CM-2025-195 - 8/1/2025 Page 1 of 3
C
ontract Quantity Adjustment/Change Order
1N ROCK rl YAS O
rev,01/16
Department: Public Works
Project
Name: Round Rock West Area 5 Water,Wastewater,and Storm Drain Improvements Date: 7/25/25
City Project Change Order/Quantity
ID Number RRWA5 Adjustment No. 2
Vendor Royal Vista,Inc. 350 CR 260 Liberty Hill,TX 78642
Company Name Address Phone No.
Justification
The condition of existing structures weren't sufficient to handle a reconnection to proposed utilities so they needed to be replaced.And the
amount of clearance between utilities and from the existing ground level was underestimated. It required changes to allow the new infrastruture
to be placed with the reduced clearance distance.
SUMMARY Amount %Change
Original Contract Price: $3'867 802.00
Previous Quantity Adjustment(s): $11,881.50
This Quantity Adjustment: $25,900.00
Total Quantity Adjustment(s): $37,781.50
Total Contract Price with Quantity Adjustment(s): $3,905,583.501
Previous Change Order(s): $7,629.10 0.20%
This Change Order: $6,050.00 0.15%
Total Change Order(s)To Date: $13,679.10 0.35%
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s)Plus Change Order(s)]: $3,919,262.60
Difference between Original and Adjusted Contract Prices: $51,460.60
Original Contract Time: 420
Time Adjustment by previous Quan.Adj./Change Order: 0
Time Adjustment by this Quan.Adj./Change Order: 12
New Contract Time: 432
�/'/// Submitted for Approval
Prepared By: IV Bt i. 4 Noemi Avila, Staff Engineer, City of Round Rock 7/25/25
Signature Printed Name,Title,Company Date
Approvals
Contractor: ESL LYIrRoL.... V.1? ,t a_
Signature Printed Name,Title,Company ate
City Projectl /I
Manager: /(/e jItz..A Noemi Avila,Staff Engineer 7/25/25
Signature Prinisd N me7 t+L
Date
Mayor/City
Manager CI mknao( &I11291 c
Signature Printe ame,Title Date
CM' 20-26 — 1q5
Page 2 of 3
Contract Quantity Adjustment/Change Order
TV,0:/16
Project Name: Round Rock West Area 5 Water,Wastewater,and Storm Drain Improvements
Quan.Adj./Change Order No.: 2
Change Order Data
Contract
Time
Adjustment
Item# Item Description Unit Qty. Unit Price Amount (Days)
Excavate Base,Furnish, Place and
82 Compact Type B Hot Mix Ton 10 $450.00 $4,500.00 2
83 Fence Gate LS 1 $1,200.00 $1,200.00 1
84 Sprinkler System LS 1 $350.00 $350.00 1
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS: $6,050.00 4
Page 3 of 3
Y"
y Contract Quantity Adjustment/Change Order
rev O1i16
Project Name: Round Rock West Area 5 Water,Wastewater,and Storm Drain Improvements
Quan.Adj./Change Order No.: 2
Quantity Adjustment Data
Contract
Time
Bid Item# Item Description Unit Adjustment
p Qty. Unit Price Amount !na„st
46 6-Inch Temporary Water Line LF 160 $65.00 $10,400.00 6
New Manhole Construction,48"Dia.
59 (WW)(Pre-cast Base) (All Depths) EA 1 $9,500.00, $9,500.00 1
Remove&Dispose of Existing
60 Wastewater Manhole EA 1 $3,500.00 $3,500.00 1
Sanitary Sewer Laterals(6"SDR26-Intl
63 Cleanout) EA 1 $2,500.00 $2,500.00 0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00.
$0.00
$0.00
$0.00
$0.00
TOTALS: $25,900.00 8