Loading...
R-2025-264 - 10/9/2025 RESOLUTION NO. R-2025-264 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Plummer and Associates, Inc. for the BCRWWS East WWTP Tertiary Filters Preliminary Engineering Report (PER) Project, and WHEREAS, Plummer and Associates, Inc. has submitted Supplemental Contract No. 4 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 4 with Plummer and Associates, Inc.,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 4 to the Contract with Plummer and Associates, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of October, 2025. CRAI MOR AN,Mayor City f Roun ock, Texas A ST. AN FRANKLIN, City Clerk 0112.20252:4917-1268-6188 EXHIBIT A STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PLUMMER AND ASSOCIATES, INC. ("Engineer") ADDRESS: 8911 N Capital of TX Hwy, Building 1, Suite 1250,Austin, TX 78759 PROJECT: BCRWWS East WWTP Tertiary Filters Preliminary Engineering Report(PER) This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Plummer and Associates, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract,"on the 8th day of September, 2022 for the BCRWWS East WWTP Tertiary Filters Preliminary Engineering Report(PER) Project in the amount of$506,672.00; and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on September 14,2023 to amend the scope of services and to increase the compensation by $788,073.00 to a total of $1,294,745.00; and WHEREAS,the City and Engineer executed Supplemental Contract No. 2 on January 19, 2024 to amend the scope of services and to increase the compensation by $40,463.50 to a total of $1,335,208.50; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on July 25, 2024 to amend the scope of services and to increase the compensation by $561,302.00 to a total of $1,896,510.50; and WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $137,569.00 to a total of$2,034,079.50; NOW THEREFORE,premises considered,the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. Supplemental Contract Rev.06/16 0199.202236;4921-7395-4151 84275 1 II. Article 2,Engineering Services and Exhibit B.Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. III. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $137,569.00 the maximum amount payable under the Contract for a total of$2,034,079.50, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF,the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.202236;4921-7395-4151 84275 2 PLUMMER AND ASSOCIATES,INC. Digitally signed by Stephen J.Coonan,P.E. DN:C=US,E=scoonan@plummer.com, Stephen J. Coonan, P .O=Plummer,CN='Stephen J.Coonan,P.E.' Reason:I have reviewed this document By: Date:2025.09.10 19:33:12-05'00' Date Supplemental Contract Rev.06/16 0199.202236;4921-7395-4151 84275 3 ADDENDUM TO EXHIBIT A CITY SERVICES CITY OF ROUND ROCK BRUSHY CREEK REGIONAL WASTEWATER SYSTEM EAST PLANT—TERTIARY FILTERS CONSTRUCTION PHASE SERVICES SUPPLEMENTAL Per the scope of work documented in Exhibit B-Engineering Service,the City of Round Rock (CITY) responsibilities will include the following: • Continue to provide Plummer&Associates with requested information as needed, including, but not limited to as-built plans and specifications, previous Geotechnical reports, previous studies, record drawings, operational data, etc. • Provide Plummer with access to the CITY's facilities