New Hope Drive 72-Inch Water Main Section 00500—Agreement
Settlement Remediation Project
1.0 THE WORK OF THIS CONTRACT
Unless otherwise provided in the Contract Documents, the CONTRACTOR shall be
responsible for performing or causing to be performed all Work including labor and
materials, necessary to build, construct, erect and equip the Project in accordance with
the Contract Documents and, at its own cost and expense, to furnish all the materials,
supplies, machinery, equipment, tools, superintendence, labor, insurance, and other
accessories and services necessary to complete the said construction, in accordance with
the Contract Documents and for the Contract Price defined in Section 3.0 of this
Agreement .
The Contract Documents for this Project include this Agreement and the following
documents:
• Modifications
• General Conditions (Section 00700)
• Specifications
• Drawings
• Addenda (Section 00900)
• Performance Bond (Section 00610)
• Payment Bond (Section 00620)
• Maintenance Bond (Section 00630)
• Proposal Form (Section 00300)
• Conflict of Interest Questionnaire (Section 00300-A)
• Statement of Proposers Experience (Section 00400)
• Notice of Award (Section 00510)
• Notice to Proceed (Section 00520)
• Contractor's Certificate of Insurance
• All other documents referenced in the Request for Competitive Sealed Proposals
for the Project
In addition to the provisions set forth in other Contract Documents, including but not
limited to Section 3.03 of the General Conditions,in the event that a conflict between any
of the provisions within the Contract Documents exist, OWNER shall determine which
provision controls. If CONTRACTOR identifies the conflict, CONTRACTOR shall notify
Owner's representative of the conflict, in writing.
The Contract Documents are forms adopted by Owner and are not subject to negotiation,
modification or change unless Owner, in its sole discretion, agrees to do so.
Page 2 of 9
Section 00500—Agreement
New Hope Drive 72-Inch Wate'Mair Sect on 00500—Ag•eement
Settlement Remediation Project
2.0 CONTRACT TIME AND COMPLE'T'ION
§ 2.1 The date of commencement of the Work shall be stated in a Notice to Proceed
issued by the OWNER.
§ 2.2 Contract Time
§2.2.1 The Contract Time shall be measured from the date of commencement.
§2.2.2 Time is of the essence in all phases of the Work. Additionally, time limits
and periods of time stated in the Contract Documents are of the essence. It is
specifically understood and agreed to by and between OWNER and CONTRACTOR
that time is of the essence in the substantial and final completion of the Work,
and that failure to substantially complete or finally complete the Work within the
designated period, or as it may be extended,shall be construed as a breach of this
Agreement.
§ 2.3 Substantial Completion
The CONTRACTOR shall achieve Substantial Completion, as that term is defined in
the Contract Documents, of the entire Work not later than 45 calendar days from
the date of commencement, subject to any adjustments of this Contract Time as
provided in the Contract Documents.
§2.4 Liquidated Damages
The CONTRACTOR acknowledges and recognizes that the OWNER is entitled to full
and beneficial occupancy and use of the completed Work following expiration of
the Contract Time. The CONTRACTOR further acknowledges and agrees that, if
the CONTRACTOR fails to achieve Substantial Completion of any portion of the
Work within the Contract time,the OWNER will sustain actual damages as a result
of such failure. OWNER and CONTRACTOR agree that the exact amount of such
damages will be difficult, if not impossible, to ascertain. Therefore, the OWNER
and CONTRACTOR agree that, if the CONTRACTOR should fail,or refuse to achieve
Substantial Completion of the Work by the date of Substantial Completion,subject
to extensions of the Contract Time granted by the OWNER,then the CONTRACTOR
agrees to pay the OWNER the sum of
Five hundred dollars ($500)
for each day in which such Work is not Substantially Complete, not as penalty, but
as a reasonable estimation of the damages ("Liquidated Damages")that would be
suffered by OWNER as a result of delay for each and every calendar day that the
CONTRACTOR shall have failed to achieve Substantial Completion of the Work as
Page 3 of 9
Section 00500—Agreement
New Hope Drive 72-Inch Water Main Section 00500—Agreement
Settlement Remediation Project
required herein. The Liquidated Damages shall be in lieu of any and all other
damages which may be incurred by OWNER as a result of the failure of
CONTRACTOR to achieve Substantial Completion of the Work within the Contract
Time.
§ 2.5 Final Completion
§ 2.5.1 Timely Final Completion is an essential condition of this Agreement.
CONTRACTOR agrees to achieve Final Completion of the Work within 15 days of
the designated or extended date of Substantial Completion.
