Loading...
CM-2025-151 - 6/6/2025 Construction Change Order Department: Community Development Block Grant Page: 1 of 1 Program Home Repair Program Date: 5.7.2025 Change Order No 2 Location 603 Burleson Cove Original Contract: $ 23,706.00 Homeowner: Robert Urda Justification: Original Contract Price $23,706.00 Remove and replace rutted base plate This Change Order $1,180.00 and 8'of top plate at left side of house. Change Orders to Date: $2,710.00 Install pressure treated 2x4 cut around foundation bolts and re-secure in place. Maximum Change Order Allowed$amount $5,926 50 Screw top plate in place.Install Balance available $4,936.50 blocking at damaged studs.2 ea. Change Data (-)or" - - - " Item# (+) _ Description of Changes Unit _ QTY Unit Price Amount Days+/- Remove and replace rotted base plate and 8'of top plate at left side of house. Install pressure treated 2x4 cut around foundation bolts and re-secure in place. Screw top plate in place Install 1 (+) blocking at damaged studs. 2 ea. EA 1 $1,180.00 $1,180.00 2 (+) $1,180.00_ 2 141.c/Atuttf— � Percent of Original Contract Price 5.00% -S Maximum%allowed 25.00% Project f� er a t This Change Order 5.00% B&O C structio Cotr t Total%Change 11.50% By Paul Fam -D.7.2025 TheOwner Date Contract+Chan_ge/Orrdd�erss: $26,416.00 ipz4,,iii 45 1� Approved. �, ��/.r �` ,_. Homeowner Date nue nett. r Date c/C �) AO (.1 ink Homeowner Date CDea Fonn toms 1 of 1 5/8/2025 CPI— 2 2-5— 61