as needed to complete the work. • Review materials submitted by Plummer related to the project and provide comments back as requested. • Arrange for and coordinate regular meetings of the Project Partners for the review of information provided and to receive comments. • Manage material testing contractor UES Professional Solutions and provide any results back to Engineer in a timely manner. • Pay all State and local fees associated with the Tertiary Filters Project. • Provide assistance to the on-site personnel provided by consultants under this project as needed. • Obtain appropriate signatures on paperwork,including those from co-permittees as needed. 1 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES This Exhibit is part of the Agreement between Plummer Associates, Inc.(Plummer) (the"Engineer")and the City of Round Rock(the "Owner") for the project generally described as: Brushy Creek Regional Wastewater Treatment System East Plant(BCE)Tertiary Filters Construction Phase Services INTRODUCTION Due to the revised baseline schedule sent by the Contractor in July 2025,the construction duration has extended beyond the originally anticipated completion in July 2025.This supplemental provides additional engineering support services to continue construction administration through January 2026. This scope covers continued support and coordination with the City, Contractor, and stakeholders during the construction phase, excluding services already budgeted under post-construction and integration tasks.The original scope covered 150 submittals (current total to date is 189) and 50 RFIs (current total to date is 58). Budgeted hours and fees for Post-Construction Services (e.g., startup, record drawings, O&M manual development)and SCADA Integration are not impacted and will be funded by the existing authorization. 1 ENGINEERING SERVICES DURING CONSTRUCTION 1.1 CONSTRUCTION PROGRESS MEETINGS Engineer will attend and facilitate up to five (5) additional monthly 1-hour construction progress meetings between August and December 2025. It is assumed that the Project Manager, one engineer,and one engineer-in-training may attend each construction progress meeting from the Engineer's team.The Engineer will facilitate, prepare agenda,and distribute meeting minutes for all progress meetings. Progress meeting agendas will include RFI and submittal logs.The Contractor is responsible for providing schedule updates, 3-week lookahead schedule, review progress since the last meeting.The Contractor will also inform whether each activity is on time, ahead of schedule, or behind schedule with respect to the construction schedule. 1.2 SITE VISITS Engineer will conduct up to five(5)additional monthly site visits to observe construction progress, review conformance with design intent, and identify any quality or coordination issues. Each visit will include a brief field report with photos and observations. Special attention will be given to yard piping installations, canopy erection, equipment placement, electrical installations, and tertiary filters startup readiness. 