R-2025-211 - 8/14/2025
RESOLUTION NO. R-2025-211 WHEREAS, the City of Round Rock entered into a contract on December 21, 2023 with SpawGlass Contractors, Inc., entitled "Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of Work Plus a Fee with a Guaranteed Maximum Price" ("Agreement"), and such contract is for the Old Settlers Park Buildout Project — Athletic Performance Center(Package 3C—GMP 2); and WHEREAS, the terms of said Agreement require the submission of an Exhibit "A" to the Agreement titled, "Guaranteed Maximum Price Amendment" ("Amendment"); and WHEREAS,the City Council wishes to accept and execute said Amendment to the Agreement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute, on behalf of the City, Guaranteed Maximum Price Amendment to the Agreement with SpawGlass Contractors, Inc. for the Old Settlers Park Buildout Project—Athletic Performance Center(Package 3C—GMP 2),a copy of said Amendment being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date,hour,place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of August, 2025. CRAIG ORG , Mayor City of Round ck, Texas ATT ST: \ALLL9 ANN RANKLIN, City Clerk 0112 20252.4911-5495-7401 EXHIBIT A mer } Document A133 - 2019 Exhibit A Guaranteed Maximum Price Amendment This Amendment dated the day of in the year,is incorporated into the accompanying MA Document A 133T" 2019,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the day of in the year(the ADDITIONS AND DELETIONS: "Agreement") The author of this document may (hi words, indicate day, month,and year.) have revised the text of the original AIA standard form.An Additions for the following PROJECT: and Deletions Report that notes (Name and address or location) revisions to the standard form text is available from the author and Old Settlers Park Buildout-Package 3C-Rec Center-GMP 2 should be reviewed.A vertical line Old Settlers Park in the left margin of this document 3300 E.Palm Valley Blvd indicates where the author has Round Rock,TX 78665 added to or deleted from the original AIA text. THE OWNER: This document has important legal (Name, legal status,and address) consequences.Consultation with an attorney is encouraged with City of Round Rock respect to its completion or 221 East Main Street,Round Rock,TX 78644 modification. THE CONSTRUCTION MANAGER: AIA Document A201'"-2017, General Condit ons of the Contract (Name, legal status,and address) for Construction is adopted in this SpawGlass Contractors, Inc. document by reference.Do not use I 1 1 l Smith Road,Austi,TX 78721 with other general conditions unless this document is modified. TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER'S CONSULTANTS,CONTRACTORS,DESIGN PROFESSIONALS,AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE §A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 of the Agreement,the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price.As agreed by the Owner and Construction Manager,the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed.The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work,as that term is defined in Article 6 of the Agreement. §A.1.1.1 The Contract Sum is guaranteed by the Constntction Manager not to exceed Seventy-One Million Four Hundred and Ninety-Six Thousand Five Hundred Nineteen Dollars and Zero Cents(S 71,496,519.00 ),subject to additions and deductions by Change Order as provided in the Contract Documents. AIA Document A133-2019 Exhibit A.Copyright®1991,2003,2009.and 2019.All rights reserved -The American Institute of Architects,""American Institute of Architects."'AIA,"the AIA Logo,and`AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 08 32 19 1 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents,'Terms of Service.To report copyright violations.e-mail docinfo@aiacontracts.com, User Notes: (686ec395c41ddbe9f999cb3d) §A.1.1.2 Itemized Statement of the Guaranteed Maximum Price.Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances;the Construction Manager's contingency;alternates; the Construction Manager's Fee;and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) Reference attached GMP package-Tab 06 §A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. §A.1.1.4 The method of adjustment of the Construction Manager's Fcc for changes in the Work is set forth in Section 6.1.3 of the Agreement. §A.1.1.5 Alternates §A.1.1.5.1 Alternates,if any, included in the Guaranteed Maximum Price: Item Price §A.1.1.5.2 Subject to the conditions noted below,the following alternates may be accepted by the Owner following execution of this Exhibit A.Upon acceptance,the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must he met for the Owner to accept the alternate.) Item Price Conditions for Acceptance §A.1.1.6 Unit prices,if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will he applicable.) Item Units and Limitations Price per Unit 450.00) ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §A.2.1 The date of commencement of the Work shall be: (Check one of the following boxes) [ I The date of execution of this Amendment. [X] Established as follows: (Insert a date or a means to determine the date of commencement o/the Work.) September 3rd,2025 If a date of commencement of the Work is not selected,then the date of commencement shall be the date of execution of this Amendment. §A.2.2 Unless otherwise provided,the Contract Time is the period of time,including authorized adjustments,allotted in the Contract Documents for Substantial Completion of the Work.The Contract Time shall be measured from the date of commencement of the Work. §A.2.3 Substantial Completion §A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one of the follott ing buses and complete the necessary information.) [ ] Not later than( )calendar days from the date of commencement of the Work. [X ] By the following date:April 9th,2027 AIA Document A133-2019 Exh b l A.Copyright C5)1991.2003.2009,and 2019.All nghts reserved.'The American Institute of Architects,""American Institute of Architects.-'AIA-the AIA Logo and-A A Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 08 32.19 2 CDT on 07;10.2025 under Subscript on No 20250142682 which expires on 0710512026,is not for resale,is licensed for one-time use only.and may only be used n accordance with the AIA Contract Documents`Terms of Service.To report copynght violations,e-mail docinfor aiacontracts.com. User Notes: (686ec395c41ddbe9f999cb3d) §A.2.3.2 Subject to adjustments oldie Contract Time as provided in the Contract Documents,if portions of the Work are to be completed prior to Substantial Completion of the entire Work,the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date §A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages,if any,shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED §A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: §A.3.1.1 The following Supplementary and other Conditions of the Contract: Document Title Date Pages §A.3.1.2 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) Rec Center 95%Technical Specifications as issued by Kimley-Horn in April 2025 Administration and Recreation Center Project Specifications as issued by PBK on April 21, 2025 Rec Center Complex Geotechnical Engineering report as issued by UES Professional Solutions 45, LLC on November 4, 2024 Rec Center Complex Grading Recommendations - Soccer and Practice Fields as issued by UES Professional Solutions 45, LLC on April 25, 2025 Section Title Date Pages §A.3.1.3 The following Drawings: (Either list the Drawings here,or refer to an exhibit attached to this Amendment.) Rec Center 95%Technical Specifications as issued by Kimlcy-Horn in April 2025 Administration and Recreation Center 95%Contract Drawings issued by PBK on April 21,2025 Number Title Date §A.3.1.4 The Sustainability Plan,if any: (lithe Owner identified a Sustainable Oijective in the Ottner'c Criteria, identify the document or documents that comprise the Sustainability Plan by title, date and number of pages, and include other identifying in!/ormation. The Sustainability Plan identifies and describes the Sustainable Oh/ective;the targeted Sustainable tileasures: implementation strategies selected to achieve the Sustainable Measures:the Owner's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Meacru•ec;the specific details about design reviews,testing or metrics to verifi'achievement of each Sustainable Measure;and the Sustainahiliir Documentation required for the Project,as those terms are defined in Exhibit C to the Agreement.) Title Date Pages Other identifying information: • §A.3.1.5 Allowances,if any, included in the Guaranteed Maximum Price: (Identify each allowance) AIA Document A133 2019 Extibl A.Copyright®1991,2003,2009 and 2019.All nghls reserved.'The American Institute of Architects;"Amencan Institute of Architects,'"AIA'the AIA Logo.and"A A Contract Documents'are trademarks of The American Institute of Arch lects This document was produced at 08 32 19 3 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 074)5.2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contrail Documents'Terms of Service.To report copyright violations e-mail docrnfo@aiacontracts corn. User Notes: 1686ec395c41ddbe9f999cb3d) Item Price Escalation Allowance $1,055,344.00 §A.3.1.6 Assumptions and clarifications,if any,upon which the Guaranteed Maximum Price is based: (Identh.each assumption and clarification.) Reference attached GMP Package-Tab 05 §A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here,or refer to an exhibit attached to this Amendment.) ARTICLE A,4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS §A.4.1 The Construction Manager shall retain the consultants,contractors,design professionals. and suppliers,identified below: (List name,discipline,address, and other injoruwiwn.) This Amendment to the Agreement entered into as of the day and year first written above. A�/ OWNER(Signature) • S •UCTIO, + •GER(Srgnarm•e) BY:Craig Morgan,Mayor " •: