BCRUA-2024-013 - 6/26/20246e7ZBRUSHYCREEK
REGIONAL UTILITY AUTHOR"
A P,rsn, r. h.p of Cedar P,rk La, nd, r. ..,d Ruune k . , h
SUPPLEMENTAL CONTRACT NO.1
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: WALKER PARTNERS ("Engineer")
ADDRESS: 6504 Bridge Point Parkway, Suite 200, Austin, TX 78730
PROJECT: BCRUA Raw Water Pipeline Phase One — Contract 2
This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between
the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA"
and Walker Partners, hereinafter called the "Engineer."
WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract," on the 4th day of May, 2023 for the BCRUA Raw Water Pipeline Phase
One Contract 2 Project in the amount of $49,201.00; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope
of services and to increase the compensation by $75,000.00 to a total of $124,201.00;
NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is
amended as follows:
I.
Article 2, En ing eering Services and Exhibit A, Engineering Services shall be amended as set forth
in the attached Addendum To Exhibit A.
II.
Article_ 4, Compensation and Exhibit B. Fee Schedule shall be amended by increasing by
$75,000.00 the lump sum amount payable under the Contract for a total of $124,201.00, as shown
by the attached Addendum to Exhibit B.
IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract
in duplicate.
[signature pages follow]
supplemental Contract Rev. 03'201 l
0140.4634-62;48714534-5079 215829
WAUronvAr6her,
RS
By:
"Vice President
06/18/2024
Date
BRUSHY i .REEK REGION UTILITY AUTHORITY, INC.
By:
Rene I gores, BCRUA Pr id nt
G,(. lz-u�
Date
APPROVE A TO FORM:
By;
Stephan L. heets, BCRUA Attorney
ADDENDUM TO EXHIBIT A
ENGINEERING SERVICES
BASIC SCOPE OF SERVICES
1.1 Project Administration. Manage and coordinate staff resources and project planning and
prepare monthly invoices.
1.2 Project Meetings. Coordinate and attend meetings with Owner and Owner's legal counsel
as required.
1.3 Litigation Support Services.
1.3.1 Respond to production requests during the pre-trial discover process. Information
will be assembled and provided as required by civil procedure. Such information
may include but is not limited to technical design calculations and drawings,
communication and correspondence, and supporting documentation.
1.3.2 Review materials prepared by other parties in the case and prepare responses as
required.
1.3.3 Assist in the development of a direct examination case.
1.3.4 Develop exhibits offered at the hearing as required by Owner's legal counsel.
1.3.5 Prepare for and deliver oral depositions and review deposition transcripts.
1.3.6 Prepare for and provide testimony at a judicial proceeding as a consultant or
witness if required.
6/12/2024 Walker Partners
engineers * surveyors
ADDENDUM TO EXHIBIT B
FEE SCHEDULE
Total compensation for services under Supplemental Amendment No. 1 is estimated to be $75,000.
OWNER shall pay ENGINEER on the basis of Standard Hourly Rates. Total compensation for the
Project shall be adjusted to $124,201.
6/12/2024 Walker Partners
engineers * surveyors