1 1.3 DOCUMENT REVIEW Engineer will provide ongoing review and response for the following additional items anticipated due to the extended construction: • Review of up to fifty-five(55)additional submittals and resubmittals • Response to up to twenty-five(25)additional Requests for Information(RFIs) • Evaluation of up to five(5)additional substitution requests Reviews will be conducted for conformance with the contract documents and alignment with the design intent. Reviews exceeding the quantities listed above will be considered additional services. 1.4 CHANGE ORDERS The Engineer will provide technical review and documentation for: • Up to three(3)additional contractor-initiated change order proposals • Up to ten (10)additional clarifications or field orders This scope includes evaluating the merit and technical basis of proposed changes, preparing supporting documentation,and assisting with coordination and implementation.The Engineer will work closely with the City to maintain project continuity and effectively address field-driven modifications. Requests exceeding these quantities will be considered additional services. 1.5 REJECTION OF WORK: Engineer will support the City and Construction Manager in documenting and addressing any required rejections of non-conforming work.This includes engineering review of field issues, coordination with Contractor, and preparation of supporting documentation. 2 PROJECT MANAGEMENT AND QUALITY CONTROL The Engineer will maintain oversight and coordination responsibilities throughout the extended construction period. Activities will include: • Updating action items,and track construction progress. • Issuing monthly progress updates summarizing task completion,outstanding issues,and budget status. • Facilitating coordination among design,construction,and quality control teams to ensure timely resolution of technical issues and submittal reviews. ASSUMPTIONS: I. CONTRACTOR REQUESTS Investigations, analyses, studies, or design for substitutions of equipment or materials, corrections of defective or deficient work of the contractor or other deviations from the construction contract documents requested by the contractor and approved by the City are additional services. 2 II. ADDITIONAL ENGINEERING REVIEWS The fee is based on the Submittal Reviews, RFIs,and CMRs listed above. If additional reviews are necessary, due to incomplete submittals, or multiple review iterations, and if the RFIs and requested changes are beyond the estimated amounts, such that the combined budgeted fee for these items is exceeded, this will be considered an additional service.The substitution of materials or equipment or design modifications requested by the City are an additional service. III. QUALITY ASSURANCE TASKS FOR SERVICES NOT LISTED Engineer will NOT provide Quality Assurance tasks associated with geotechnical,special inspections and additional survey services. 3 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page Exhibit C-Project Schedule Brushy Creek WWTP Tertiary Filter i 23-Jul-25 10:44 info .,' _.-T-.`s 1 „ I --)L-,: I ., „ I „ I i I • I • I e I • 'I . i I"�, ( ., il ,� I ., i-1 t • 1 • 1 -I[ I T ^ l• k b=-2r8.{7iiNA�DtLS[. I e_Rhl�;raat __ 2272aasmg4A - 23JaF28;gamily Camels 328235ep24A 26Dec.25 28Op28Caacker SotaesIM2046 M310 Contract Day TnackaS Substantial 32823Sp24A 28Deo-25 caaeawyTrmkr 91aalnW-Z/OvBRI'(11)7Z8 M320 NTP 023-Sp24A • • M520 Repave Bypass --__- • _... ........ • --.-- -_. -..--. -..--. -. ...... -... Approved Plen from CORR 028Ju1-25' _.... .... 