Loading...
Contract - Gage and Cade Construction, LLC - 6/12/2025 CITY OF ROUND ROCK Public Works /7* `ROUND ROCK TEXAS Project Manual For: South Creek Channel Improvements May 2025 Prepared By: City of Round Rock 3400 Sunrise Road Round Rock, TX 78664 APPROVED BY CITY ATTORNEY TBPE Firm Registration No South Creek Channel Improvements TABLE OF CONTENTS Section Description No. of Pages 00020 Notice to Bidders (E-Bid) 2 00100 Instructions to Bidders (E-Bid) 4 Exhibit A -Form 1295 Instructions 1 00200 Bid Bond 2 00300 Bid Form 6 00410 Statement of Bidder's Safety Experience 1 00500 Agreement 5 00600 Insurance& Construction Bond Forms Performance &Payment Bond Instructions 1 00610 Performance Bond 2 00620 Payment Bond 2 Insurance Instructions 1 00650 Certificate of Liability Insurance 1 00700 General Conditions 41 00800 Supplemental General Conditions 2 00900 Special Conditions 5 01000 Technical Specifications 2 2 02000 Plans,Details and Notes 1 8-2016 Table of Contents 00090665 City of Round Rock, Texas Contract Forms Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor AGREEMENT made as of the Thirtieth Z--"49j day of 3 e— c C cr in the year 20 25 . BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor Gage and Cade Construction,LLC ("Contractor") 1107 CR 264 Bertram Tx,78605 The Project is described as: South Creek Channel Improvements The Engineer is: Michael C.Newman,P.E. Kasberg,Patrick&Associates,LP 800 South Austin Ave. Georgetown,TX 78626 For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions),Drawings, Specifications,Addenda issued prior to execution of this Agreement,other documents listed in this Agreement and Modifications issued after execution of this Agreement;these form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements, either written or oral.An enumeration of the Contract Documents,other than Modifications,appears in Article 7. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents,except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 4-2020 Page 1 of 5 Standard Form of Agreement 00443647 ARTICLE 3 DATE OF COMMENCEMENT;DATE OF SUBSTANTIAL COMPLETION;DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within ten (10 ) calendar days from the date delineated in the Notice to Proceed. 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this Agreement no later than N/A ( 0 )calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than ninety (90 )calendar days from issuance by Owner of Notice to Proceed, subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof) on or before the date(s)specified for Substantial Completion in the Agreement,Contractor shall pay to Owner,as liquidated damages, the sum of one thousand and No/100 Dollars($ 1,000 ) for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement and is not a penalty. It is agreed that the harm that would be caused by such failure, which includes loss of expected use of the Project areas,provision of alternative storage facilities and rescheduling of moving and occupancy dates,is one that is incapable or very difficult of accurate estimation. It is hereby agreed that if Substantial Completion of the Work(or any portion thereof)is not achieved on or before thirty(30)days after the date(s) specified for Substantial Completion in the Agreement, the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation, the recovery of actual damages. The date(s) specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than one hundred twenty ( 120 )calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's full and complete performance of the Work and all of Contractor's obligations under this Agreement. The Contract Sum shall be Three Hundred Twenty Seven Thousand Nine Hundred Ninety One Dollars and Fourty Cents ($327,991.40 ),subject to additions and deductions as provided in the Contract Documents. 4.2 Does the Contract Sum include alternates which are described in the Bid Form? No X . Yes .If yes,please provide details below: 00500 4-2020 Page 2 of 5 Standard Form of Agreement 00443647 ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor,and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender,Owner shall make progress payments on account of the Contract Sum to Contractor as provided below, in Article 14 of the General Conditions, and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.1.3 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth (10th) day of a month, Owner shall make payment to Contractor of amounts approved by the Owner not later than the tenth(10th)day of the next month.If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. The Owner shall not have any obligation to pay any amount covered by the Engineer's Certificate for Payment that is disputed by the Owner. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require.This schedule,unless objected to by Engineer or Owner, shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as provided in Article 14 of the General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work, and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer and approved by the Owner. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed.Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to fmal payment,and shall not be treated as warranty items. ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the General Conditions. 00500 4-2020 Page 3 of 5 Standard Form of Agreement 00443647 6.2 The Work may be suspended by Owner as provided in Article 15 of the General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary,� Special,and other Conditions of the Contract are those contained in the Project Manual dated May 2025 7.1.4 The Specifications are those contained in the Project Manual dated May 2025 7.1.5 The Drawings,if any,are those contained in the Project Manual dated May 2025 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated May 2025 7.1.7 The Notice to Bidders,Instructions to Bidders,Bid Form,and Addenda,if any,are those contained in the Project Manual dated May 2025 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents,if any,forming part of the Contract Documents are as follows: pJ1A ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Noemi Avila,P.E.,CFM Staff Engineer 3400 Sunrise Rd. Round Rock,TX 8.3 Contractor's representative is: Zach Cason Project Manager 1107 CR 264 Bertram,Tx 78605 8.4 Neither Owner's nor Contractor's representative shall be changed without ten(10)days'written notice to the other party. 00500 4-2020 Page 4 of 5 Standard Form of Agreement 00443647 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor,subject to proper additions and deductions,all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner,both parties hereto expressly agree and assert that,in the event of any dispute over its meaning or application,this Agreement shall be interpreted reasonably and fairly,and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock,Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding,including without limitation,any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least two(2) original copies,of which one is to be delivered to Owner. OWNER CONTRACTOR CITY O RO RO K,TEXAS Gage Construction,LLC Printed ame: nnted Name: Zach Cason Title tiAa4D Title: PM Date Signed: ' t (21/215 Date Signed: 6/30/25 T ES • Clerk FOR CITY APPROVED AS TO FORM: City ttorney 00500 4-2020 Page 5 of 5 Standard Form of Agreement 00443647 PERFORMANCE BOND Bond No:4410766 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Gage and Cade Construction, LLLC , of the City of Bertram County of Burnet , and State of Texas ,as Principal,and FCCI Insurance Company authorized under the law of the State of Texas to act as surety on bonds for principals,are held and firmly bound unto the CITY OF ROUND ROCK,TEXAS (Owner), in the penal sum of Three Hundred Twenty seven Thousand Nine Hundred Ninety One Dollars&40/100 Cents Dollars ($ 327,991.40 ) for the payment whereof, well and truly to be made the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner dated the 13thr -'/ --..day of Jeine*JtA ti ,2025 to which the Agreement is hereby referred to and made a part hereof as fully and to the/same extent as if copied at length herein consisting of: South Creek Channel Improvements NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of,the Principal in performing the Work covered by said Agreement and occurring within a period of twelve (12) months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed,then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 1 00610 4-2020 Performance Bond 00443639 PERFORMANCE BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond,and it does hereby waive notice of any such change,extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder. If Principal fails to faithfully perform said Agreement, Surety, after receipt of written notice of Principal's default,shall perform all of Principal's duties and obligations under the Agreement. If, within ten (10) days after receipt of such notice from Owner, Surety does not commence to complete the obligations of Principal with a contractor acceptable to Owner and diligently complete the performance of the Principal's duties and obligations, Owner shall have the right but not the obligation to have the duties and obligations of Principal performed. In such event, Surety shall pay to Owner, upon demand,all costs,expenses and damages sustained by Owner as a result of Principal's failure to perform its duties and obligations under the Agreement up to the Total sum of this Performance Bond, plus all costs and expenses, including attorney's fees and expert and consultant fees incurred by Owner to enforce its rights under this Performance Bond. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 1st day of July , 2025 . Gage and Cade Construction, LLC FCCI Insurance Company Principal�,", � i� Surety �pn/ �OA( James F. Siddons Printed Ni e Printed N e �• Title: MI Title: omey-In-Fact Address: 0 Address: 6300 University Parkway IMINIEnikii ' Sarasota, FL 34240 Resident Agent of Surety:Watkins Insurance Group Si Lure James F. Siddons Printed Name 3834 Spicewood Springs Rd#100 Street Address Austin,Tx 78759 City, State&Zip Code Page 2 00610 4-2020 Performance Bond 00443639 PAYMENT BOND Bond No:4410766 THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Gage and Cade Construction, LLC ,of the City of Bertram County of Bumet ,and State of Texas ,as Principal,and FCCI Insurance Company authorized under the laws of the State of Texas to act as Surety on Bonds for Principals,are held and firmly bound unto the CITY OF ROUND ROCK, TEXAS (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of Three Hundred Twenty Seven Thousand Nine Hundred Ninety One Dollars&40/100 Cents Dollars($ 327,991.40 )for the payment whereof,well and truly be made the said Principal and Surety bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: WHEREAS,the Pri cipal has entered into a certain written Agreement with the Owner,dated the lath Z.. /T day of.JZ4J , 2025 to which Agreement is hereby referred to and made a part hereof as fully anfl to the same extent as if copied at length herein consisting of: South Creek Channel Improvements NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall well and truly pay all subcontractors,workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts,work,labor,equipment,supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void;otherwise to remain in full force and effect. PROVIDED,HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 1 00620 04-2020 Payment Bond 00437699 PAYMENT BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect its obligation on this bond,and it does hereby waive notice of any such change,extension of time,alteration or addition to the terms of the contract, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this 1st day of July ,2025 . Gage and Cade Construction, LLC FCCI Insurance Company Principal Surety �GP ')oiv James F. Siddons Printed Name Printed Name By: By: ..1 )20/47' Title: I Title: Qtorney-In-Fact Address: 7 C Address: 6300 University Parkway gtd,ar. 7169 Sarasota, FL 34240 Resident Agent of Surety: Watkins Insurance Group '"120fAl Sig ure James F. Siddons Printed Name 3834 Spicewood Springs Rd# 100 Street Address Austin, Tx 78759 City, State&Zip Code Page 2 00620 I-2020 Payment Bond 00090656 IMPORTANT NOTICE To obtain information or make a complaint: You may call FCCI Insurance Group's(FCCI)*toll-free telephone number for information or to make a complaint at 1-800-226-3224. You may also write to FCCI Insurance Group Compliance Department e-mail at StateComplaints(cfcci-group.com. For Claims, you may write to FCCI Insurance Group Claim Department e-mail at newclaim(a.fcci-group.com. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439. You may write the Texas Department of Insurance: PO Box 149104 Austin TX 78714-9104 Fax: 1-512-490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtections a(�tdi.texas.gov PREMIUM OR CLAIM DISPUTES Should you have a dispute concerning your premium or about a claim you should contact FCCI first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND This notice is for information only and does not become a part or condition of the attached documents. *The FCCI Insurance Group includes the following insurance carriers: Brierfield Insurance Company, FCCI Advantage Insurance Company, FCCI Commercial Insurance Company, FCCI Insurance Company, Monroe Guaranty Insurance Company, and National Trust Insurance Company. 