R-2025-274 - 10/23/2025 RESOLUTION NO. R-2025-274
WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with
John King Construction, Ltd. for the Round Rock Sports Center Expansion Project, and
WHEREAS, the Council has determined that it is necessary to make adjustments/changes to
the quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 1 to the Contract with John King Construction, Ltd. for the Round Rock
Sports Center Expansion Project, a copy of said quantity adjustment/change order being attached
hereto as Exhibit"A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 23rd day of October, 2025.
CRA •RG• 4, Mayor
City of ound ' ack, Texas
ATTEST:
014.j-ki,r/a)
ANN FRANKLIN, City Clerk
0112.20252;4905-7721-0481
EXHIBIT Pagel of 3
A
Contract Quantity Adjustment/Change Order
rt,.., ..
red,01 16
Department: General Services
Project
Name: Sports Center Expansion Date: 9/29/25
City Project Change Order/Quantity
ID Number Adjustment No. 1
Vendor John King Construction 7511 O'Connor Dr, Round Rock,TX 78681 512-836-5464
Company Name Address Phone No.
Justification
Install the following Landscaping Impovements on the existing facility, New Asphalt on the South Side due to cracking and holes, seal coat on
the North Side to make it look good again due to age and construction traffic. Parking lot added signage per Sports Center Management Staff.
And install amazon equipment for the concessions which includes the gates, IDf cabinet etc..
SUMMARY Amount %Change
r. _ •
Original Contract Price: $18,895,362.00
Previous Quantity Adjustment(s):
This Quantity Adjustment: $0.00
Total Quantity Adjustment(s): $0.00
Total Contract Prce with Quantity Adjustment(s): $18,895,362.00
0%
Previous Change Order(s):
This Change Order: $263,590.00 1%
Total Change Order(s)To Date: $263,590.00 1%
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s)Plus Change Order(s)]: $19,158,952.00 t
Difference between Original and Adjusted Contract Prices: $263,590.00
Original Contract Time: 480
Time Adjustment by previous Quan.Adj./Change Order: 0
Time Adjustment by this Quan.Adj./Change Order: 34
New Contract Time: 514
Prepared By: /L w.__ f�c�,,AA4 LiLt. isa,,?,• e• 6n.i, i" 44cd, [•E,t. 9i/.30/,.rj
Signature Printed Name,Title, Company Date
Contractor:C6 1—Qrh't:-4 A`f}NrY Pit 1-to'''-osCjt d'S IfyrJ y4.41 c$ ( 'I130/T.a2r
Si ture Printed Name,Title,Company Date
City Project �^ p /
Manager: C ors, /C� -'C /7 1�j! i5
Signature Printed Name,Title /N Date
Mayor/City
Manager
Signature Printed Name,Title Date
Pagc 2 of
Contract Quantity Adjustment/Change Order
Project Name: Sports Center Expansion
Quan.Adj./Change Order No.: 1
Chan• Order Data
Contract
Time
Adjustment
Item# Item Description Unit Qty. Unit Price Amount Da -
CR-052 Ideal Signs 1 1 $7,200.00 34
CR-039 Precision Plumbing 1 1 $6,043.00
CR-050 Parking Lot Changes/Add's 1 1 $141,148.00
CR-042 Precision Plumbing 1 1 $3,402.00
CR-047 Paint Color Changes 1 1 $6,960.00
CR-051 Amazon Add's 1 1 $18,921.00
CR-044 Added Sports Equipment Electrical Work 1 1 $35,978.00
CR-048 Landscaping changes 1 1 $22,447.00
CR-045 Added netting above concessions 1 1 $1,550.00
CR-049 Add heat trace per CORR Fire Inspector 1 1 $9,345.00