4444A9pwaE Bypass Plan fren CORK _... ........__... _.__.___.__ • M890 Remove Approved Canopy ID'wings 004Aug25' 04Au9.25 'Redeye Approved Canopy Demands • • 206080d24A 31JuL25 31Ju426,PraMansntl A3750 Submittals 80080d24A 21Ju125 'Submll1b • A3810 FRP PO 8'ham Lead Time 70080d24A 2241ay-25A l A4610Regave Slide Do` 031Ju1-25- •'.Red.4i S1.iiii ... ............. ... ........... .............. ........ ................. .. ....... ... ......-....... .... ...........L .............. ..............}-..__..........-..._-..._--.....-.._._....L.._._.. --.. 14 23-San A 100-24 A A3770 (1.)Mpbim 123Sep24 A 23Sep-24A A3230 See Layout Survey.Locales 323Sp24A 100ct-24A A3780 (1e)Prep Yard and Job Office 323Sp-24A 25Sep24A A3780 (Ba)Receive end Stare Disk FlIers 2235p24A 090ot24A ............ ......_........ .--__ _ .__-... _---. --_-. -..._. .............. ..._...., ...._...._.._... _ ._.__.._. , ._...._..__.._ 340 28Seo24 A 23Jan-28 : 23Jae2ei Plum 1 A3955 (21k)Tree 8 Finsh Removal 514-0d-24A 18-0d24A M 130 (4aNW49 dh)Rolse Walls an JB'c 2913Nw24A 2]-0eu26A • llt'4YIa.CYT4ylaai6a28CbA� ...._ ..... .- __. ....... _ 14Nm'-45A19868N ilr$VMfaae,,,,,,,-... -1 - .......... ....................... ....._............_I..__... A3960(NB Excavate Ted.Re 728-Sep,24A 18Jp25A --- A3900(3d)FRP Channel Slab Tart Fltr 4013l4w-24A 23Jan-Jan A3960(3e)Subpraie Pep TeIt Fb 2017-040-24A 17Je1-25A 1 M330 Install Shoring at Re Structure Excavation 313Jmr-26A 16Jarv25A j M000(3e)FRP EuSlol Wells Ted.Re 7124-Jan-25A 02JAry-25A i A4010(3d)FRP Slab Tat Fltr 1024-Jar25A 08Feb-25A M020(3s)FRP EB Charnel Wells Tat Fltr 7124Jan-25A 02JMY25A • i• , • A39,30(3e)FRP hterbrWelb Tert Fb 1514Feb25A 02-May.25A • M040(31)FRP EIw.W.IDeay Ted.Flb 719May 25A 2384Y26A • A4540 84.FRP Wall Pipe.smell 5 02Jul-25A 14-.1ul-25 A W FR1 WS PIP.101161 I ....... ................ d ...... : - ... .. ....._._.... ..... _. /MO60(3)La*TaeBrg TM Fla Saucer.Ededp ]2Nu1-25 01Aug-Aug alaaWaYr11)Laak Yad TM1 Fb 58 ra Fiaaddr A4090(3c)Baddll Tart Fit Stneune 408Aug26 11Aug-25 a(3c)soma Tat Fib Shot*. ' ',: ......-._..- • • A4030(3d)FRP Pump Rm and Eff Chamber Decks Ted.Far 408Aug-25 13Aug26 —(3d)FRP Pumpm an Rd':. Chamber Deco Ee Chb list Fltr ": M 110(39)ksbll 1eM1 Fb Stelrs 3144u925 18Aug-25 (30)satallAM1 Fir Slob. • M600 Grout FFoI Tat Fltr 314Au925 14Aup25 l �Groot 6 S156Ile • ... ....... ............ -- ___-. ---- - A4550 Ted.ReWal kveys 418Aug25 22Aup25 Tel FItrWsf4waya ..........._ .._.... r.............._......... M070(311)Terc Fb Canopy 2013-0d25 07Nov25 '': (319 Tart Fla Canopy A4050(18a)Install Bridge Crane 5 10Nw-25 14Nov25 (18a)Install Bridpe Crane , M570 Tel.FltrHanealls 510Nw-25 14+1w-25 Tel.Rat-laRat-lRat-lanky. • :f':3.L.S177Pn1C4.110011. M _...... _... ._......... ..._........._... tnceP,26.F,M7oloro_ __ __..._ t......... A39 (21c)Install Dein lines Tent Fly 15280ec-24A 13Jan-25A MN Inst/5140 Gales 1301 8 1401 5 20Aug25 28-Aug-26 —heel Slide Gates 13018 1401 ANY (5.5b)Instill Tetuan/Filters 3 18-Sep-25 18-Sep25 —(5e-5b)Install'WNany FMn A411 (5c0d)Install Tel Ft Pumps and Prying 518Sp25 22Sep-25 (5o5d)httall Tat Fb Pumps and Piping M4 Install Slide Gates for Tart Fllbr 718Sp25 24Sp25 Install Slide Gabes for Tad.Fltr A411 (5e)Pain Process Pepe 523-Sp25 29Sep-Sep -_..._. ._...._... v._ .................... _ .._._.....