David Paden,Austin Division President (Printed name and title) (Printed name and title) AIA Document A133—2019 Exhibit A.Copyright 8)1991.2003,2009,and 2019.All rights reserved.'The American Institute of Architects."American Institute of Architects.""AIA."the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects This document was produced at 08 32 19 4 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026.is not for resale,is licensed for one-time use only,and may only be used n accordance with the AIA Contract Documents,'Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (666ec395c41ddbe9f999cb3d) Additions and Deletions Report for AIA Document A 133�— 2019 Exhibit A This Additions and Deletions Rep:rt,as defined on page 1 of the associated document,reproduces below all text the author has added to the standard form MA document in order to complete il,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined.Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or rnnstitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 08.32:19 CDT on:)7/10/2025. Changes to original AIA text PAGE 3 Rec Center 95% Technical Specifications as issued by Kitnley-Horn in April 2025 Administration and Recreation Center Project Specifications as issued by PBK on April 21, 2025 Rec Center Complex Geotechnical Engineering report as issued by UES Professional Solutions 45, LLC on November 4, 2024 Rec Center Complex Grading Recommendations— Soccer and Practice Fields as issued by UES Professional Solutions 45, LLC on April 25, 2025 Rec Center 95%Technical Specifications as issued by Kimlcy-Horn in April 2025 Administration and Recreation Center 95°o Contract Drawings issued by PBK on April 21,2025 PAGE 4 Item Price Escalation Allowance $1,055,344.00 Variable Information PAGE 1 Old Settlers Park Buildout- Package 3C- Rec Center-GMP 2 Old Settlers Park 3300 E. Palm Valley Blvd Round Rock,TX 78665 City of Round Rock 221 East Main Street, Round Rock,TX 78644 SpawGlass Contractors,Inc. Additions and Deletions Report for AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009.and 2019.All rights reserved.'The American Institute of Architects,'"American Institute of Architects,'"AIA,"the AIA Logo,and"AIA Contract Documents-are trademarks of The American Institute of Architects This 1 document was produced at 08:32:19 COT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one- time use only,and may only be used in accordance with the AIA Contract Documentss Terms of Service To report copyright violations,e-mail docinfo@aiacontracts corn User Notes: (686ec395c41ddbegf999ch3d1 1 1 1 1 Smith Road.Austi,TX 78721 § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Seventy-One Million Four Hundred and Ninety-Six Thousand Five Hundred Nineteen Dollars and Zcro Cents (S 71.A96.519.00 ),subject to additions and deductions by Change Order as provided in the Contract Documents. PAGE 2 Reference attached GMP package-Tab 06 [ ] The date of execution of this Amendment. [X ] Established as follows: (Insert a date or a means to determine the date of'commencement of the [York.) September 3rd,2025 ( ] Not later than()calendar days from the date of commencement of the Work. [X ] By the following date: April 9th,2027 PAGE 4 Reference attached GMP Package-Tab 05 Additions and Deletons Report for MA Document A133-2019 