Loading...
Contract - Capital Excavation Company - 6/26/2025 Page 1 of 3 NOVND NOG(iexa, Contract Quantity Adjustment/Change Order rev,01/16 Department: Project Name: Wyoming Springs Date: 5/1/25 City Project Change Order/Quantity ID Number Adjustment No. i Vendor Capital Excavation 2967 Business Park Dr, Buda,TX 512-440-1717 Company Name Address Phone No. justification Adding items for ATMOS gas line cover, 30"waterline split restraints, 8"waterline wet connect and curb inlet modification. These items were not included in the original bid estimate. Added items for the Brushy Creek Bridge redesign to alleviate dead loads and prolong the life of the bridge while maintaining aesthetic appeal. Added item for C153 Fittings Credit, switched from C110 fittings to C153 to shorten lead times and reduce cost. SUMMARY Amount %Change Original Contract Price: $25,917,630.47 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $130,471.00 Total Quantity Adjustment(s): $130,471.00 Total Contract Price with Quantity Adjustment(s): $26,048,101.47 Previous Change Order(s): 0% This Change Order: $329,947.50 1% Total Change Order(s)To Date: $329,947.50 1% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $26,378,048.97 Difference between Original and Adjusted Contract Prices: $460,418.50 Original Contract Time: 450 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 450 Submitted for ApWovel '`ago .: " Prepared By: Joshua Little ;,®: � ,, Joshua Little,Sr. Project Manager 5/1/25 Signature Printed Name,Title, Company Date Approvals oe Chesney �" �'°��' Contractor: j y °m"" Joe Chesney,VP Operations 5/1/25 Signature Printed Name,Title,Company Date City Project9����� Gerald Pohlmeyer 05/28/2025 Manager: S' nature Printed Name,Title Date Mayor/City / Manager //0C ra rapyi mavar (o Z 01Z Signature PriAted NamVritle Date -0 Page 2 of 3 Contract Quantity Adjustment/Change Order rev,01/16 Project Name: Wyoming Springs Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) Atmos Gas Cap CY 116.5 $1,468.00 $171,021.56 C153 Fittings Credit LS 1 -$22,178.06 -$22,178.06 Brushy Creek Bridge Redesign LS 1 $96,642.00 $96,642.00 30" Split Bell Joint Restraints EA 4 $7,100.00 $28,400.00 Cap Exc Accelertation Crew for 30" Waterline LS 1 $23,665.00 $23,670.00 Multi Inlet Connection,Curb Inlets EA 15 $1,574.00 $23,610.00 8"Wet Connect EA 1 $8,782.00 $8,782.00 TOTALS: $329,947.50 0 Page 3 of 3 Contract Quantity Adjustment/Change Order aouNOAoocrexns rev,01/16 Project Name: Wyoming Springs Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment Ductile Iron Fittings TN 3.19 $40,900.00 $130,471.00 TOTALS: $130,471.0010