- --.... eses�pre)Pea Process Pipe .---. -.-- I; -..-._ ----. .... .. .......... A49: Se144'Wall Fbkngs 325Sp25 29Sp25 gat 44'WalIFtlnys• ": • • A3800 R1al Rebut NPW end Chem Feed Line. 40 01 0 . 28.Sp23.YSN Pips • • A3915 RFL048(Delay) 10 00 ay-26A 20Mey-25 A • • • A4141 Install 80P 0VC Line 1512-Mey-25A 01Au925 -..-'411114.4119419,Install 80-0IWC Line ----.. - -.._-. -...... -.. ............ .........- . --..... •.......... • A4400(Bs)Install 4&19WAPSP from W-110 Keyo ate20 523Jun25A 01Ju425A Y)Mb14MtW-AFRP Sam W-1b Keynote 20 I,• Unidentified640Unidentifiedlineed 80 Conflict(RFI-0G4) 001JV125A 18JuId5A UeIIbnIAW BrO LIM Conflict • ':.. A4450(]a-]b)Connect e4-FRP front Ted.Filler to JBB 815JUL25A 18Jul-25A ll(Tt]b)Connect fP FRP from Tart Eller b JBB A4460 Manhole Drainage Bypass 821Jd25' 30Ju1-25 1YnMbDrainageDrae Bypa® '' '': A4490 Demo(1 Replace Existing 18'Drain Line.MHS8 MH47 521JLL25 25Jul-25 -.-..- .---gecrq{Repass Existing 1/P blabLM l.Wd3/jN-I] -.--. • • ... .-.. .• ..... M500 Inge 68DRIPVC from Reuse Filter 528Jd25 01Aug25 4 Install 8.0RPVC from Retae Fall • 4.4850 Inapp 48lRWAFRP from UV-1 to WS(Poet 6N Reroute) 528-Jul26 01Aug25 kW1484WArFRP horn UV-1 b TP8(!rat 865 Rama) • 43620(21a)Demo 24-Elf front JB3 to Twofer PS 304Aug25 08Aug25 —(21a)Demo 24.ER from JB3 toTmsfarP9 'A3830(17E)Bypa Pumping 4MOD Far to PS 1404Au945 21Aug-Aug (1lb)Bypma Pumping 4MGD Fla m A3640(21a)Demo 36'Fib EO to Transfer PS 504Au925 09Aug-Aug sham es Ris)bero 3C1ir E8mtieS.P$ ....... ..._...- ..............-_.......__.._ ...I...... -.. - -..... M170(17b)Flypam Pumps from J13-1 to Ell.Fb6 W 1404Aug25 21Aug25 (176)899,00 Pump.horn JR-1 to Elena&W A3850 Demo Esigrg Fb nnetar Structures 511Au025 15Aug-25 Deno Etta%Formosa Shams • M210(7a-75)Connect 84-FRP from Fiaerto JB3 813Au925 20Aug25 �(76212)Cayra 84'FRP from Faalb J113 A4151 Install 12Orain Line,M-458 MH<B 81aAug25 27-Aug-25 beef 12 Drab 1Jes,10445S MN48 Actual Work il Critical Remaining Work r1 Summary Page 1 of 2 TASK filter:AS Activities Remaining Work • •Miestone ©Oracle Corporation jBrushy Creek W WTP Tertiary Filter +�1 ,� « — « "" �« . a « 23-Jul-25 10:44i— _�� i, � I 1 • 1 1 • I ' I • , �I ^� I� ` `` lI I • LL I •� • 1 I 1 I' 1 I 1 1 '1 I I �I I • � w I• A4480(8a)Install 48'82P FRP from TPS b E4 Reuaa AA FM 16214.4p25 10Sap25 (Be)Inatag4�834'FpP frpn TP3I0Ex.Relbe Bl:A Flier A4140(21d)Inalal10.41'Drain Wet WMH'e/or FM SS/b BTPS 32884426 013e625 (21dynstal11V5.Oren LheWMM9 fa Rase Basins BTPS A3855(10e)Mall 48'BFV'e 525Aug25 03-Sep-25 (loe)115 148'BFV'e M142(31)Test Drain PipirgB MHe 302Sp25 04Sp25 (J9 Tel Drain Pipig 0 MHs • A4230 FRP PO Testing 704Sp25 12Sep25 FRP Pea Tseg • A3880 R1a)Demo Remaining Yard Ply* 2055p25 08Sep25 ......_._ ... .._..._.._..._..__w.._.............._.._......_..... .. ..... ..._._ .. ._...__. .. ............ .._...._._.... ................ .._........._... • ... .......... ..... ...... .......... l l esr.Rlpppga.irilglteli lFw_....._... �_ 1... A4880 Bypass Termination 115Sp25 15Sep-25 I a BRpaSTbntntlbn A39)5(ALT.4)Furnish&1ret9112'PVC Line b NPW 3 23-Sep-25 25-Sep25 I r —(ALTA&Rani*a I O 12'PVC LimbPPW 01{425,Aye M155 ExmwbJBb 313Ntar2A 5 1]Nlar-250 r ............... _.. .._ ......... _...._..._.i..__.. ....._._._.._. .._.__• _.. ...._.._._.._..._.._.._..... _.... ..._......