Exhibit A Copyright'0 1991 2003.2009,and 2019.All rights reserved. The American Institute of Architects,' American Institute of Arch tests''AIA;the A'A Logo.and"AIA Contract Documents'are trademarks of The American Institute of Architects This 2 document was produced at 08 32 19 CDT on 07/10/2025 under Subscription No 20250142682 wh ch expires on 0710512026,is not for resale,is licensed for one- time use only,and may only be used in accordance with the AIA Cortract Documents'Terms of Service.To report copyright violations.e-mail docrnfo@aracontracts corn User Notes: 1686ec395c41ddbe9f999cb3d1 Certification of Document's Authenticity AIA®Document D401 TM —2003 1,,hereby certify,to the best of my knowledge,information and belief.that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 08:32:19 CDT on 07/10.2025 under Order No.20250142682 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA" Document A I 33"I-2019 Exhibit A, Guaranteed Maximum Price Amendment,other than those additions and deletions shown in the associated Additions and Deletions Rc,• . (Si . r t bar (Title) —r 1 I°jts (Dated) AIA Document D401-2003.Copyright Cr 1992 and 2003.AI rights reserved.-The American Institute of Architects."'American Institute of Architects.''AIA,the AIA Logo.and-AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 08:32:19 CDT on 07/10/2025 under Order No.20250142682 which expires on 07/0512026,is not for resale.is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents'Terms of Service To report copyright violations,e-mail docinfo@aiacontracts corn. User Notes: (686ec395cA1ddbe9f999cb3d) SpawGlass Providing the Absolute Best Construction rucr!O1l Experience 111111 • +1 1:,� ic;. City of Round Rock Old Settler's Park Build Out 95% Rec Center GMP #2R1 7/1/2025 444 4.444. • '° v • • • w' /1111111k 4-„ icy TABLE OF CONTENTS TAB 1 TAB 6 BUDGET ESTIMATE OVERVIEW BUDGET PROPOSAL COST BREAKDOWN TAB2 TAB7 EXECUTIVE PROJECT SUMMARY MASTER PROJECT SCHEDULE TAB 3 TAB 6 PROJECT TEAM BID/PROPOSAL PACKAGE STRATEGY TAB 4 LIST OF DOCUMENTS TAB 5 ASSUMPTIONS & CLARIFICATIONS 1111r TAB1 \GMP ESTIMATE OVERVIEW .,(4.,.. l• 11 P *1... , ...) .41114, .4 , 40* III _ . , • , 1 ..i, l -4 IF r A , ',.• I . 'A 1 4 c C./ ...,-. . , • , t i f . 1 Sj)avvt 'lass (1 Providing the Absolute Best 1 0 Construction Experience 1 I 1 i %(rIass' Project Cost Summary -.-- _.,-- 95% CD GMP OVERVIEW SpawGlass Contractors, Inc. hereby submits to the City of Round Rock for the use and benefit of the new Old Settler's Park Buildout - Package 3C Rec Center GMP #2, based on the 95% CD Drawings, as follows: 1. The proposed amount for the Direct Cost of the Work: $ 60.305,375 2. General Conditions: $ 1.975.623 3. Builder's Risk Insurance: $ 116.182 4. General Liability Insurance: $ 539,084 5. Payment & Performance Bonds: $ 495.149 6. Subcontractor Default Insurance (1.25%): $ 753,817 7. Warranty: $ 178.741 8. EscalatIon/Tariffs: $ 1.055.344 9. Construction Manager's Contingency (3.00/0): $ 2,144.896 10. Design Progression Contingency (2%): $ 1,429.930 11.Construction Phase Fee (3.50%): $ 2.502.378 12.TOTAL: LINE ITEMS 1 THROUGH 11: $ 71.496.519 Tyler Wenzel, Project Executive ........f .._,...... ,r ,,,. ,,,.....•.-, TAB 2 . ........, „ lt, ._ „1/4,i)4, EXECUTIVE PROJECT SUMMARY i g 'ilk- m 1 , rik::\.-f- ot r . .,i,._ ilk .........