Loading...
R-2025-262 - 10/9/2025 RESOLUTION NO. R-2025-262 WHEREAS, the City of Round Rock ("City") has previously determined that "Competitive Sealed Proposal" is the delivery method which provides the best value for the Cycle 4—Basins 1 and 2 Wastewater Main Rehabilitation Project, and WHEREAS, after advertising for and receiving proposals from offerors, the City of Round Rock determines that Royal Vista, Inc. is the offeror which offers the best value for the City, and WHEREAS, the City Council now wishes to enter into a "Standard Form of Agreement Between Owner and Contractor" with Royal Vista, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That, after advertising for and receiving proposals from offerors, the City of Round Rock hereby finds that Royal Vista, Inc. is the offeror which offers the best value for the City for the Cycle 4 —Basins 1 and 2 Wastewater Main Rehabilitation Project. BE IT FURTHER RESOLVED, That the Mayor is hereby authorized and directed to execute on behalf of the City a "Standard Form of Agreement Between Owner and Contractor" with Royal Vista, Inc. for the Cycle 4 —Basins 1 and 2 Wastewater Main Rehabilitation Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. 0112.20252;4935-6288-5483 RESOLVED this 9th day of October, 2025. CRAIG RGA , Mayor City of R nd R k,Texas AT T: Aa'jj AN ANKLIN, City Clerk 2 p, 19 North Main Street • Temple, TX 76501 • (254) 773-3731 800 South Austin Ave • Georgetown, TX 78626 • (512) 819-9478 ENGINEERS 11111111 September 22,2025 Mr. Michael Thane,P.E. Executive Director of Public Works City of Round Rock 3400 Sunrise Road Round Rock,Texas 78665 Re: City of Round Rock Cycle 4—Basins 1 &2 Wastewater Rehabilitation Project Mr.Thane, Proposals were received by the City of Round Rock until 10:00 A.M. on Wednesday, August 6, 2025, for the above referenced project. Three(3)competitive sealed proposals were received. The Cycle 4—Basins 1 &2 Wastewater Rehabilitation Project primarily consists of 1,020 linear feet of sanitary sewer replacement ranging in size from 6"to 36", 325 linear feet of existing sanitary sewer adjustment ranging in size from 8"to 10", 13 point repairs ranging in size from 8"to 36",chemical grout injection at 7 locations,3 cleanouts,2 manhole replacements, sealing 3 manholes, traffic safety, trench safety, preconstruction & post-construction videos, site preparation,post-construction testing,site restoration and clean-up activities,and various other construction activities. An add alternate bid was included for the option of performing point repairs in lieu of chemical grout injections. The lowest cost and highest ranking proposal for this project is Royal Vista, Inc. of Liberty Hill, Texas with a Base Bid Amount of$1,668,253.61. Through the competitive sealed proposal process,potential changes that could improve clarity and value of the project were discussed with Royal Vista. This resulted in a refined item scope for restoring service connections, and a total deduction of$21,600 from the original base price. Royal Vista, Inc. has successfully completed similar sized and scoped