_..__._. ._ ._ _._..__....._..___ ....._......__L.. A4145 JBS Delay due to Charge of Sae Conditions 8517-Mar25A 10Jun-Jun BIM CaIaw M F(1]5 R034 Ex.UEllly®JB9 512#br25A 27JMr25A ! M165 RFI043-JB9 Issues 1017Apr25A 24Apr25A • • M225 JB9-Modified Rater Submittal 2012#hy-25A 04Jurv25A • A4215 JBS Fabrbb Reber-Madead JB9 SOG 504Ju1n25A 10Jun-25A lSB9SOG • A4135(21e)FRP JB-9 1521125 08Aup25 ._...... ..._...........ea Maba-WYbY1W''BR1�)FRPJS-8.................. ................ ........... _ ............. ............... Ju .............. .. ............ .... ............ _.___. .. .__....._ .._..__.... _..........._......_. M540 BaCMII JB-9 211Aup26 124u6-25 MldM1JBi • M180(21e)Derro Pealing Utilitylnsle JBE 52]Aup2S 02-Sep-25 ��(21e)Mnq Etlaeg llaylstle JB-0:, • • A4810 JB-9 Metals 5 25Sp25 010ct-25 aaseei JBe MabY 1, • ............. i....... .......... ..............r ............ ...._. .r._ ...... M390 Excavate Wt 529#bY25A 05Jun25A A4340(20)Cone W-1 Proposed 48.FRP 205Jun-25A 084un25A OP • M350 R1fl)Demo W-1 Lb 506Jun-25A 064urv25A • A4380(210 FRP uv-I 48'Color 709Jurv25A 234urv25A V-148'Collar • M206 FRP UV-1 Weis Reim 512Ju4.25A 23Jun-25A Nails Raise A3810 R1pWala14S FRP IaUV-1 1]18Jurv25A 23Jurv25A 4B'FT2P to UV-1 ...__. ..._.__..._____.__..._..__.___._._.._ __..... __.. _..__ ._....._.._...._........ A4370(2l9)Ba03 UV-1 321Jul25 23JUF25 tt R1g)9ae1jBl LA41 • M1950ano Exllrp 54'Pipe at UV-1 and Other Work Mlle 520Mup25 28Aug-25 4.•Demo EdeMg 51'Pipe e UV-1 sod 08r Work Made A4185(144-14413a-13b)1nsb11 Slide Gabe to UV-1 3 27Aug25 AlAug-25 —(114-140-13e-139)halal Slide Gebeb W-1 MB201nsb11 Handrails to UV-1 202-0.25 030.F25 —hWe Herr68YMUV-1 19A6 6 -26 .JB3........_._.......... ................ ..... .......... .....i.._... ................. ........_......t. ._..... ........_....._........a_._..... ......._........... ....... ....... ....... A4190(4e)Core JB3 405Aug25 08-Aug-25 �)40)Core J83 • A4580 Seter FRP Wall Ealing 211Aug25 12-Aug-25 —Set sat FRP Wee Feng • A4610 Rabe Welk at JB3 2 13-Aug-25 14-Aug-25 Rem Wale lJB-3 A4200(12a-12b)Irgbll Slide GIs JB3 315Aug25 16Aug-25 (12a-12b)MY[SWe0ir8Ja3 ' l 54lr4le091 Ir2er1I YAK _........ 1... .._.._... ........... ... .......... _ _... 19 e9eaa11.... ... A4270(21k)Finl Grading 317Nov25 19Nov-25 R1k)Flnl GAMIN M260(21b21b)SMaAlla 1520Nw-25 1000o25 • (21b21b)881aallb A4280 R1k(41b Reabrelbn 520Nov25 28Nov-25 • • 4se..=(258186 Rallala al • A3874(218 Instal Clain Lira Fence 320Nov25 24Nov-25 i 44.R10 eleY Chinlit Fence_....._..._..._...._._.._.._�...__._... ... .... .... A3830(3h)EIsOInpl Campy Foundation 4 1Mug25 19Aug25 i y�ph)Eleu9eW Gbn%Faallan 'aaaaaaW l4,ilpy,yy pymq} • A4430 Role F9br Canopy CandulSlub-Um 520Aug25 20Aug25 Roue Flaer Campy CorWXSOA4Jm A3900(3h)Elea/Noel Canoe',SSuc6n 3 2]Aug25 29Aup-25 (31r)Ebddl Ga%Str ucture 1 A3910(19a)hill Panels at Elect Cencey 301Sep25 035ep25 —(19a)Instil Panels l Eel Crap/ A390(19a)Reroute Exil LV and Comm Ovate..N.el Torbay FA 504Sp25 105p25 t (19e)RsmulbtiM tanm DW Lvenaba Nd ia . � A3920(19e)habl Ducbcke from Est Elect Rm to Elect Campy 311Sep-25 1554625 I 114.(19e)Install 0048*a from Eeet Elect Re to Ella Caro% A3930(19a)Reroute Pour end Gonbobb each Ell R. 511Sp25 17Sp25 I aaasa. (19e)Re10ub Poker and Gonads beach Eel Fars A4220(19.2016 EbcIncel B Conbok to JB's 12113ep25 2654P25 (18a110e)Eknbkla 6Caltiole bJB's A4410 Inlal Duabanla toBRA5165p25 22Sp25 aaaaaaaas MINI WOW.to BFVu ......................._.. ...