CM-2025-195 - 8/1/2025 Page 1 of 3 C ontract Quantity Adjustment/Change Order 1N ROCK rl YAS O rev,01/16 Department: Public Works Project Name: Round Rock West Area 5 Water,Wastewater,and Storm Drain Improvements Date: 7/25/25 City Project Change Order/Quantity ID Number RRWA5 Adjustment No. 2 Vendor Royal Vista,Inc. 350 CR 260 Liberty Hill,TX 78642 Company Name Address Phone No. Justification The condition of existing structures weren't sufficient to handle a reconnection to proposed utilities so they needed to be replaced.And the amount of clearance between utilities and from the existing ground level was underestimated. It required changes to allow the new infrastruture to be placed with the reduced clearance distance. SUMMARY Amount %Change Original Contract Price: $3'867 802.00 Previous Quantity Adjustment(s): $11,881.50 This Quantity Adjustment: $25,900.00 Total Quantity Adjustment(s): $37,781.50 Total Contract Price with Quantity Adjustment(s): $3,905,583.501 Previous Change Order(s): $7,629.10 0.20% This Change Order: $6,050.00 0.15% Total Change Order(s)To Date: $13,679.10 0.35% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $3,919,262.60 Difference between Original and Adjusted Contract Prices: $51,460.60 Original Contract Time: 420 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 12 New Contract Time: 432 �/'/// Submitted for Approval Prepared By: IV Bt i. 4 Noemi Avila, Staff Engineer, City of Round Rock 7/25/25 Signature Printed Name,Title,Company Date Approvals Contractor: ESL LYIrRoL.... V.1? ,t a_ Signature Printed Name,Title,Company ate City Projectl /I Manager: /(/e jItz..A Noemi Avila,Staff Engineer 7/25/25 Signature Prinisd N me7 t+L Date Mayor/City Manager CI mknao( &I11291 c Signature Printe ame,Title Date CM' 20-26 — 1q5 Page 2 of 3 Contract Quantity Adjustment/Change Order TV,0:/16 Project Name: Round Rock West Area 5 Water,Wastewater,and Storm Drain Improvements Quan.Adj./Change Order No.: 2 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) Excavate Base,Furnish, Place and 82 Compact Type B Hot Mix Ton 10 $450.00 $4,500.00 2 83 Fence Gate LS 1 $1,200.00 $1,200.00 1 84 Sprinkler System LS 1 $350.00 $350.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $6,050.00 4 Page 3 of 3 Y" y Contract Quantity Adjustment/Change Order rev O1i16 Project Name: Round Rock West Area 5 Water,Wastewater,and Storm Drain Improvements Quan.Adj./Change Order No.: 2 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Adjustment p Qty. Unit Price Amount !na„st 46 6-Inch Temporary Water Line LF 160 $65.00 $10,400.00 6 New Manhole Construction,48"Dia. 59 (WW)(Pre-cast Base) (All Depths) EA 1 $9,500.00, $9,500.00 1 Remove&Dispose of Existing 60 Wastewater Manhole EA 1 $3,500.00 $3,500.00 1 Sanitary Sewer Laterals(6"SDR26-Intl 63 Cleanout) EA 1 $2,500.00 $2,500.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00. $0.00 $0.00 $0.00 $0.00 TOTALS: $25,900.00 8