Loading...
BCRUA-2025-015 - 6/25/2025 Exhibit A BCRUA Budget Proposed Cedar Park Leander Round Rock FY 2026 FY26 Operating Budget $7,179,092 $781,518 $3,871,727 $2,525,846 FY26 Debt Service Budget $30,790,826 $6,309,966 $15,805,316 $8,675,544 Total Operating and Debt Service Budget $37,969,915 $7,091,484 $19,677,042 $11,201,390 BCRUA FY 2026 Capital Projects Budget Construction Total Project Project Description Soft Cost Cost Cost(Budget) Phase 2 Raw Water Raw Water Intake,Tunnel,Pump 1 $65,428,000 $258,487,000 $323,915,000 Delivery System Station and Transmission Line Phase 1D WTP Expansion WTP expansion from 32.5 MGD to $2,863,000 $18,746,400 $21,609,400 42 MGD Upgrades at water delivery points Delivery Points Ph 1&2 $762,000 $2,053,000 $2,815,000 to cities for improved flow control 2 WTP expansion from 42 MGD to Phase 2A WTP Expansion 64 MGD $13,325,000 $125,000,000 $138,325,000 Barge decommission& Contingency plan if Lake Travis 3 drops to El 623. $300,000 $2,700,000 $3,000,000 recommission P 1-Ph 2 includes prelim/final design,land rights,PEC power projects,CMT,constr phase svcs,construction 2-Cost data from 2025 SWIFT application 3-Funding source TBD if project becomes necessary Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V3.5.1.9b4369cc Cu11 -2cl6 - 015