-I �_� _ _ . _ eaaa9[la*Rode FlMEbolrkaCUP4S 5235p25 2BSp25 ...._.._......M880 Electrical and Gonbo4-BFV Vault 523Sep25 29Sep-25 I tlallolalCa*ok-BFV Nub A4120(20a)Install Tot Fla Elacslol&C0n6c41 1003Nov-25 14Nov25 QOe)YW 9a Rl &CalN • 29 Starbry BTelnp 30171a04-2 Bbl�aal Tiing 23JnaGre9Ilm 299 s4bemnealcampeeOn 0 z60eozs ...._.._.._......_._._._.._._.__ _........__..___._..__.......___._I_.._.__..._._._._._...___._._ I. '....._.._...__..._.....__.__...___.__...�___._..____._..___....__-•bubal+Illd C6npelae ._ Push LM..._.._.. A4290 Punch List 20 29-0eo25 23ry Ja26 1 ._._. _- ' I ; • 2999 FlnelCompbtbn 0 23Jarv26' r i a Reel ConWlls Actual Work Critical Remaining Work , Summary Paps 2 of 2 TASK filter All Activities ® Remaining Work • •Milestone ©Oracle Corporation ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page ',ys Exhibit D-Fee Schedule Project Number:0982-011-01 PLUM M E R Date: 8/13/2025 l CONSTRUCTION PHASE SERVICES-SUPPLEMENTAL Version: 1 Project Project Sr.Electrical Plummer Manager Engineer EIT CAD Engineer Labor Plummer Fee KFA Fee FNI Fee Subs Total Total (hrs) (hrs) (hrs) (hrs) (hrs) (hrs) ($) ($) ($) $ ($) CONSTRUCTION ADMIN.SERVICES 159 149 139 0 75 522.00 1 Engineering Services During Construction 105 105 115 0 75 400 $ 85,200 $ 7,820 $ 14,430 $ 24,475 $ 109,675 1.1 Construction Meetings 15 15 15 5 50 $ 10,100 $ 3,910 $ 4,301 $ 14,401 1.3 Site Visits 5 5 5 5 20 $ 4,450 $ 3,810 $ 4,191 $ 8,641 1.4 Quality Assurance 5 5 5 5 20 $ 4,450 $ - $ 4,450 1.5 Document Review 0 $ - $ - $ - 1.5.1 Submittal Review 30 30 40 20 120 $ 24,950 $ - $ 24,950 1.5.2 Substitutions Review 5 5 5 5 20 $ 4,450 $ - $ 4,450 1.5.3 RFI Review 25 25 25 25 100 $ 22,250 $ - $ 22,250 1.6 Change Orders&Rejection of Work 20 20 20 10 70 $ 14,550 $ - $ 14,550 1.7 Substantial and Final Completion Review 0 $ - $ 100 $ 110 $ 110 3 Project Management and Quality Control 54 44 24 0 0 122 $ 24,110 $ 3,440 $ - $ 3,784 $ 27,894 3.1 Project Management Activities 30 20 50 $ 10,550 $ 1,520 $ 1,672 $ 12,222 3.3 QC Reviews 0 $ - $ - $ - 3.4 Coordination with Pre-Procured Equipment Vendor 0 $ - $ - $ - 3.5 Meetings with City Management 24 24 24 72 $ 13,560 $ 1,920 $ 2,112 $ 15,672 TOTAL CONSTRUCTION 159 149 139 0 75 522 $ 109,310 $ 11,260 $ 14,430 $ 28,259 $ 137,569 Previously Authorized Fee $ 1,896,511 Updated Contract Total $ 2,034,080 1 of 1 https://apaienv.sharepoint.com/sites/0982-011-01-Internal/Shared Documents/Internal/01 Contracts/1-1 Client/Construction Admin Amendment/Construction Admin Supplemental Worksheet_Plummer 8/13/2025 FREESE Innovative approaches ri NI H ` Practical results Z n a O S Outstanding service 801 Cherry Street,Suite 2800 + Fort Worth,Texas 76102 + 817-735-7300 + FAX 817-735-7491 www.freese.com August 8, 2025 Plummer, Inc. 8911 N Capital of TX Hwy Bldg 1—Suite 1350 Austin,Texas, 78759 Re: Brushy Creek East Regional WWTP Expansion—Filters Project Additional Construction Services Dear Perran Hutton, Freese and Nichols, Inc. (FNI) is pleased to submit this proposal for providing additional construction services due to the construction duration increasing by 5 months to Plummer, Inc. (CLIENT)for the Brushy