projects for several Municipalities in Texas. We have reviewed the current workload, references, and construction history. As a result of our findings, we recommend that a contract be awarded to Royal Vista, Inc. in the amount of$1,646,653.61. Sincerely, Ari(614\ Haden Mattke,P.E., CFM cc: Ms.Kaitlyn Saucedo,Project Manager,City of Round Rock Project File Texas Firm F-510 • kpaengineers.com CITY OF ROUND ROCK Public Services 3400 Sunrise Road Round Rock,Texas 78665 BID OPENING PROJECT NAME: Cycle 4-Basins 1&2 Wastewater Main Rehabilitation LOCATION: Virtual BID DATE: 8/6/2025 TIME: 10:00 AM Statement of Contractor's Name Addendum (s) Safety Bid Bond Base Bid Add Alternate Bid Total Royal Vista, Inc. X X X $1 668 253.61 $82,666.00 $1,750,919.61 Patin Construction X X X $2,110,250.00 -$17,500.00 $2,092,750.00 Guerra Underground, LLC X X X $2,026,205.99 $194,377.23 $2,220,583.22 Page 1 of 1 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Public Services BY: Kaitlyn Saucedo 3400 Sunrise Road DATE: August 6,2025 Round Rock,Texas 78665 BID TABULATION PROJECT: Cycle 4-Basins 1 &2 Wastewater Main Rehabilitation LOCATION: 3400 Sunrise Road Company Name: Royal Vista,Inc. Patin Guerra BID DATE: 8/6/2025 Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Addendum(s)Yes Addendum(s)? Yes Addendum(s)Yes Addendum(s)? Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPROX UNIT UNIT ITEM# QTY. UNIT UNIT PRICE COST UNIT PRICE COST PRICE COST PRICE COST 1 Mobilization,Bonds and Insurance,not-to-exceed 5%of the Base 1 LS $80,000.00 $80,000.00 $75,000.00 $75,000.00 $77,625.00 $77,625.00 $0.00 2 Prepare and Implement Traffic Safety Plan(Vehicular and 1 LS $43,700.00 $43,700.00 $70,000.00 $70,000.00 $25,212.60 $25,212.60 $0.00 3 Prepare and Submit a Trench Safety Plan Signed and Sealed by 1 LS $1,150.00 $1,150.00 $1,500.00 $1,500.00 $4,347.00 $4,347.00 $0.00 4 Furnish all Materials,Equipment,Tools&Labor Necessary for 1700 LF $8.05 $13,685.00 $15.00 $25,500.00 $23.10 $39,270.00 $0.00 5 Furnish all Materials,Equipment,Tools&Labor Necessary for 2600 SF $4.60 $11,960.00 $15.00 $39,000.00 $14.91 $38,766.00 $0.00 6 Preparation of Right-of-Way and Clearing and Grubbing 1 LS $34,500.00 $34,500.00 $150,000.00 $150,000.00 $9,936.00 $9,936.00 $0.00 7 Prepare and Submit a Temporary Bypass or Bypass Pumping Plan, 1 LS $34,500.00 $34,500.00 $10,000.00 $10,000.00 $9,315.00 $9,315.00 $0.00 8 Furnish all Materials,Equipment,Tools&Labor Necessary for 1 LS $115,000.00 $115,000.00 $250,000.00 $250,000.00 $259,617.74 $259,617.74 $0.00 9 Furnish all Materials,Equipment,Tools&Labor Necessary for 1 LS $28,750.00 $28,750.00 $100,000.00 $100,000.00 $172,202.06 $172,202.06 $0.00 10 Furnish,Install,Maintain and Remove Erosion Controls,Including 1 LS $45,537.70 $45,537.70 $15,000.00 $15,000.00 $13,662.00 $13,662.00 $0.00 11 Furnish,Install,Maintain and Remove Tree Protection 2 EA $1,265.00 $2,530.00 $1,000.00 $2,000.00 $1,242.00 $2,484.00 $0.00 12 Furnish all Materials,Equipment,Tools&Labor Necessary to 390 LF $311.08 $121,321.20 $300.00 $117,000.00 $461.80 $180,102.00 $0.00 13 Furnish all