§2.5.2 Final Completion means actual completion of the Work, including any
extras or Change Orders reasonably required or contemplated under the Contract
Documents other than warranty work that may be required pursuant to the
Contract Documents.
3.0 CONTRACT PRICE
§ 3.1 The OWNER shall pay the CONTRACTOR the Contract Price in current funds for the
CONTRACTOR's proper and complete performance of the Work and all of CONTRACTOR's
obligations under the Contract Documents. The Contract Price shall be six hundred and
seven thousand six hundred and thirty-four dollars zero cents($607,634.00), subject to
additions and deductions as provided in the Contract Documents.
§ 3.2 The Contract Price is based upon the following alternates,if any,which are described
in the Contract Documents and are hereby accepted by the OWNER:
Page 4 o6 9
Section 00500—Agreement
New Hope Drive 72-Inch Water Main Section 00500-Agreement
Settlement Remediation Project
§3.3 Unit prices, if any:
ITEM DESCRIPTION UNIT QUANTITY UNIT COST
MOBILIZATION AND DEMOBILIZATION LS 1 $ 24 000.00
REMOVE P.C.CONCRETE CURB LF 442 $ 23.00
REMOVE P.C.CONCRETE SIDEWALKS AND DRIVEWAYS SF 4275 $ 4.50
STREET EXCAVATION CY 941 $ 52.00
HOT MIX ASPHALT CONC PVMT 18' TY B BASE 50% SY 584 $ 170.00
HOT MIX ASPHALT CONC PVMT(22")(TY B)(BASE)(25%) SY 292 S 210.00
HOT MIX ASPHALT CONC PVMT 26" TY B BASE 25% SY 292 $ 250.00
12-INCH COMP THICKNESS FLEX BASE CY 158 S 200.00
PRIME COAT MC-30 GAL 495 $ 19.00
SURFACE MILLING SY 1308 $ 20.00
HOT MIX ASPHALT CONC PVMT 2" C SURF SY 2476 $ 29.50
P.C.CONC CURB AND GUTTER LF 442 $ 45.00
P.C.CUNC SIDEWALK SF 4:75 $ y.50
P.C.SIDEWALK CURB RAMP WIPAVERS TY I EA 3 $ 2,700,00
MULCH SOCK LF 95 $ 14.00
FURNISH AND INSTALL SILT FENCE LF 1200 $ 4.00
BERMUDA BLOCK SODDING SY 475 $ 7.00
REFL PAV MRK TY 11 PREFERENTIAL DIRECTIONAL ARROW SYMBOL W EA 2 $ 350.00
REFL PAV MRK TY 11 BICYCLE LANE BIKE RIDER SYMBOL EA 2 $ 350.00
REFL PAV MRK TY II W BRK 4" LF 295 $ 2.50
REFL PAV MRK TY II W DOT 4' LF 149 $ 2.50
REFL PAV MRK TY II W SLD 6" LF 482 $ 2.50
REFL PAV MRK TY II W SLD 8" LF 291 $ 3.00
REFL PAV MRK TY II W SLD 12" LF 285 $ 8.00
REFL PAV MRK TY II W SLD 24' LF 89 $ 15.00
REFL PAV MRK TY II W WORQ EA 1 $ 400.00
REFL PAV MRK TY 11(WI(W)(ARROWI EA 1 $ 400.00
REFL PAV MRK TY II W RR XING EA 2 $ 700.40
REFL PAV MRK TY I-C EA 18 $ 15.00
ELIM EXIST PAV MRK&MRKS (4'J LF 444 $ 1.00
ELIM EXIST PAV MRK&MRKS 6" LF 482 $ 1.50
FLIM EXIST RAV MRK&MRKS 8' LF 291 $ 1.50
FLIM EXIST PAV MRK&MRKS 12" LF 285 $ 2.50
ELIM EXIST PAV MRK&MRKS 24" LF 89 $ 5.00
BARRICADES.SIGNS AND TRAFFIC HANDLING MO 1 $ 40,000.00
Page 5 of 9
Section 00500-Agreement
New Mope Drive 72-Inch Water Main Section 40500—Agreement
Settlement Remediation Project
4.0 PAYMENT
§4.1 APPLICATIONS FOR PAYMENT
Subject to any applicable provisions set forth in other Contract Documents, each
Application for Payment shall be based on the most recent schedule of values ("Schedule
of Values") submitted by the CONTRACTOR in accordance with the Contract Documents.