Creek East Regional WWTP Expansion—Filters project. PROJECT UNDERSTANDING Our understanding is that Plummer will be the Prime to the Brushy Creek Regional Wastewater System Partners(Owner). FNI will be a sub-consultant to Plummer on this project. Our understanding of the scope of work for FNI under this proposal is detailed in Exhibit B.1. ARTICLE I -COMPENSATION FNI proposes to provide Basic Services as described herein for the lump sum fee of Fourteen Thousand Four Hundred Thirty Dollars ($14,430). TASK FEE Basic Services Total $14,430 We appreciate this opportunity to submit this proposal. If additional information or clarification is desired, please do not hesitate to contact us. If you agree with the services described above and wish for us to proceed with this assignment, please initiate contract proceedings. Sincerely, FREESE AND NICHOLS, INC. Vimal Nair, PE Principal/Vice President Attachments: EXHIBIT"B.1"- Scope of Services • • . , •••-"iire- ...„„„irrApilovii.r.r , , , ..... , i Apiirr t * .-.--- - .-,,,, 1 • '''.4-•!?1,-f- :"..110,..1.&'' w . Forest Bluff ..- .. .,-/l 141;61 .,#*': -"- 440 . - , . 4 : "I sveal 1 0 • 0. . -. • ,,,a,‘ .0, ' -•-4, ,- k *. , ,• . r- It9 PE13 •••• • ‘e t 1-401 ,...• , 4 -' ' - • ,*tr, •.:. lk, r:t ‘ •-• - -... 11 / ,--•'-' . ..k 93\10 irs‘ , . 1 ...,- .jrilli - _S :c;1169 , ,i e ,'44V i '- ••44-A.# .. •"0, , - ,. ,•- Pis. s' ...1 ...-- . i Illif. j,;-, ..j..70.0.0•Alk A i4( , , . , .4.0")::: t4r 11-‘,....... , • -,- • rgillirtiq''*... -1 '• . 0* •.:* .. ,A • .., " 4114::\ t d. ' • . , - . , - 197 . Ar • . 0\ '''', ‘ ..e. ,it. ,,,cysocs''' , . efr ' %4 ; ',. .... ... c?(.59 .t6S0 , \ ' c , - A 1•11 • — /1.,'''4 0 a , ',IL V lit , . . 41 - 7 ,et!, ,117 ‘••, e f 00%416Y ,c :c?C S:°)iiiqf ." Se .00111 ' Jr n 1 -7- IP 1 , IN. . . ' , ; --, • • . . 4 - -4r A E ro - `''' cn - , \ •• if 44111k. 1 .,,, , --it n, , CA ......„,..a....atii ':...AL .„., '•Pr.IV• 11114 i , 'a • , amp:11 P.' .41/ 4111 21 t 1 r .1 ..L.-L-A....ii... . 1 ...,....i...... r. .. ..t_..A. , t ,... ... f; 79, ...i .•• iwr 3 4—7 -.a_ t4) t it'.2-7 2111tqui • , i d _EX ..x.„...-;---- . 00, .# 41 •III 411.9 a 11 :19 .... 1$ ,....., 7-1-1 tiLirrIP"""' / t AT affins 1 fProjeCt Location `• ... R4 • ilitirts4g :1,e, ,...: .... i lini .‘ BrushylGreek ,ft E--.1 ... jer,:- -.- --"Ir - - 1 ..A 4 , i ,..., 1 .Nit, - .:. . 1_ . - Regional Wastewaterl. - ' , 44. ...t .4.• . _ t Alriliallgi - t f _ .•.,. .1 ,„. 4.10..‘14t. i System East WWTP ; 4 , ...,.. „r.4 • , • , 4,4\ i • ii . • . • . . •. . ... :1 • \ ...4 de ., vial ;t0 ,....' •r . _ 0 , Kt • i - it t I :. 1 IT ....• _\ • •••••-•• . k., „', 0 •• .., P ...N eft A I 1- ,,, • . ..T 4,?. . - 4. I. `" •f y \ V. - • Si . I J bg• N.% ..ar . ...... . / . , 3 . . ...•0 • ir .• .. , , . '0'. ' . t I %., • . -- ' • , • . i tg*.' ' 4, 41 •tbill " , , , • ,. , ,. .4 .... . ........ ,,,•, . . . . .._ -114 I 4 - . ...,-.. el, it)'' •• 1. ' --1 . lk . • . -- ., . .„....../ %., ' . • ,..•0k_bt; •••••r. .A , , _, .. /i iik.ot ...1 ,,... . .. ... - . % • 01i . Omit ..4 . • , r• , Ill C let - all ' - • V' .. , '' l''' ' ''' :4-'..`' .. -4-..' -411 -;•-;;:fg'4,111+ r . „ V .. .41 „... • , , , , e- • 4. -....- Noi _-............ . .. .4 I # 4 1 t 'i Ai i f Cb SVI Pelt'?. t ' ‘' Date:1 2/2024 BCRWWS Tertiary Filter Project ROUND ROCK TEXAS