„.... ..,.......„.. \k,,..,.;:.:, . . . _ r r ..... . . _ %. ,16, SpatvGlass Providing the Absolute Best Construction Experience SpawGlass' Executive Summary City of Round Rock - Old Settler's Park Build Out Package 3C - Rec Center 9S% CD Drawings 3300 E Palm Valley Blvd Round Rock, TX 78665 Scope of Work The Rec Center 95% CO GMP #2 includes: general conditions, general requirements, structural concrete, site concrete, masonry, structural steel, misc. steel, stairs, millwork, waterproofing, roofing, windows, doors, hardware, metal framing, drywall, metal panels, ceramic tile, flooring, painting, signage allowance, equipment, elevators, ceilings, PEMB, fire sprinklers, plumbing, HVAC, electrical, fire alarm, landscaping, synthetic fields, track and fields. Overview GMP #1 for earthwork and site utilities is already underway. GMP #2 for the balance of scopes is Included here. Breaking the packages out allowed the earthwork for the Rec Center to concurrently with the Rock River, resulting in a net savings to the city. '1"" TAB ,,- PROJECT TEAM •i '. o. - II il % I i 1 ,;,,,n,wi,watfio. .,,„ toppoj. ' 1' 6 v 44;., hi:.- ' -'11110 at i : ..J t ii% .10 11 . _ -40 _,Itt, N.. .,. 41 v, f .. a P , ,, •,.1 i I.' 1k I 1 ' 1 All 401 i k _____ ...... ilrir th tx I., r - ,e-- , • , - ,nor,fibrithrgyo-ct v . _____ •.. vii .141111116INIWit Welliram.-0 Sl)aW6laSS - , 000144.7. ' - Providing the Absolute Best ... „ , Construction Experience 4,4-.1;Az-1-440Etitjk;' e.-,!:+•0-..„:1.- ORGANIZATION CHART maw 1 ■ Management Support II Teem Laad/Siagi.Point-«-Contict II On-site Team Safety CITY OF ROUND ROCK N PreconstructexJEstimatingSupport DAVID PADEN TOM MCCLANAHAN i( DIVISION PRESIDENT SENIOR ESTIMATOR JOEY GEORGE ADAM WARDEN OPERATIONS MANAGER . ESTIMATOR 1 IIJUAN MARQUEZ BRIAN CLAXTON SAFETY COORDINATOR BIMNDC COORDINATOR TYLER WENZEL PROJECT EXECUTIVE/ i PRECONSTRUCTION SERVICES MANAGER PARKER BLASCHKE __ HARRISON HOLLEY SENIOR PROJECT MANAGER SENIOR SUPERINTENDENT CHRIS SOTO © ASSISTANT SUPERINTENDENTS ASSISTANT PROJECT MANAGER DAYLON DYESS 4110 ASSISTANT PROJECT MANAGER QUALITY CONTROL COORDINATOR . u , . .4 ., a P. TAB 4 ,4 { . +-'y \LISTUMENTS f f 1 , I— ,-"1 1 . , - .,_, , ir 1, ..., s /, 1 A , )st • i,. . z.--1 i ,.. .:, I ....- , y. i^ i .N • ! . S a vG1ass = - Providing the Absolute Best ,�, :• Construction Experience List of Documents CoRR OSP-Rec Center and Admin Building 95%CD Drawings-GMP#2 SHEET DESCRIPTION REVISION DATE G001-SHEET INDEX 4/21/2025 G002-GENERAL PROJECT INFORMATION 4/21/2025 GO10-PROJECT DATA AND CODE REVIEW 4/21/2025 GO11-LEVEL 1-LIFE SAFETY EGRESS PLAN-AREA A 4/21/2025 G012-LEVEL 1-LIFE SAFETY EGRESS PLAN-AREA B 4/21/2025 G013-LEVEL 2-LIFE SAFETY EGRESS PLAN-AREA B 4/21/2025 G014-LEVEL 1-LIFE SAFETY EGRESS PLAN-AREA C 4/21/2025 G015-MF77ANINE LEVEL-LIFE SAFETY EGRESS PLAN-AREA C 4/21/2025 G020-ACCESSIBILITY GUIDELINES 4/21/2025 G035-COURT LEVEL FLOOR PLAN-AREA D-SPECIAL CONDITIONS 4/21/2025 A0.01-ARCHITECTURAL LEGENDS 4/21/2025 AS101-ARCHITECTURAL SITE PLAN 4/21/2025 AS711-SITE DETAILS 4/21/2025 AS712-SITE DETAILS 4/21/2025 CA 101 AIRNASIUM SITE PLAN 4/21/2025 CA 201 AIRNASIUM FIELD DRAINAGE PLAN 4/21/2025 CA 301 AIRNASIUM FIELD SUBGRADE GRADING PLAN 4/21/2025 CA 302 AIRNASIUM FIELD STONE GRADING PLAN 4/21/2025 CA 401 AIRNASIUM DETAILS 4/21/2025 A100-GRID