CR-046 Credit for Concessions Signn 1 1 _ -$3,884.00
JKC OHP+ Bond $14,480.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
CHANGE ORDER
CO 001 Change Order 1 -Additional Funds
\-\..) c„331LDIr1G fly
Project: Round Rock Sports Center KING
Project No.: 2409 \i-
Date: 9/25/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Additional work requested per description below
Assumptions/Clarifications:
ITEM DESCRIPTION LABOR MATERIAL &SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 CR 052-Ideal Signs - - - - 1 Is 7,200.00 7,200
2 CR 039-Precision Plumbing Exhaust - - - - 1 Is 6,043.00 6,043
3 CR 050-Parking Lot Changes/Adds - - - - 1 - 141,148.00 141,148
4 CR 042-Precision Plumbing Coffee Maker - - - - 1 - 3,402.00 3,402
5 CR 047-Paint Color Changes - - - - - 1 6,960.00 6,960
6 CR 051 -Amazon Adds - - - - 1 - 18,921 00 18,921
7 CR 044-Added Sports Equipment Electrical Work - - - - 1 - 35,978 00 35,978
8 CR 048-Landscaping Changes - - - - 1 - 22,447.00 22,447
9 CR 045-Added Netting Above Concessions - - - - 1 - 1,550.00 1,550
10 CR 049-Add Heat Trace Per CORR Inspector - - - - 1 - 9,345.00 9,345
11 CR 046-Credit for Concessions Sign - - - - 1 - (3,884.00) (3,884)
Total Materials&Subs 249,110
Total Labor 0
Subtotal 249,110
Bond @ 0.7739% 1,928
Subtotal 251,038
Overhead and Fee @ 5% 12,552
Total 263,590
Signature of approval:
Date
Architect
Date
Owner's Representative
Po )464fee, Date September 29,2025
John King Construction
Prepared By King Construction Page 1 of 1 Printed:9/29/2025
CONTINGENCY USE AUTHORIZATION TA
052 Parking Lot Sign Furnish
03\vhiN6 Q�
Project: Round Rock Sports Center KING
Project No.: 2409 'st ,s
Date: 9/22/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Purchase parking lot signage per owner quote-no labor or install included To be installed by RRSC staff
Assumptions/Clarifications:
Purchase only- not tied to substantial completion
ITEM DESCRIPTION LABOR MATERIAL&SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 Ideal Signs - - - - 1 Is 7,200.00 7,200
2 - - - - - - - -
3 - - - - - - - -
4 - - - - - -
5 - - - - - - - -
Total Materials&Subs 7,200
Total Labor 0
Subtotal 7,200
Total 7,200
Signature of approval:
Date
Architect
Date
Owner's Representative
Date September 22,2025
John King Construction
Prepared By.King Construction Page 1 of 1 Printed:9/22/2025
[Faitedeo Ideal Signs QUOTE
79 Eastview Drive, Suite 101
S ' .G n ! Georgetown,TX 78626
_-_ 512-930-7446
*16930-SIGN 504-455-1101
www.ideal-signs.com
Date Quote#
Round Rock Sports Center
2400 Chisholm Trail 9/12/2025 11779
Round Rock TX 78681
512 341 3352
Terms
Description Qly Rate Total
3'x 5'Double Sided Street Pole Banners-Includes Sewn with Pole Pockets& 36 200.00 7,200.00
Grommets-
LOT 1 10 banners
LOT 2 10 banners
LOT 3 16 banners
50%Deposit Needed
Subtotal $7,200.00
ALL QUOTES OVER $5000. Sales Tax (0.0%) $o.00
REQUIRE A 50% DEPOSIT TO BEGIN PRODUCTION. Total $7,200.00
Quote Valid for 30 Days from Date Listed
CONTINGENCY USE AUTHORIZATION
CUA 039 Exhaust Changes In Existing Storage
„), DING R�
Project: Round Rock Sports Center KING
Project No.: 2409
Date: 9/8/2025
CONSTRUCTION
Prepared By: Johnny Abney '
Description:
Reroute exhaust for water heater vents in existing.