Materials,Equipment,Tools&Labor Necessary to 320 LF $317.19 $101,500.80 $350.00 $112,000.00 $382.58 $122,425.60 $0.00 14 Furnish all Materials,Equipment,Tools&Labor Necessary to 310 LF $525.55 $162,920.50 $600.00 $186,000.00 $377.77 $117,108.70 $0.00 15 Furnish all Materials,Equipment,Tools&Labor Necessary to 250 LF $240.81 $60,202.50 $175.00 $43,750.00 $241.36 $60,340.00 $0.00 16 Furnish all Materials,Equipment,Tools&Labor Necessary to 75 LF $380.57 $28,542.75 $200.00 $15,000.00 $257.92 $19,344.00 $0.00 17 Furnish all Materials,Equipment,Tools&Labor Necessary to 3 EA $1,418.33 $4,254.99 $5,000.00 $15,000.00 $5,008.99 $15,026.97 $0.00 18 Furnish all Materials,Equipment,Tools&Labor Necessary to 6 EA $14,545.82 $87,274.92 $15,000.00 $90,000.00 $20,930.66 $125,583.96 $0.00 19 Additional Length of 8"through 10"Point Repair,Beyond 10' 20 LF $482.95 $9,659.00 $350.00 $7,000.00 $387.42 $7,748.40 $0.00 20 Furnish all Materials,Equipment,Tools&Labor Necessary to 3 EA $16,790.00 $50,370.00 $20,000.00 $60,000.00 $45,018.77 $135,056.31 $0.00 21 Additional Length of 24"through 27"Point Repair,Beyond 10' 105 LF $778.15 $81,705.75 $600.00 $63,000.00 $1,349.54 $141,701.70 $0.00 22 Furnish all Materials,Equipment,Tools&Labor Necessary to 4 EA $26,024.50 $104,098.00 $15,000.00 $60,000.00 $35,774.07 $143,096.28 $0.00 23 Furnish all Materials,Equipment,Tools&Labor Necessary to 27 EA $6,192.96 $167,209.92 $13,500.00 $364,500.00 $2,529.33 $68,291.91 $0.00_ 24 Furnish all Materials,Equipment,Tools&Labor Necessary to 1 EA $9,487.50 $9,487.50 $20,000.00 $20,000.00 $10,867.50 $10,867.50 $0.00 25 Furnish all Materials,Equipment,Tools&Labor Necessary to 2 EA $10,925.00 $21,850.00 $0.00 $10,867.50 $21,735.00 $0.00 26 Furnish all Materials,Equipment,Tools&Labor Necessary to 2 EA $5,175.00 $10,350.00 $0.00 $4,657.50 $9,315.00 $0.00 27 Furnish all Materials,Equipment,Tools&Labor Necessary to 2 EA $6,037.50 $12,075.00 $0.00 $5,589.00 $11,178.00 $0.00 28 Furnish all Materials,Equipment,Tools&Labor Necessary to 1 EA $94,492.08 $94,492.08 $0.00 $52,046.76 $52,046.76 $0.00 Page 1 of 3 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Public Services BY: Kaitlyn Saucedo 3400 Sunrise Road DATE: August 6,2025 Round Rock,Texas 78665 BID TABULATION PROJECT: Cycle 4-Basins 1 &2 Wastewater Main Rehabilitation 29 Furnish all Materials,Equipment,Tools&Labor Necessary to 1 EA $30,291.00 $30,291.00 $0.00 $56,190.41 $56,190.41 $0.00 30 Furnish all Materials,Equipment,Tools&Labor Necessary to Seal 39 VF $1,265.00 $49,335.00 $0.00 $682.31 $26,610.09 _ $0.00 31 Owner Allowance 1 LS $50,000.00 $50,000.00 $0.00 $50,000.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL $1,668,253.61 $1,891,250.00 $2,026,205.99 $0.00 Page 2 of 3 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Public Services BY: Kaitlyn Saucedo 3400 Sunrise Road DATE: August 6,2025 Round Rock,Texas 78665 BID TABULATION PROJECT: Cycle 4-Basins 1 &2 Wastewater Main Rehabilitation PROJECT: Cycle 4-Basins 1&2 Wastewater Main Rehabilitation Royal Vista,Inc.