Contract - Capital Excavation Company - 6/26/2025 Page 1 of 3
NOVND NOG(iexa, Contract Quantity Adjustment/Change Order
rev,01/16
Department:
Project
Name: Wyoming Springs Date: 5/1/25
City Project Change Order/Quantity
ID Number Adjustment No. i
Vendor Capital Excavation 2967 Business Park Dr, Buda,TX 512-440-1717
Company Name Address Phone No.
justification
Adding items for ATMOS gas line cover, 30"waterline split restraints, 8"waterline wet connect and curb inlet modification. These items were
not included in the original bid estimate. Added items for the Brushy Creek Bridge redesign to alleviate dead loads and prolong the life of the
bridge while maintaining aesthetic appeal. Added item for C153 Fittings Credit, switched from C110 fittings to C153 to shorten lead times and
reduce cost.
SUMMARY Amount %Change
Original Contract Price: $25,917,630.47
Previous Quantity Adjustment(s): $0.00
This Quantity Adjustment: $130,471.00
Total Quantity Adjustment(s): $130,471.00
Total Contract Price with Quantity Adjustment(s): $26,048,101.47
Previous Change Order(s): 0%
This Change Order: $329,947.50 1%
Total Change Order(s)To Date: $329,947.50 1%
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s)Plus Change Order(s)]: $26,378,048.97
Difference between Original and Adjusted Contract Prices: $460,418.50
Original Contract Time: 450
Time Adjustment by previous Quan.Adj./Change Order:
Time Adjustment by this Quan.Adj./Change Order:
New Contract Time: 450
Submitted for ApWovel
'`ago .: "
Prepared By: Joshua Little ;,®: � ,, Joshua Little,Sr. Project Manager 5/1/25
Signature Printed Name,Title, Company Date
Approvals
oe Chesney �" �'°��'
Contractor: j y °m"" Joe Chesney,VP Operations 5/1/25
Signature Printed Name,Title,Company Date
City Project9����� Gerald Pohlmeyer 05/28/2025
Manager:
S' nature Printed Name,Title Date
Mayor/City /
Manager //0C ra rapyi mavar (o Z 01Z
Signature PriAted NamVritle Date
-0
Page 2 of 3
Contract Quantity Adjustment/Change Order
rev,01/16
Project Name: Wyoming Springs
Quan. Adj./Change Order No.: 1
Change Order Data
Contract
Time
Adjustment
Item # Item Description Unit Qty. Unit Price Amount (Days)
Atmos Gas Cap CY 116.5 $1,468.00 $171,021.56
C153 Fittings Credit LS 1 -$22,178.06 -$22,178.06
Brushy Creek Bridge Redesign LS 1 $96,642.00 $96,642.00
30" Split Bell Joint Restraints EA 4 $7,100.00 $28,400.00
Cap Exc Accelertation Crew for 30"
Waterline LS 1 $23,665.00 $23,670.00
Multi Inlet Connection,Curb Inlets EA 15 $1,574.00 $23,610.00
8"Wet Connect EA 1 $8,782.00 $8,782.00
TOTALS: $329,947.50 0
Page 3 of 3
Contract Quantity Adjustment/Change Order
aouNOAoocrexns
rev,01/16
Project Name: Wyoming Springs
Quan.Adj./Change Order No.: 1
Quantity Adjustment Data
Contract
Time
Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment
Ductile Iron Fittings TN 3.19 $40,900.00 $130,471.00
TOTALS: $130,471.0010