Assumptions I Clarifications:
ITEM DESCRIPTION LABOR MATERIAL&SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 Precision Plumbing Cost - - - 1 Is 6,043.00 6,043
2 - - - - - -
_ 3 - - - - -
4 - - -
5 - - - - -
Total Materials&Subs 6,043
Total Labor 0
Subtotal 6,043
Total 6,043
Signature of approval:
Date
Architect
Date _
Owner's Representative
poite"c* "Wog/ Date September 8,2025
John King Construction
Prepared By King Construction Page 1 of 1 Printed:9/8/2025
%., PRECISION COMMERCIAL PLUMBING %ip
CO., INC.
TX LICK M-38402 A HUB CERTIFIED COMPANY
RESPONSE TO PROPOSED CHANGES
DATE:July 14, 2025 ATTENTION:Johnny Abney-John King Construction
REFERENCE: Round Rock Sports Center RFP 7
DESCRIPTION OF WORK PERFORMED: Relocate water heater vents.
Material See Attached $ 907
Core Drilling $ 2,268
Labor 32 Hours @ $65 $ 2,080
Subtotal $ 5,255
Markup 15% $ 788
Total $ 6,043
Sincerely,
Anthony Zuber
OFFICE:512-288-6684 fAX:512-288-4730 1711 OALSHANK ST. PFLUGERVILLE TX,78660
III III I1llllllllllll 11111111 Ill
reece Acknowledgement
ORDER DATE ORDER NUMBER
BRANCH, 1013 AUSTIN SOUTH PLBG 05/30/2025 S120869322
4437 SUPPLY CT,BLDG#7 PLEASE REMIT TO PAGE NO
AUSTIN,TX 78744 REECE PLUMBNG +'
Phone 512-916-4901 PO BOX 841183
Fax DALLAS,TX 75284 1183
Phone 512 918 4901 1 of 1
SOLD TO: SHIP TO:
PRECISION COMMERCIAL PLBG CO PRECISION COM ROUND ROCK SPORTS C
1711 DALSHANK ST 2400 CHISHOM TRAIL RD
PFLUGERVILLE,TX 78660-6501 ROUND ROCK,TX 78681
CUSTOMER NUMBER CUSTOMER PO NUMBER JOB NAME I RELEASE NUMBER SALESPERSON
957389 RRSC Material Requisition Travis Kirks
WRITER SHIP VIA TERMS SHIP DATE FREIGHT ALLOWED
John Goodwin 05/30/2025 No
ORDER PRODUCT
QTY ID DESCRIPTION UNIT PRICE EXT PRICE
6ea 30730 *PVC 4 DWV 90 ELB HUB 15.865/ea 95.19
PN: PDWV9P
6ea 30259 *PVC 4 DWV 45 ELB HUB 15.810/ea 94.86
PN: PDWV4P
2ea 29518 "PVC 4 DWV CPLG HUB 6.627/ea 13.25
PN: PDWVCP
1 ea 2005830 "PASCO 41N CONCENTRIC VENT KIT 192.998/ea 193.00
PN: 22154
NONSTOCK POLICY APPLIES - SEE BELOW
60ft 48256 "PVCPIPE 4X20 SCH40 PVC PIPE SOLID 3.032/ft 181.92
PE
PN: P4OPP20
24ea 2039541 "" 3MAPOCM4X1 12.533/ea 300.79
OC MAX P/C 4X1 -48 LF/CTN
NONSTOCK POLICY APPLIES - SEE BELOW
1ea 22028 "OATEY PVC RAIN-R-SHINE CEMENT lOT 17.252/ea 17.25
BLUE
PN: 30894
lea 22101 *OATEY PRIMER NSF LISTED lOT PURPLE 10.650/ea 10.65
PN: 30758
For TERMS and CONDITIONS of sale,please visit Reece Business Portal
FOR ALL NON-STOCK ITEMS ORDERS ARE NON-CANCELLABLE FROM 24 HOURS Subtotal 906.91
AFTER ORDER IS PLACED.NON RETURNABLE UNLESS ACCEPTED BY VENDOR.25%
RESTOCKING FEE APPLIES.CUSTOM ITEMS ARE NOT ELIGIBLE FOR RETURN. S&H Charges 0.00
Tax 0.00
Pymt& Disc 0.00
www.reece.com Amount Due 906.91
Printed By JG06475 on 5/30/2025 10 31 10 AM COT
INC.frA1C ORIN
6P1h0:w5. T5n1t 0S9 S e 100
Hutto, 7834
Email:Samuel@alcoring.net
CONCRETE SCANNING, CUTTING 6 PLACEMENT Page 1 of 2
Jul 11, 2025
To: Anthony Zuber
Precision Commercial Plumbing
Re: Round Rock Sports Center
2400 Chisholm Trail Rd,
Round Rock, TX 78681
E: SM 0021
A-1 Coring, Inc. proposes to furnish labor, material and equipment for the above listed project.
