CM-2025-151 - 6/6/2025 Construction Change Order
Department: Community Development Block Grant Page: 1 of 1
Program Home Repair Program Date: 5.7.2025
Change Order No 2
Location 603 Burleson Cove Original Contract: $ 23,706.00
Homeowner: Robert Urda Justification:
Original Contract Price $23,706.00 Remove and replace rutted base plate
This Change Order $1,180.00 and 8'of top plate at left side of house.
Change Orders to Date: $2,710.00 Install pressure treated 2x4 cut around
foundation bolts and re-secure in place.
Maximum Change Order Allowed$amount $5,926 50 Screw top plate in place.Install
Balance available $4,936.50 blocking at damaged studs.2 ea.
Change Data
(-)or" - - - "
Item# (+) _ Description of Changes Unit _ QTY Unit Price Amount Days+/-
Remove and replace rotted base plate
and 8'of top plate at left side of house.
Install pressure treated 2x4 cut around
foundation bolts and re-secure in place.
Screw top plate in place Install
1 (+) blocking at damaged studs. 2 ea. EA 1 $1,180.00 $1,180.00 2
(+)
$1,180.00_ 2
141.c/Atuttf— � Percent of Original Contract Price 5.00%
-S Maximum%allowed 25.00%
Project f� er a
t This Change Order 5.00%
B&O C structio
Cotr t
Total%Change 11.50%
By Paul Fam -D.7.2025
TheOwner Date Contract+Chan_ge/Orrdd�erss: $26,416.00
ipz4,,iii
45
1� Approved. �, ��/.r �` ,_.
Homeowner Date nue nett. r
Date c/C �) AO (.1 ink
Homeowner Date CDea Fonn toms
1 of 1 5/8/2025
CPI— 2 2-5— 61