The Schedule of Values shall allocate the entire Contract Price among the various portions
of the Work. The Schedule of Values shall be prepared in such form and supported by
such data to substantiate its accuracy as the ENGINEER and OWNER may require. The
Schedule of Values, as approved by the ENGINEER or OWNER, shall be used as a basis for
reviewing the CONTRACTOR's Applications for Payment. As the Work progresses the
Schedule of Values may be revised as the OWNER and ENGINEER, in their sole discretion,
may deem appropriate to reflect the sequencing of the Work and the values to be
assigned to each portion of the Work included in the Schedule of Values.
§4.1.1 Applications for Payment shall show the percentage of completion of each portion
of the Work as of the end of the period covered by the Application for Payment. Subject
to the provisions of the General Conditions, the CONTRACTOR shall prepare its
Application for Payment for a progress payment as of the last day of each calendar month
and submit it, with the required number of copies, to the Engineer for review. The total
value of work completed to date shall be based on the actual or estimated quantities of
Work completed and, if applicable, on the unit prices contained in the Agreement (or
approved schedule of values relating to lump sum bids)and adjusted by approved Change
Orders. The value of materials properly stored on the site shall be based upon the
estimated quantities of such materials and the invoice prices. Copies of all invoices shall
be available for inspection by the ENGINEER.
§4.1.2 Subject to other provisions of the Contract Documents, the amount of each
progress payment shall be computed as follows:
.1 Take that portion of the Contract Price properly allocable to completed
Work as determined by multiplying the percentage completion of each
portion of the Work by the share of the Contract Price allocated to that
portion of the Work in the Schedule of Values, less retainage of Five
percent (5.00`0. Pending final determination of cost to the OWNER of
changes in the Work, amounts not in dispute shall be included;
.2 Add that portion of the Contract Price properly allocable to materials and
equipment delivered and suitably stored at the site for subsequent
incorporation in the completed construction(or, if approved in advance by
the OWNER, suitably stored off the site at a location agreed upon in
writing), less retainage of Five percent
.3 Subtract the aggregate of previous payments made by the OWNER; and
Page 6 of 9
Section 00500—Agreement
New Hope Drive 72-inch Water Main Sect on 00500—Agreement
Settlement Remediation Project
.4 Subtract amounts, if any,for which the ENGINEER has withheld or nullified
an Application for Payment.
§4.1.3 If the total Contract Price at the time of execution of this Agreement is less than
$400,000.00,the OWNER may elect to withhold retainage of ten percent(10%)from each
progress payment in lieu of the retainage amounts set forth in Section 4.1.2.
§4.1.4 The Contractor shall be responsible for the care and protection of all materials
and Work upon which payments have been made until final acceptance of such Work and
materials by the Owner. Such payments shall not constitute a waiver of the right of the
Owner to require the fulfillment of all terms of the Contract Documents and the delivery
of all improvements embraced in Contract Documents complete and satisfactory to the
Owner in all respects.
§4.1.5 Reduction or limitation of retainage, if any, shall be as follows: Reduction or
limitation of retainage shall be at the OWNER's sole discretion.
§4.1.6 Except with the OWNER's prior approval, the CONTRACTOR shall not make
advance payments to suppliers for materials or equipment which have not been delivered
and stored at the site.
§4.2 FINAL PAYMENT
§4.2.1 Final payment, constituting the entire unpaid balance of the Contract Price, shall
be made by the OWNER to the CONTRACTOR when:
.1 the CONTRACTOR has fully performed its obligations under the Contract
Documents, except for the CONTRACTOR's responsibility to correct Work
as provided in the General Conditions, and to satisfy other requirements,
if any, which extend beyond Final Payment; and
.2 a letter of Final Acceptance has been issued by the ENGINEER and accepted
by the OWNER.
.3 CONTRACTOR has satisfied all of the conditions to receipt of Final
Payment as set forth in the General Conditions.
§4.2.2 The OWNER's final payment to the CONTRACTOR shall be made no later than 30
days after the Work has been completed and accepted by the OWNER, in writing,
following the issuance of the ENGINEER's final Certificate for Payment:
Page 7 of 9
Section 00500—Agreement
New Mope Drive 72-Inch Water Main Section 00500—Agreement
Settlement Remediation Project
Page S of 4
Section 00500—Agreement
New Hope Drive 72-inch Water Main Section 00500—Agreement
Settlement Remediation Project
This Agreement is entered into as of the day and year written above ("The Date of Execution" or
"Effective Date of the Agreement"):
BRUSHY CREEK REGIONAL UTILITY AUTHORITY CONTRACTOR
B B
By: Y:
Name: Karen Bondy Name: Pi �l� ( d�ri P�, ►�
Title: General Manager Title:
Page 9 of 9
Section 00500--Agreement