SCOPE OF WORK: Core Drilling for New Tiltwall & Suspended Slab Plumbing
1. Core Drilling (2)4" Dia. Cores Through a 6" Suspended Slab & (2)4" Dia. Cores Through 8" Concrete
Tiltwall 20' A.F.F
Layout done by Precision Commercial Plumbing.
i. If layout is missing or incomplete,standby charges will apply.
Price based on coring truck within 200'of targets.
Price based on using inhouse water and power for interior cores.
Price based on anchoring core drill to wall
Grouting of anchor bolts done by others.
Removing cores included.
Vacuuming and hauling off slurry included.
Plastic protection of finishes at coring and catching locations included
Man lift rental for our work included
TOTAL PRICE: $2,268.00
(PLUS SALES TAX IF APPLICABLE)
`NET 30 ON CURRENT APPROVED OPEN ACCOUNTS,ALL OTHERS PAYMENT UPON COMPLETION
"PRICING ONLY VALID FOR(30)DAYS AFTER PROPOSAL DATE
610 w. Front St.Ste 100
if
A
Hutto,TX
COR INC. Ph: (512)25178634 0292
Email Samuel@al conng net
CONCRETE SCANNING, CUTTING S PLACEMENT Page 2 of 2
EXCLUSIONS:
• LAYOUT
• GPR SCANNING,UNLESS SPECIFIED ABOVE
• STANDBY;IF OCCURS,TO BE BILLED AT$250 00 PER HOUR PER TWO-MAN CREW
• PERMITS,FEES,&TAXES
• BACKFILL&COMPACTION
• REMOVAL OR HANDLING OF ANY HAZARDOUS MATERIALS
• LOCATE,CAP OR PROTECT ANY UNDERLYING UTILITIES
• CLEANING&PREPARATION OF SURFACES
• CLEANING OF SURFACES DUE TO SAWING OR DRILLING
• REMOVAL OF ANY FOOTINGS,BEAMS,PIERS OR ATTACHED SLAB
• DRILLING THROUGH ANY ROCK
• EROSION CONTROL
• TRAFFIC CONTROL
• BARRICADES OR PROTECTIVE COVERS
• COORDINATION OF SPECIAL INSPECTION
PRICE BASED ON:
• NORMAL WORKING HOURS
• WORK AREAS TO BE BROOM SWEPT AND FREE OF DEBRIS UPON COMPLETION,ANY OTHER CLEANUP EXCLUDED
• ONE CORE DRILLING MOBILIZATION,EACH ADDITIONAL MOB.SUBJECT TO$1,250 00 MOB.CHARGE
Sincerely,
ACCEPTED BY;
,A.1.,,j a4
COMPANY NAME
Samuel Montalvo DATE
WET 30 ON CURRENT APPROVED OPEN ACCOUNTS,ALL OTHERS PAYMENT UPON COMPLETION
"PRICING ONLY VALID FOR(30)DAYS AFTER PROPOSAL DATE
CONTINGENCY USE AUTHORIZATION
CUA 050 Parking Lot Changes ^ j
`1 v guu.olNc By
Project: Round Rock Sports Center ��
NG
Project No : 2409 \-,
Date: 9/19/2025 CONSTRUCTION •
Prepared By: Johnny Abney •
Description:
Redo south lot asphalt and seal coat north lot and restripe.
