CM-2025-222 - 9/12/2025Supplemental Contract 0199.20202; 4933-7915-4787 Rev.06/16 84275 1 STATE OF TEXAS § § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: AGUIRRE & FIELDS, LP (“Engineer”) ADDRESS: 12708 Riata Vista Circle, Suite A-109, Austin, TX 78727 PROJECT: Old Settlers Extension This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the “City” and Aguirre & Fields, LP, hereinafter called the “Engineer.” WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the “Contract,” on the 13th day of February, 2020 for the Old Settlers Extension Project in the amount of $532,331.53; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on October 28, 2021 to amend the scope of services and to increase the compensation by $934,919.70 to a total of $1,467,251.23; and WHEREAS, , the City and Engineer executed Supplemental Contract No. 2 on March 28, 2024 to amend the scope of services and to increase the compensation by $178,285.80 to a total of $1,645,537.03; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $74,080.00 to a total of $1,719,617.03; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $74,080.00 the lump sum amount payable under the Contract for a total of $1,719,617.03, as shown by the attached Addendum to Exhibit D. CM-2025-222 Supplemental Contract 0199.20202; 4933-7915-4787 Rev.06/16 84275 2 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. AGUIRRE & FIELDS, LP By: Date Oscar R Aguirre (Sep 5, 2025 16:31:47 CDT) Oscar R Aguirre Oscar R Aguirre President of Aguirre, LLC-GP 09/05/2025 Supplemental Contract 0199.20202; 4933-7915-4787 Rev.06/16 84275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: Stephanie L. Sandre, City Attorney Printed Name: Title: Date Signed: Brooks Bennett (Sep 12, 2025 15:41:34 CDT) Brooks Bennett City Manager 09/12/2025 ADDENDUM TO EXHIBIT B Engineering Services The ENGINEER will provide the following supplemental construction phase services under this agreement: 1. Additional time and effort required for bid questions and bid tab verification. 2. Additional time and effort required for construction submittal reviews. 3. Additional time and effort required for As-Builts. 4. Plan Revision #1 (Oasis Connection). 5. Change Order #1 (WL crossing Old Settlers and material changes). 6. Change Order #2 (WL depth revision due to new gas line). ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page AGUIRRE & FIELDS, LP CONTRACT: SWA 03 TO WA 01 ADDENDUM TO EXHIBIT D - SWA 03 FEE SCHEDULE AGUIRRE & FIELDS, LP CITY OF ROUND ROCK OLD SETTLERS EXTENSION PROJECT: OLD SETTLERS EXTENSION METHOD OF PAYMENT: LUMP SUM PRIME PROVIDER: AGUIRRE & FIELDS, LP COMPANY FEE % OF TOTAL FEE AGUIRRE & FIELDS, LP $42,080.00 57% HALFF ASSOCIATES $32,000.00 43% TOTAL $74,080.00 100.00% PAGE 1 OF 1 PAGE 1 OF 1 AGUIRRE & FIELDS, LP CONTRACT: SWA 03 TO WA 01 ADDENDUM TO EXHIBIT D - SWA 03 FEE SCHEDULE AGUIRRE & FIELDS, LP CITY OF ROUND ROCK OLD SETTLERS EXTENSION PRIME PROVIDER NAME: AGUIRRE & FIELDS, LP TASK DESCRIPTION PROJECT MANAGER PROJECT ENGINEER ENGINEER IN TRAINING SENIOR ENGINEER TECHNICIAN CADD OPERATOR ADMIN / CLERICAL TOTAL LABOR HOURS & COSTS FC 309 - CONSTRUCTION PHASE SERVICES PRE-CONSTRUCTION BID QUESTIONS & BID VERIFICATION 12 24 10 46 CONSTRUCTION CONSTRUCTION SUBMITTALS REVIEW 14 40 32 86 CHANGE ORDERS 5 11 14 8 10 48 POST-CONSTRUCTION AS-BUILTS/RECORD DRAWINGS 9 11 8 10 10 48 HOURS SUB-TOTALS 40 86 64 18 20 0 228 CONTRACT RATE PER HOUR $290.00 $195.00 $125.00 $195.00 $110.00 $100.00 TOTAL LABOR COSTS $11,600.00 $16,770.00 $8,000.00 $3,510.00 $2,200.00 $0.00 $42,080.00 % DISTRIBUTION OF STAFFING 17.5% 37.7% 28.1% 7.9% 8.8% 0.0% SUBTOTAL (FC 309) $42,080.00 DESCRIPTION TOTAL MH BY FC TOTAL COSTS BY FC FC 309 - CONSTRUCTION PHASE SERVICES 228 $42,080.00 SUBTOTAL LABOR EXPENSES 228 $42,080.00 SUMMARY TOTAL COSTS FOR PRIME ONLY $42,080.00 NON-SALARY (OTHER DIRECT EXPENSES) FOR PRIME ONLY - GRAND TOTAL FOR PRIME $42,080.00 PAGE 3 OF 3 AGUIRRE & FIELDS, LP CONTRACT: SWA 03 TO WA 01 ADDENDUM TO EXHIBIT D - SWA 03 FEE SCHEDULE AGUIRRE & FIELDS, LP CITY OF ROUND ROCK OLD SETTLERS EXTENSION SUB PROVIDER NAME: HALFF ASSOCIATES TASK DESCRIPTION SR PROJECT MANAGER PROJECT ENGINEER GRADUATE ENGINEER (EIT) CONTRACT ADMIN SPECIALIST TOTAL LABOR HOURS & COSTS FC 309 - CONSTRUCTION PHASE SERVICES CONSTRUCTION PLAN REVISIONS 12 8 20 CHANGE ORDERS 58 42 50 150 POST-CONSTRUCTION AS-BUILTS/RECORD DRAWINGS 40 40 HOURS SUB-TOTALS 70 50 90 0 210 CONTRACT RATE PER HOUR $200.00 $180.00 $100.00 $85.00 TOTAL LABOR COSTS $14,000.00 $9,000.00 $9,000.00 $0.00 $32,000.00 % DISTRIBUTION OF STAFFING 33.3% 23.8% 42.9% 0.0% SUBTOTAL (FC 309) $32,000.00 DESCRIPTION TOTAL MH BY FC TOTAL COSTS BY FC FC 309 - CONSTRUCTION PHASE SERVICES 210 $32,000.00 SUBTOTAL LABOR EXPENSES 210 $32,000.00 SUMMARY LABOR COSTS FOR SUB CONSULTANT $32,000.00 NON-SALARY (OTHER DIRECT EXPENSES) FOR SUB CONSULTANT - GRAND TOTAL FOR SUBCONSULTANT $32,000.00