1-BD-TX-21690-NTP-07 15 Page 1 of 1 Copyright 2015 FCCI Insurance Group. FCC INSURANCEI®GRC U GENERAL POWER OF ATTORNEY Know all men by these presents: That the FOCI Insurance Company, a Corporation organized and existing under the laws of the State of Florida (the "Corporation")does make, constitute and appoint: James F Siddons; Patrick L Watkins; Rodney Watkins; Andrew Webb; Robert J Guyton; Jeff Husk; Cindy Rodriguez Each, its true and lawful Attorney-In-Fact, to make, execute, seal and deliver, for and on its behalf as surety, and as its act and deed in all bonds and undertakings provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the sum of(not to exceed $30,000,000.00): $30,000,000.00 This Power of Attorney is made and executed by authority of a Resolution adopted by the Board of Directors. That resolution also authorized any further action by the officers of the Company necessary to effect such transaction. The signatures below and the seal of the Corporation may be affixed by facsimile, and any such facsimile signatures or facsimile seal shall be binding upon the Corporation when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached. In witness whereof, the FOCI Insurance Company has caused these presents to be signed by its duly authorized officers and its corporate Seal to be hereunto affixed, this 20"'day of December, 2024. Attest: (1Ac�O r Christina D.Welch, President ELL SEAL ,� Christopher Shoucair, FCCI Insurance Company ,y,,, EVP, CFO, Treasurer, Secretary FOCI Insurance Company State of Florida County of Sarasota Before me this day personally appeared Christina D. Welch, who is personally known to me and who executed the foregoing document for the purposes expressed therein. 4 .•'�•,�4 PEGGY SNOW My commission expires: 2/27/2027 * • ,, "' ,� Notary Public Non" Expires February 27,2427 State of Florida County of Sarasota Before me this day personally appeared Christopher Shoucair, who is personally known to me and who executed the foregoing document for the purposes expressed therein. ,fir r .•••• PEGGY SNOW My commission expires: 2/27/2027 * #NH J r. �, US Notary Public Vo•r# Expires February 27,2027 CERTIFICATE I, the undersigned Secretary of FOCI Insurance Company, a Florida Corporation, DO HEREBY CERTIFY that the foregoing Power of Attorney remains in full force and has not been revoked; and furthermore that the February 27, 2020 Resolution of the Board of Directors, referenced in said Power of Attorney, is now in force. Dated this 1St _ day of July , 2025 Christopher Shoucair, EVP, CFO, Treasurer, Secretary FCCI Insurance Company 1-10NA-3592-NA-04, 1/2025 ' ® DATE(MM/DD/YYYY) ACCPR o CERTIFICATE OF LIABILITY INSURANCE 5/13/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Watkins Insurance Group-Austin PHONE Dori Arizpe FAX 3834 Spicewood Springs Rd,Ste. 100 ((NC.No.Exti:512-276-5221 (A/c.No):512-452-0999 Austin TX 78731 ADDRESS: DArizpe@WatkinsInsuranceGroup.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Westchester Surplus Lines Insurance Company 10172 INSURED GAGE&CA-01 INSURER B:National Fire Insurance Company of Hartford 20478 Gage&Cade Construction, LLC 1107 County Road 264 INSURER C:The Continental Insurance Company 35289 Bertram TX 78605 INSURER D:Continental Casualty Company 20443 INSURER E:American Casualty Company of Reading, 20427 INSURER F: Mid-Continent Casualty Company COVERAGES CERTIFICATE NUMBER:1951938481 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICY NUMBER (MWDD/YYYY) (MM/DD/YYYY) B X COMMERCIAL GENERAL LIABILITY 7018110459 2/1/2025 2/1/2026 EACH OCCURRENCE $1,000,000 DAMAGE TO CLAIMS-MADE X OCCUR PREMISES(EaENTED occurrence) $1,000,000 MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GEN1 AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 X POLICY X Fin LOC PRODUCTS-COMP/OPAGG $2,000,000 OTHER: $ D AUTOMOBILE LIABILITY 7018110462 2/1/2025 2/1/2026 COMBINED SINGLE LIMIT $1,000,000 (Ea accident) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY ,(Per accident) $ C X UMBRELLA LIAB X OCCUR 7018110493 2/1/2025 2/1/2026 EACH OCCURRENCE $10,000,000 EXCESS UAB CLAIMS-MADE AGGREGATE $10,000,000 DED X RETENTION$1tt,nnn $ E WORKERS COMPENSATION 7018110476 2/1/2025 2/1/2026 X AND EMPLOYERS'LIABILITY Mum ERA YIN ANYPROPRIETOR/PARTNERIEXECUTIVE N/A E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below t;E.L.DISEASE-POLICY LIMIT $1,000,000 A Pollution Liability G7438562A 003 12/21/2024 12/21/2025 Each Claim $1,000,000 F CIM0041402 2/1/2025 2/1/2026 Aggregate $2,000,000 Scheduled Equipment I Limit $6,130,500 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached H more space is required) Mid-Continent Casualty Company Policy#CIM 000041402 Rented/Leased Equipment 02/01/2025-02/01/2026 Limit per Any One Item:$750,000 Maximum Amount in Any One Loss:$2,000,000 The City of Round Rock is/induded as an additional insured on the general liability and auto liability policies with waiver of subrogation on the general liability, auto liability and workers compensation policies where required by written contract.30 day notice of cancellation endorsement applies when required by written contract. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City Manager ACCORDANCE WITH THE POLICY PROVISIONS. City of Round Rock 221 E. Main Street AUTHORIZED REPRESENTATIVE Round Rock TX 78664 ,11 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD