R-2025-114 - 5/8/2025 RESOLUTION NO. R-2025-114
WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with
Braun and Butler Construction, Inc. for the Griffith Remodel and Paseo Project, and
WHEREAS, the Council has determined that it is necessary to make adjustments/changes to
the quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 1 to the Contract with Braun and Butler Construction, Inc. for the
Griffith Remodel and Paseo Project, a copy of said quantity adjustment/change order being attached
hereto as Exhibit"A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 8th day of May, 2025.
C G MO AN, Mayor
Cit of Ro d Rock,Texas
ATTEST:
- �;�Jl
AN FRANKLIN, City Clerk
0112.20252:4913-5463-8394
EXHIBIT
n A„ Page t of 1
00
Contract Quantity Adjustment/Change Order
■a,w.m
rVv,01 16
Department: General Services
Project
Name: Griffith Remodel and Paseo Project Date: 4/4/25
City Project Change Order/Quantity
ID Number Adjustment No. 1
Vendor Braun and Bulter Construction Inc. 300 Hazelwood Street, Suite 100, Leander TX 78641 512-837 2882
Company Name Address Phone No
Justification
Replace and repair 19 windows identified during construction as failing.During construction windows along the South and Cast side of the
building were discovered to be leaking causing mold in the walls of the structure.This change order Is to replace the windows with like shape
to maintain the historical appearance but address the failing window seals,caulking,flashing,and waterproofing.
SUMMARY Amount %Change
Original Contract Price:
$15,03!,728.00
Previous Quantity Adjustment(s):
This Quantity Adjustment: $0.00
Total Quantity Adjustment(s): $0.00
Total Contract Price with Quantity Adjustment(s): $15,031,728.00
Previous Change Order(5): $0.00 0%
This Change Order: $303,932.00 2%
Total Change Order(s)To Date: $303,932.00 2%
Adjusted Contract Price [Original Contract Pace Plus
Quantity Adjustment(s)Plus Change Order(s)j: $15,335,660.00
Difference between Original and Adjusted Contract Prices. $303,932.00
Original Contract Time: 518
Time Adjustment by previous Quan.Adj./Change Order: 0
Time Adjustment by this Quan.Add./Change Order: 0
New Contract Time: 518
Prepared By: Richard Will,Building Construction Manager, City of Round Rock Yzy j-zgiL
Signature Printed Name,Title,Company Date
Architect: Andrew Green,Associate,McKinney York Architects 04/04/2025
ure Printed Name,Title,Company Date
Contractor: i22)r_ , IIs, ( ,r gorlx�—
ignature Printed Name,Title,Company Date
City Project n /,
Manager_ _ C bl'L C"1 A r^i cl dnG/ (h 2
Signature Printed Namb,Title Date
Mayor/City
Manager
Signature Printed Name,Title Date
Page 2 of.1
Contract Quantity Adjustment/Change Order
Project Name: Griffith Remodel and Paseo Project
Quan.Adj./Change Order No.: 1
Change Order Data
Contract
Time
Item it Item Description UnitUnit Price Amount Adjustment(Daws)
19 Windows and Flashing 1 1 $303,932.00
0
$0.00
- --- - .
0.00
00
00
00
0.00
0.00
0.00
.00
0.00
0.00
0.00
.00
Job Name: Griffith &Paseo 1979 Windows&Masonry
10 Date: 1/14/2025 Tooth-out Masonry
Braun&Butter
C'(?N FT Rif'-T1C7N
Miscellaneous Labor Material Total
Mhrs Qty Unit UP Amount UP Amount UP Amount
0
1 General Conditions 0
Front End Plan Work 1 Is 3,250 3250 3,250
Senior Project Manager 0 wk 850 0 0
Project Manager 0 wk 1,8501 0 1 0
Truck Expense 0 wk 275 0 1 0
Superintendent 4 wk 3,950 15800 15,800
Truck Expense 4 wk 500 2000 2,000
Interim Cleanup Labor 48 mhrs 32 1536 1,536
Project Office Clerical Support 4 wk 800 3200 3,200
0
Job Office Supplies 0 mo 100 0 1 0
Telephone/Computer Service 21 mo 9501 1,900 1,900
Drinking Water 0 mo 150 0 0
Plan Re.production 0 Is 250 0 0
Dum sten Service 8 ea 950 7,600 7,600
Chemical Toilet each 0 mo 425 0 0
Rentals 1 Is 3,000 3,000 3,000
0
0
1.0 Allowances 0
contractor's contingency 20,000 20,000
0
DIV 2-EXISTING CONDITIONS 0
0
2.40 Masonry Removal &Abatement 35,820 35,820
Tooth out T around window locations
0
2.50 Existing Concealed:Microbial-Remediation 38,130 38,130
0
DIV 4-MASONRY 0
0
4.0 Masonry Reinstallation 30,560 30,560
0
DIV 5-METALS 0
0
5.50 Metal Fabrications lintels 10,799 10,799
a
DIV 6-WOOD,PLASTICS,COMPOSITES 0
0
6.101 Rough Carpentry for Masonry support 3,000 3,000
Opening Coverings after removal 3,000 3,000
0
6.20 Finish Carpentry window sills 5,000 5,000
0
DIV 7-THERMAL&MOISTURE PROTECTION 0
0
7.10 Damp proofingand Waterproofing 7,200 7,200
0
7.60 Flashing and Sheet Metal 12,500 12,500
1979 Proposal Summary 1.14.25-Tooth-out masonry Takeoff Summary
Job Name: Griffith&Paseo 1979 Windows& Masonry
,a Date: 1/14/2025 Tooth-out Masonry
Braun&Butler
CONYTRVf TION
Miscellaneous Labor Material Total
Mhrs Qty Unit UP Amount UP Amount UP Amount
0
7.90 Interior Joint Protection 8,280 8,280
— 0
DIV 8-OPENINGS 0
0
8.50 Windows 0 0
New Window Material Installation 58,253 58,253
0
DIV 9-FINISHES 0
0
9.10 Blocking,Sheathing, Drywall, Comerbead 5,000 5,000
0
9.90 Paint&Coatings lintels 2,500 2,500
0
0
Temporary Fence 250 If 9 2,250 2,250
Traffic Control Plan &Devices 1 Is 3,500 3,500
0
Project Insurance 3,590 3,590
0
0
SUBTOTAL 25,786
CM Fee 375%r 10,788
Total Before Bond 298,455
Bond Cost es=1 1 5,477
Sales tax on Material 1 0.00 0
Sales tax on Total 0.00%
SUMMARY TOTAL 303,932
1979 Proposal Summary 1 14.25-Tooth-out masonry Takeoff Summary