental Quality requirements.The elimination of defects inside the Edwards Aquifer recharge zone will not only help to protect the Edwards Aquifer but will reduce inflow and infiltration entering the City's wastewater collection system,thereby reducing the City's treatment cost.Approximately 60%of the City is located over the Edwards Aquifer.The City has divided this area up into five basins with numerous sub-basins.The City has recently completed the inspection and design to rehabilitate the defects within basins one and two. This request is for the approval to use a Competitive Sealed Proposal (CSP) procurement method.Aspects of the project will require methodical and careful coordination with nearby schools, Georgetown Railroad,Texas Crushed Stone, and The Transportation Division to perform the rehabilitation work at the optimum time with proper traffic control and bypass pumping. Parts of the rehabilitation work will occur along Old Settlers Boulevard and Settlement Drive. Both have deep wastewater pipes (approximately 20 feet deep),which require additional precautions. Due to the complex nature of the project,the Public Works Department requests approval to use CSP.The CSP method will allow the project team to evaluate contractors on qualifications and cost, ensuring the selection of a qualified contractor to perform the work and provide the best overall value to the City of Round Rock. City of Round Rock Page 1 of 2 • • Agenda Item Summary Continued(CM-2025-102) Cost:NA Source of Funds:Self-Financed Wastewater Construction City of Round Rock Page 2 of 2 Edwards Aquifer Recharge Zone Cycle 4 - Basins 1 and 2 Wastewater Main Rehabilitation ROUND ROCI( • N Terravista N 1 2 . . Golf Club A 1 z . SLia. a Conser Sery et -P•• ' , * 1:14, ,,4,31 CC•'o- ,,„.:..'.,_.. •r. • ��d � Round •ock Sit e :eseji, ,,: II A, 4411 14,,-.-\..1.,1.26r. diii iiii k ..i Highe 1� omplex ' Read y Basin-2 ., m . m ro E \ ;S E Old l! Basin 1 «',F K = 03 D m > 7 17 m a > °1 m "de- /GC m r` 1 E _J 0 / )Iiii J a) . GI t r,r, er 1 1 I I 111 4 ' y a 1 Ifi•er TOCha,dl:rCre --_,`- •rk 1 C 1 ' A.', pre)11111$ .1 rf ` •r. , I 1 3.Igh , r r,PnJCI! _ tc , rT , V.IIICIMMIIIIII T424 11 V