Assumptions/Clarifications:
ITEM DESCRIPTION LABOR MATERIAL 8 SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 JKC Budget for Sandblast/Prep South Lot - - - - (1) Is 12,734.00 (12,734)
2 JKC Remaining Cost to Restripe South Lot - - - - 1 Is 4,075.00 4,075
3 Lane Star-Mill and Pave South Lot - - - 1 Is 136,981 50 136,982
4 Stripe It Up-Seal Coat and Stripe North Lot - - - - 1 Is 12,825.40 12,825
5 - - - - - -
Total Materials&Subs 141,148_
Total Labor 0
Subtotal 141,148
Total 141,148
Signature of approval:
Date
Architect
Date
Owner's Representative
Ploofy /'sfer/ Date September 25,2025
John King Construction
Prepared By:King Construction Page 1 of 1 Printed:9/25/2025
MATCH LINE SEE SHEET C202
�w w.t,a �� -- �- .111M.111•11.1 _. 7 r GOMM LEGEND O
t 2. e as _
/ ` ill u `W4 I' • o M..
•
?Illif .
' w Oa.. ea
Sea(coat - •- Jii
, s d„ �....
and 58.$35.63 sf �t— •� r
restnpo I • r , ---„' w`°'`.
OI t, �. —•
1..MOP. _ —._ M ft .
Mau.
laffik
_ �( .w. TIu ,�e° N ,1 Y i \1 V\ M 1 L' l,�~ r IR I -�_ i.."`r.
.-,.... .°al a+ p I la.�l.%wo J.'. .< �`'',`� CI' , 11 _��- - enr.r. on.s.ort
'' ""4.. Qv/� [;r g ._�. r t fill: � _ \,\' \,14_, ' . .,s i\ . :
�y..- . . z -4 ., 1`i. .z..------.,4 ,-1_-.- \` �.. j." i t /\ I ,wz° eq 1.. I
tf RC,{I2 it .1 ' .. Ill, \ -I ` _ /_ ♦ - I� I SIT[t1000
1• `1,:..a -".7.'u .�.>assrs.e ' .I rL_ �, _�r,. ' .... I __.. ..
liv
kift
, 'war N�Ol,........14 .HGI , ,, 1 ,, ,
OPIEVeMtv
i i,. PL° :,,. 1 I ,_._4(� ;r'�ow WE
•
ii.neuneu.wr.io-. 4 ,r. .; m^- I �. ! 1 • � .gym Lt t,u
�0-1N°Me.01M}lel �a / ♦♦ INP.I.MItW
1 [,/ I re._l:y._'-/ `11 Y �^:: n+w.Ib Mvru.ultr. M.... nxY+u�
• }q...0.1N
3i !� tr.'..�.� L -R,r`:+o..o.w.w _. I• � .',. /'• _ 'J.7Lir, nMINA Ou,....c
2-fg21! 1 i -- `1---_ T�__. • ;v N' �4
..,e,.r`...1gMwr..�•i.i� Ci. -.L I `\ "';!:t.%�� CO
< 'orw w.N..o enl ii Z
Neay.aeNe.....e, ,.. t 0CC
( "i' .em...N.e: spy .1 „• �'- j.
X CO
•r.. . arre`wvnw ::.i-- Y.:S1 �'. ., . i!� 0" rNr.r:....a..oa e..e....or w.OeM O vJ J
T v w;.� .• " .awn.ees..ucrmww.az.a.nw Cl- Z Q
M '41 a•r.L.T..r..::oon...rwapr... 2'
iisii.'}'-1 '4i?,. PiG 1:`naa,-. I ,A'• % _ - o i..i:o noepeiw�`.a w:dwnae
i { 1 ar ` ..v,NQ- e►°rn.oM..e.o°.oe..N...... Y
V V 2-1::, I • ........0Y1W,../..e/OW�.W M �/
! -T✓• _•� .'�'\'• -- .M...ew N«r,...ca..wwwrr.w.n U X J 0
,Y .ue.No .v..m.+.enr.ww.la...