GEOMETRY-OVERALL 4/21/2025 A101-SLAB PLAN-AREA A 4/21/2025 A102-SLAB PLAN-AREA B 4/21/2025 A103-SLAB PLAN-AREA C 4/21/2025 A104-SLAB PLAN-AREA D 4/21/2025 A105-SLAB PLAN-LEVEL 2-AREA B 4/21/2025 A106-SLAB PLAN-MEZZANINE-AREA C 4/21/2025 A110-LEVEL 1 FLOOR PLAN-OVERALL 4/21/2025 A111-LEVEL 1 FLOOR PLAN AREA A 4/21/2025 A112-LEVEL 1 FLOOR PLAN-AREA B 4/21/2025 A113-LEVEL 1 FLOOR PLAN-AREA C 4/21/2025 A114-LEVEL 1 FLOOR PLAN-AREA D 4/21/2025 A120-LEVEL 2 FLOOR PLAN-OVERALL 4/21/2025 A121-LEVEL 2 FLOOR PLAN-AREA B 4/21/2025 A122-MEZZANINE LEVEL FLOOR PLAN-AREA C 4/21/2025 A123-LEVEL 2 FLOOR PLAN-BRIDGE 4/21/2025 A123 ALT#1-LEVEL 2 FLOOR PLAN-BRIDGE 4/21/2025 A210-LEVEL 1 CEILING PLAN-OVERALL 4/21/2025 A211-LEVEL 1 CEILING PLAN -AREA A 4/21/2025 A212-LEVEL 1 CEILING PLAN-AREA B 4/21/2025 A213-LEVEL 1 CEILING PLAN-AREA C 4/21/2025 A214-LEVEL 1 CEILING PLAN-AREA D 4/21/2025 A220-LEVEL 2 CEILING PLAN -OVERALL 4/21/2025 A221-LEVEL 2 CEILING PLAN-AREA B 4/21/2025 A222-MEZZANINE LEVEL CEILING PLAN AREA C 4/21/2025 A301 -ROOF PLAN-OVERALL 4/21/2025 A301A-ROOF PLAN-AREA A 4/21/2025 A301B-ROOF PLAN-AREA B 4/21/2025 A301C-ROOF PLAN-AREA C 4/21/2025 A301D-ROOF PLAN-AREA D 4/21/2025 A311-ROOF DETAILS(MOD. BIT) 4/21/2025 A312-ROOF DETAILS(METAL PANEL) 4/21/2025 A401-ENLARGED FLOOR PLANS 4/21/2025 A402-ENLARGED FLOOR PLANS 4/21/2025 A405-ENLARGED CEILING PLANS 4/21/2025 A410-ENLARGED STAIRS 4/21/2025 A411-ENLARGED STAIRS 4/21/2025 A412-ENLARGED STAIRS 4/21/2025 A413-ENLARGED STAIRS 4/21/2025 A414-ENLARGED STAIRS 4/21/2025 A415-ENLARGED STAIRS 4/21/2025 A430-STAIRS DETAILS 4/21/2025 A500-MATERIALS SELECTION SUMMARY EXTERIOR 4/21/2025 A501-EXTERIOR ELEVATIONS OVERALL 4/21/2025 A511-EXTERIOR ELEVATIONS AREAA 4/21/2025 A512-EXTERIOR ELEVATIONS AREAA 4/21/2025 A513-EXTERIOR ELEVATIONS AREA B 4/21/2025 A514-EXTERIOR ELEVATIONS AREA B 4/21/2025 A515-EXTERIOR ELEVATIONS AREA B 4/21/2025 A516-EXTERIOR ELEVATIONS AREA C 4/21/2025 A517-EXTERIOR ELEVATIONS-AREA C 4/21/2025 A518-EXTERIOR ELEVATIONS-AREA D 4/21/2025 A519-EXTERIOR ELEVATIONS AREA D 4/21/2025 A520-EXTERIOR ELEVATIONS-BRIDGE 4/21/2025 A521-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A522-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A523-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A524-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A525-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A526-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A527-ENLARGED EXTI RIOR E LEVATIONS 4/21/2025 A528-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A529-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A601-BUILDING SECTIONS 4/21/2025 A602-BUILDING SI CTIONS 4/21/2025 A603-BUILDING SECTIONS 4/21/2025 A604-BUILDING SECTIONS 4/21/2025 A621-WALL SECTIONS AREA B 4/21/2025 A622-WALL SECTIONS AREA B 4/21/2025 A623-WALL SECTIONS AREA B 4/21/2025 A624-WALL SECTIONS AREA C 4/21/2025 A625-WALL SECTIONS AREA C 4/21/2025 A626-WALL SECTIONS AREA C 4/21/2025 A627-WALL SECTIONS AREA D 4/21/2025 A628-WALL SECTIONS AREA D 4/21/2025 A701-PLAN DETAILS-EXTERIOR-AREA B 4/21/2025 A702-PLAN DETAILS-EXTERIOR-AREA B 4/21/2025 A703-PLAN DETAILS-EXTERIOR-AREA B 4/21/2025 A704-PLAN DETAILS INTERIOR-AREA B 4/21/2025 A705-PLAN DETAILS INTERIOR-AREA B 4/21/2025 