Loading...
GM-2025-113 - 2/14/2025GM-2025-113 IN WITNESS WHEREOF,BCRUA and the Engineer have executed this Supplemental Contract in duplicate. WALKER PARTN RS Byfm: A n A ch r Vice President 02/14/25 Date 2 BRUSHY CREEK REGIONAL UTILITY AUTHORITY,INC. By. —Awl 4�� Sam Roberts,General Manager 02/14/2025 Date APPRO V D S TO FO By: Stephan . Sheets,BCRUA Attorney 3 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purpose of Supplemental Amendment No. 3 is to capture additional design services associated with expanding the disinfection basin to build-out(Phase 3 of the site phasing plan)identified during the development of the 90%design submittal. BASIC SCOPE OF SERVICES Task 1.0-Design Additional Services 1.1 Expand disinfection basin to build-out(Phase 3 of the site phasing plan). 1.1.1 Structural design of expanded disinfection basin with baffles, sumps, vents, and access hatches. 1.1.2 Process mechanical design of expanded disinfection basin, baffle configuration, and adjustable weirs. 1.1.3 Grading adjustments to adjacent drainage channel. 1.1.4 Update CT study to reflect expanded disinfection basin configuration. (LOAAWAer Partners 1/28/2025 engineers i surveyors ADDENDUM TO EXHIBIT C WORK SCHEDULE The assumed that the additional services in this amendment will be included in Phase 2A project with no impact to the project schedule. QWalker Partners 1/28/2025 engineers I surveyors ADDENDUM TO EXHIBIT D FEE SCHEDULE Attached Behind This Page ADDENDUM TO EXHIBIT D COMPENSATION Total compensation for services under Supplemental Contract No. 3 is estimated to be $15,444 as shown below. Owner shall pay Engineer for Basic Services set forth in Exhibit B on the basis of Lump Sum as described in Paragraph 1.0 of the Agreement dated September 27, 2023. Total compensation for the Project shall be adjusted from$3,561,144 to$3,576,588. Brushy Creek Regional Utility Authority(SCRUA)•Supplemental Amendment No.3 Project Fee Summary Phase 2A Water Treatment Plant Expansion Basic Services MAO 1/2812028 Special Services Detailed Cost Breakdown Total Pra ect 515.444 Basic and 3 eclat Services Employee Archerk290 mrbtedneroa,bei Deme aneke Total Total LaborTotal Total Sub Total Position RoieotBader Recess Rebeee Benke Go Expense Task MeneoerBower def Hours Effort Effort Effort Effort Tasks 1 Current Hourly BM Rate-+ 290 187 178 1.0 Design Additional Services 1 4 4 16 26 S 5,316 S - S 10,128 S 15,444 Total Basic and S ectal Servlees Hours 1 r---4.r--4 16 26 E 6,316 E S 10,128 $ 16444 Total Basic and Special Services Labor Etta $ 350 $ 2901$ 1,180 $ 6681$ 2,8481 QWalker Partners 1/28/2025 engineers I surveyors