Texas Government Code Section 2269.056(a) requires the "governing body of a governmental entity that considers a
construction contract using a method authorized by this chapter other than competitive bidding must, before advertising,
determine which method provides the best value for the governmental entity.
Pursuant to Section 2269.053, the Round Rock City Council delegated its authority to determine whether an alternative
project delivery method provides the best value to the municipality to the City Manager by Resolution No. 2024-274.
The City of Round Rock desires to use an alternative method other than competitive bidding when entering into a
contract for the West Transmission Main Valve Replacement Project ("Project").
Chapter 2269 requires that a project -by -project determination be made as to what method provides the best value for
the governmental entity in relation to a particular project.
The City Manager has determined that the Project would be best served by utilizing the Competitive Sealed Proposal
method.
Legislative No. CM-2025-216
Requester: Michael Thane
Request Date:8/25/2025
d�4
Brooks Bennett, City Manage
Date Approved: 8/29/2025
CITY OF ROUND ROCK 221 East Main Street, Round Rock, Texas 78664
[P] S12.218.5401 . [F] 512.218.7097. roundrocktexas.gov
42-inch Gate Valve to be installed
Ak—
Vit'.�� .. ,'�
�
i l�
w J
'"' � ,A
-+may
40
�. • - -
- I . qr
— Ilk �.
;i 3600 ,
• ��
ra e,
24
� 9{ ;�"ik. ;tl.. `mac'' F t ��� f •�+� �+ �.� �
D Butterfly
O Gate West Transmission Main Valve Replacement OUNOROCKTD(AS
Water Line - CORR