A706-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A707-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A708-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A709-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A710-PLAN DETAILS INTERIOR-AREA C 4/21/2025 A711-PLAN DETAILS INTERIOR-AREA C 4/21/2025 A712-PLAN DETAILS EXTERIOR-AREA D 4/21/2025 A713-PLAN DETAILS INTERIOR-AREA D 4/21/2025 A715-WALL SECTIONS DETAILS 4/21/2025 A716-WALL SECTIONS DETAILS 4/21/2025 A717-WALL SECTIONS DETAILS 4/21/2025 A718-WALL SECTIONS DETAILS 4/21/2025 A719-WALL SECTIONS DETAILS 4/21/2025 A720-WALL SECTIONS DETAILS 4/21/2025 A725-ENLARGED DETAILS-PORTALS 4/21/2025 A726-ENLARGED DETAILS-PORTALS 4/21/2025 A727-ENLARGED DETAILS-RECEPTION 4/21/2025 A728-ENLARGED DETAILS-RECEPTION 4/21/2025 A729-ENLARGED DETAILS-RECEPTION 4/21/2025 A731-DETAILS-SHOWER 4/21/2025 A732-DETAILS-METAL FABRICATION 4/21/2025 A733-ELEVATION-METAL FABRICATION 4/21/2025 A734-DETAILS-METAL FABRICATION 4/21/2025 A735-CEILING DETAILS 4/21/2025 A740-PLINTH DETAILS 4/21/2025 A801-PARTITION TYPES 4/21/2025 A801A-PARTITION TYPES 4/21/2025 A8018-PARTITION TYPES 4/21/2025 A802-PARTITION HEAD AND FRAMING DETAILS 4/21/2025 A810-DOOR SCHEDULES AND TYPES 4/21/2025 A811-DOOR DETAILS 4/21/2025 A820-GLAZING TYPES EXTERIOR 4/21/2025 A821-GLAZING TYPES INTERIOR 4/21/2025 A831-GLAZING&LOUVER DETAILS 4/21/2025 A840•CASEWORK TYPES 4/21/2025 A841 -CASEWORK SCHEDULE 4/21/2025 A844-MILLWORK DETAILS 4/21/2025 A845-MILLWORK DETAILS 4/21/2025 A900-LEVEL 1 FINISH FLOOR PLAN OVERALL 4/21/2025 A901-LEVEL 1 FINISH FLOOR PLAN AREA A 4/21/2025 A902-LEVEL 1 FINISH FLOOR PLAN AREA B 4/21/2025 A903-LEVEL 1 FINISH FLOOR PLAN AREA C 4/21/2025 A904-LEVEL 1 FINISH FLOOR PLAN AREA D 4/21/2025 A905-LEVEL 2 FINISH FLOOR PLAN OVERALL 4/21/2025 A906- LEVEL 2 FINISH FLOOR PLAN -AREA B 4/21/2025 A907-MEZZANINE LEVEL FINISH FLOOR PLAN AREA C 4/21/2025 A908-STRIPING PLAN-AREA C 4/21/2025 A910-ROOM FINISH SCHEDULE&TRANSITION DETAILS 4/21/2025 A911-MATERIALS SELECTION SUMMARY-INTERIORS 4/21/2025 A920-INTERIOR ELEVATIONS AREA A 4/21/2025 A921-INTERIOR ELEVATIONS AREA A 4/21/2025 A922-INTERIOR ELEVATIONS AREA B 4/21/2025 A923-INTERIOR ELEVATIONS AREA B 4/21/2025 A924-INTERIOR ELEVATIONS AREA B 4/21/2025 A925-INTERIOR ELEVATIONS AREA B-LEVEL 2 4/21/2025 A926-INTERIOR ELEVATIONS AREA C 4/21/2025 A927-INTERIOR ELEVATIONS AREA C 4/21/2025 A928-INTERIOR ELEVATIONS AREA C 4/21/2025 A929-INTERIOR ELEVATIONS AREA C 4/21/2025 A930-INTERIOR ELEVATIONS AREA C 4/21/2025 A931-INTERIOR ELEVATIONS AREA C 4/21/2025 A932-INTERIOR ELEVATIONS AREA C-MEZZANINE 4/21/2025 A936-INTERIOR ELEVATIONS AREA D 4/21/2025 A937-INTERIOR ELEVATIONS AREA D 4/21/2025 A938-INTERIOR ELEVATIONS AREA D 4/21/2025 AE01-FITNESS EQUIPMENT PLANS 4/21/2025 S-000-3DVIEW&SHEET LIST 4/21/2025 S-010-GENERAL NOTES 4/21/2025 S-011-GENERAL NOTES 4/21/2025 S-012-GENERAL NOTES 4/21/2025 S-013-GENERAL SUBGRADE NOTES AND TYP DETAILS 4/21/2025 S-101-COMPOSITE FOUNDATION PLAN 4/21/2025 S-101A-FOUNDATION PLAN-AREA A 4/21/2025 S-101B-FOUNDATION PLAN-AREA B 4/21/2025 S-101C-FOUNDATION PLAN-AREA C 4/21/2025 S-101D-FOUNDATION PLAN-AREA D 4/21/2025 S-101M-FOUNDATION PLAN-MISC 4/21/2025 S-102-COMPOSITE Sf COND FLOOR FRAMING PLAN 4/21/2025 S-102B-SECOND FLOOR AND LOW ROOF FRAMING PLAN-AREA B 4/21/2025 S-102C-MEZZANINE AND LOW ROOF FRAMING PLAN-AREA C 4/21/2025 S-102D•LOW ROOF FRAMING PLAN-AREA D 4/21/2025