R-2025-162 - 6/26/2025 RESOLUTION NO. R-2025-162 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Capital Excavation Company for the Wyoming Springs Segment 1Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Capital Excavation Company for the Wyoming Springs Segment 1Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of June, 2025. CRAA MOR9(0, Mayor City of Rou Oock, Texas ATTEST: Q.4,,,,.&, ANI<FRANKLIN, City Clerk 0112.20252;4925-5783-0990 EXHIBIT Page 1 of 3 A Contract Quantity Adjustment/Change Order reouNaaoatxn; rev,01/16 Department: Project Name: Wyoming Springs Date: 5/1/25 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Capital Excavation 2967 Business Park Dr, Buda,TX 512-440-1717 Company Name Address Phone No. Justification Adding items for ATMOS gas line cover, 30"waterline split restraints,8"waterline wet connect and curb inlet modification. These items were not included in the original bid estimate. Added items for the Brushy Creek Bridge redesign to alleviate dead loads and prolong the life of the bridge while maintaining aesthetic appeal. Added item for C153 Fittings Credit,switched from C110 fittings to C153 to shorten lead times and reduce cost. SUMMARY Amount %Change Original Contract Price: $25,917,630.47 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $130,471.00 Total Quantity Adjustment(s): $130,471.00 Total Contract Price with Quantity Adjustment(s): $26,048,101.47 Previous Change Order(s): 0% This Change Order: $329,947.50 1% Total Change Order(s)To Date: $329,947.50 1% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $26,378,048.97 Difference between Original and Adjusted Contract Prices: $460,418.50 Original Contract Time: 450 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 450 Submitted far App"! Prepared By: Joshua LittleJoshua Little, Sr. Project Manager 5/1/25 Signature Printed Name,Title,Company Date Approvals oe chesne `g�, Contractor: ) y � �� Joe Chesney,VP Operations 5/1/25 Signature Printed Name,Title,Company Date City Project ?MMa"�pe� Gerald Pohlmeyer 05/28/2025 Manager: Signature VPrinted Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order It NOO[TEXAS rev,01/16 Project Name: Wyoming Springs Quan.Adj./Change Order No.: 1 Chan a Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) Atmos Gas Cap CY 116.5 $1,468.00 $171,021.56 C153 Fittings Credit LS 1 -$22,178.06 -$22,178.06 Brushy Creek Bridge Redesign LS 1 $96,642.00 $96,642.00 30"Split Bell Joint Restraints EA 4 $7,100.00 $28,400.00 Cap Exc Accelertation Crew for 30" Waterline LS 1 $23,665.00 $23,670.00 Multi Inlet Connection,Curb Inlets EA 15 $1,574.00 $23,610.00 8"Wet Connect EA 1 $8,782.00 $8,782.00 TOTALS: $329,947.50 0 Page 3 of 3 Contract Quantity Adjustment/Change Order RDUNO NOO[rExP'� rev,01/16 Project Name: Wyoming Springs Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount Ductile Iron Fittings TN 3.19 $40,900.00 $130,471.00 -- TOTALS:J $130,471.0010