(Add LOCATION: 3400 Sunrise Road Company Name: Alternate) Patin(Add Alternate) Guerra(Add Alternate) BID DATE: 45875 Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Addendum(s)? Addendum(s)? Addendum(s)? Addendum(s)? Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPROX UNIT UNIT ITEM# QTY. UNIT UNIT PRICE COST UNIT PRICE COST PRICE COST PRICE COST Al-1 Deduct-Bid Item 24(27"Main Line Joint Grouting) -1 EA $9,487.50 ($9,487.50) $20,000.00 ($20,000.00) $10,867.50 ($10,867.50) $0.00 Al-2 Deduct-Bid Item 25(36"Main Line Joint Grouting) -2 EA $10,925.00 ($21,850.00) $25,000.00 ($50,000.00) $10,867.50 ($21,735.00) $0.00 Al-3 Deduct-Bid Item 26(10"Lateral Tap Connection Grouting) -2 EA $5,175.00 ($10,350.00) $10,000.00 ($20,000.00) $4,657.50 ($9,315.00) $0.00 A1-4 Deduct-Bid Item 27(27"Lateral Tap Connection Grouting) -2 EA $6,037.50 ($12,075.00) $12,500.00 ($25,000.00) $5,589.00 ($11,178.00) $0.00 Al-5 Furnish all Materials,Equipment,Tools&Labor Necessary to Condi 1 EA $17,940.00 $17,940.00 $12,500.00 $12,500.00 $44,720.69 $44,720.69 $0.00 A1-6 Furnish all Materials,Equipment,Tools&Labor Necessary to 2 EA $26,024.50 $52,049.00 $12,500.00 $25,000.00 $31,849.35 $63,698.70 $0.00 AI-7 Furnish all Materials,Equipment,Tools&Labor Necessary to Condi 2 EA $10,166.62 $20,333.24 $12,500.00 $25,000.00 $26,978.85 $53,957.70 $0.00 A1-8 Furnish all Materials,Equipment,Tools&Labor Necessary to Condi 2 EA $23,053.13 $46,106.26 $17,500.00 $35,000.00 $42,547.82 $85,095.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL $82,666.00 ($17,500.00) S194,377.23 $0.00 Page 3 of 3 Updated 6/17/19 Edwards Aquifer Cycle 4 - Basins 1 and 2 Wastewater Main Rehabilitation Recharge Zone ROUND ROCK TEXAS N A m Terra vista 2 Golf Club N 2 So 0- Conser r g1Vd Sery y e Round '•ock Reseit Highe r T , 'es ducatio omplex ' oaa 112 , , \ --\ Basin-2 y --k f.`P 1.)'\ / o II m h a)r� E Basin 1 «�,e K cp a CD N 7 Lim a > p1E deg ec c a) 1— F . e . ".a i C:� •e •c, , •re-re -e , Z a i•er Tr\ Cha d1-rCre- 4.i ••rk zi? 1°If4 '1 v.�•. r r saw 11 11 ,I •r .,Fr 1 3,,ght, Jr r7% r.311114 ]ate:4/9/2024 km -elk .i4ik..1 11001 -..41-1.M.-1..111. 1 ry 1 - V rr , , r . - - 1' , r=--- . . eV 1.ightwa.er rifvd 1 11 1` — f4 Br \ _�— ff.0V- 5' iSI, \ iii• (2) 0 SD so +� A �•••,,•• —_ PARKLAND \\\ I _ V �w.r MANHOLE TO BF , \WO----------- TED TO SURVEY .----... TREE SURVEY 30 EITHER SME OF \ TP R.ELEVATION DEPTH Bsoro BE.d vEo _ — <_ \ .,.nve ro.e.no PROVIDED WASTEWATER CENTERLINE TAGGED V/TTN opoo,00 Too.DIAMETER.1>�� r CITY OF ROUND ROCK \ __ ` \ \ - \ LEGENDS VILLAGE- ."-- \ _ \ �� \ \ CHANDLIER CREEK \ r W \ _ \ \ GREEN BELT411111 \ S TO BE PERFORMED BY C ONTRADTORCONTRACTOR SMALL COORDINATE \ \ \\ .Fo TO BE PROVIDED \ WASTEWATER CENTER/ME T .0 \�— \ \ \ ......:u.: FMENT mow \ :.......' \ // SPECIES MJ.TER AND R.IUS PROVIDED A.AN.3C.-:,..4,4,,, }w"'" I PARKWOOD TERRACE LLC \ / 1201 OLD SETTLERS BLVD ROUND ROCK,TX 7866 IVY TO BE SURVEYED STAKEDi X ' JOIN 1i,,. 1 +#. : '.� 6' �R+ i' / PARKLAND J 1 9 .. \ `'T\_yl v" v WRIM ELEVAT.I O TO RE women` . LVED AS NECESSARY • —TEXas SO \ MOW dWITIBINIBINWS • li �v ,s / �/ 5 •,_r� `. n y4 STELE4-BAVIN t II WASTEWATER IMP 2 W 9� \ 4EHABiRATCAI 0 C _ \ EXHIBIT