Loading...
CM-2014-443 - 6/20/2014City of Round Rock ,ROUND ROCK TEXAS PUPP03. fl1S510li PQOSPERIIY Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Raba Kistner Consultants, Inc. for the Reuse Water Transmission Main - Phase IV -13 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/20/2014 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $349.80 Indexes: Self -Financed Water Construction Attachments: SCNo.1 Raba ReuselV6 CM6.20.14 Department: Utilities and Environmental Services Text of Legislative File CM -2014-443 This project continues the City's efforts to provide reuse water to the developing Northeast area of Round Rock. The City hired HDR Engineering, Inc. for the design and construction phase services for Phase IV -13 of the Reuse Waterline Improvements Project. The project includes the construction of a 1.25 million gallon Elevated Water Storage Tank and the extension of the Reuse Waterline. The waterline starts at the elevated tank and extends 900 feet to the east to meet Phase IV -A, currently in design by Baker-Aiklen. The tank will provide 1.25 million gallons of elevated storage capacity for the Reuse Water System to help control pressure in the system. The City engaged in a contract with Raba Kistner Consultants, Inc. to take samples, perform laboratory tests, and evaluate the concrete quality as specified by the Engineer in the Contract Documents. Raba Kistner was chosen by the Utility Staff because of their past record of being prompt, precise and requesting the most reasonable fees for the services needed. The project required an additional set of concrete tests that was not foreseen in the original scope. This additional work was performed by Raba Kistner between the dates of April 8th and May 24th of this year. Please authorize Supplemental Contract No. 1 in the amount of $349.80. Staff recommends approval. Cityo(Round Rock Page 1 Printed on 611912014 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Utilities & Environmental Services Project Mgr/Resource: Jeff Bell Council Action: ORDINANCE Agenda Wording xx City Manager Approval Project Name: Reuse Water Transmission Main - Phase IV -B ContractorNendor: Raba Kistner Consultants, Inc_ RESOLUTION UIVIA woraing Consider executing Supplemental Contract No.1 with Raba Kistner Consultants, Inc. for the Reuse Water Transmission Main - Phase IV -B Project. Attorney Approval Attorney Notes/Comments Date 6, ' 1 0:lwdoxlSCClntsl0199113361MISC100304490.XLS Updated 6/3/08 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: RABA ICISTNER CONSULTANTS, INC. ("Engineer") ADDRESS: 8100 Cameron Road Suite B-150 Austin TX 78754 PROJECT: Reuse Water Transmission Main — Phase IV -B This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Raba Kistner Consultants, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 12th day of July, 2013 for the Reuse Water Transmission Main — Phase IV -B Project in the amount of $6,887.10; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $349.80 to a total of $7,236.90; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 4 Compensation and Exhibit D Fee Schedule shall be amended by increasing by $319.80 the lump sum amount payable under the Contract for a total of $7,236.90, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.1336;00305067 CM -2014-443 Rcv.12/01/08 84275 RABA KYSTNER CONSULTANTS, INC. B r• (C -)I ►► ►4 Date ClT;Y,OF R. r,iROCK Alan4r.G;-ffm" „.yor •�a • / ,cap• 06 Date Supplemental Contract 0199.1336;00305067 4PVED ST FORM: l. Sheets, City Attorney Rev. 12/01/08 84275 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page � 0 r � 0 VISIT OUR WEBSITE AT: INVOICE INVOICE #:A025576 www.rkci.com CONSULTANTS * ENVIRONMENTAL FACILITIES INFRASTRUCTURE BILLING DATE: PROJECT: AAD1303800 5/30/2014 Reuse Water Transmission Main, Phas CLIENT: A09352 PAD13-083-00 City of Round Rock Jeff Bell City of Round Rock 2008 Enterprise Dr Round Rock, TX 78664 CONSULTING SERVICES INVOICE SUMMARY INFORMATION �1 KIS TNER REMITTANCE ADDRESS: RABA KISTNER, INC. P.O. BOX 971037 DALLAS, TX 75397-1037 PHONE (512) 339-1745 FOR PROFESSIONAL SERVICES RENDERED THROUGH: 5/24/2014 REPORT/ DATE ASSIGNMENT SERVICE CODE QUANTITY 04/08/2014 A14-012187 A14-012187 A14-012187 TECHNICIAN TIME 3Q010 3.00 CONCRETE CYLINDER 3QFXE 4.00 VEHICLE TRAVEL 3RT99 1.00 CHARGE 04/09/2014 A14-012275 VEHICLE TRAVEL CHARGE A14-012275 TECHNICIAN TIME cylinder pick up 05/24/2014 REPORT PREPARATION/MAILIN G Authorization Amount $7,455.80 Amount Previously Billed $7,106.00 Amount This Invoice $349.80 Total Billed to Date $7,455.80 Amount Remaining $- Percent Billed 100.00% 3RT99 1.00 3Q010 2.00 3Z111 31.80 RATE UNIT 42.00 /HR 12.00 /EA 30.00 /TRIP SUBTOTAL 30.00 !TRIP 42.00 /HR SUBTOTAL 1.00 /AMT l Q0.uu 48.00 30.00 30.00 84.00 114.00 31.80 SUBTOTAL 31.80 SUBTOTAL INVOICE * 349.80 AMOUNT DUE THIS INVOICE ** 349.80 * Invoices are submitted monthly and are due on receipt. * Carrying charges may be assessed on invoices unpaid beyond 30 days from billing date. AP May -14 -PLEASE PAY FROM THIS INVOICE.