q o EI,' y i' , �rnua.,e.z...., •:r':'.- a 3M1,wa.wan.M.E w.mw.+.+.erw O W =O
a �I y� .w e..+w.�.rnw°WI 114/ANO Me..AMMO.O,CWR.
sL �q ' ° A //'lT.` wVn.NwM� N.. N n/ (f�
L I:v , t'1 � a,.o ll M.MK.6WKS A.II.R...r.D..e,.M LQL LWL ♦ CC
=1Z
I 1 I , C :nro.. J• •~ '1 ... .... N» w..... .... N... awlwR,.eurr..w� U
�� �,.o � �_ d. w..... °., ., rawerro sunroue.r.euewnmes Z z R o
t 1.. '�1' `' 43.....3MCI and repave:..'"'�"^""... f ; + '"4*In • I ., :�.. . .:.w..M W Cu
-;I••• � • -/.4!j="''' ' OMC+,«.M.v...b.r..N..1ONl.Oq
:.'. and restripe — 0 U
.. � e.M.Ci.YM N.N....roMMl.M.bM!
14 M.NO Nl MM�I.,.h•....■.Y06.,M..
........1...ww e..r....p.rr..yropN'r.t104+...0
1 I •
Y... �.1 :♦ .,tv Y w .., MIAOW N..N�ONlrIi0M.01.rR..r.,,••
. • / L �''" A .r\• �^ N..�"'^ ...N '. ..•wR .1� M I e MM..oa rnMr.lORALUO r.,01.0,YC.O.
7 +' ....r eu.N..ma
111144.14.1
' ( ; I la S w S ���... .... { fdRMC10R nuns r v ROW ROO
A
y' :'; N� Know whirrs below. t,. N...wMW
1 �.ye s.ua V.
,, A• -"I.: YL.``•.,, , �. . ,. Call Won You Oq. .o.,
I. I I n 1 I,' i• ..•` . \ ••`.••�•.•_ CONTRACTOR NOTES: °�
• J._ i ••• . -vOfW.a..O NObIMNiYK.M
m,nw.c+a ro aa..erunm
e 1 mI. .G.,t,^.. .w>', / '4ii... _. ..� CC•••••..MVROH..n.+.rwevn.n
• gip,- •.I rm. - - - 1 ..Mtr..Y NO mum.. ,\ cve.,w.C.•4••. ,141.
idj I I . RI.N.onu m,...c.. .un+n SITE PLAN(1 OF
Ree `� ;I� r, n°. .. I`' rrrrNuroua,u
"t SDP-23-00041 ""'"
1o0F50 C2C
ESTIMATE Date: September 16,2025
Estimate#: 11031786
LONE TAR Customer: City of Round Rock
PAVING Project: Sports Center Project
11675 Jollyville Road,Suite 150
Austin,TX 78759 Mill and Pave
2400 Chisholm Trail Road
Estimator: Kevin Carter Round Rock,Texas 78681
Phone: 512-428-5778
Fax: 512-233-0628 Contact:
Cell: 512-289-9295
Email: kevin.carter@Ispaving.com I
Mill/Pave Opt 2-Price to mill and pave approx 7050 Sy of 2"Ty 7,050.00 Sq Yd 19.43 $136,981.50
DICOA approved HMAC Asphalt.
Pricing Excludes All Taxes-Tax Exemption Form Required Total: $136,981.50
Proposal Expiration. 03/16/2026
Pricing includes(1)mobilization.Any additional mobilizations will be$7,500.00 Each.
Proposal must be accepted within 30 days of Proposal Date.
Accepted Proposals will be valid for Nine Months from Proposal Date.Pricing Subject to Change after Nine Months.
Material Overruns will be charged at$150/ton
EXCLUDES . BONDING, PERMITS, UTILITY ADJUSTMENTS, TESTING, LAYOUT OR SURVEYING, SAFETY SLOPE INSTALL/REMOVAL, TEMP TAPERS
FOR UTILITIES, EXCAVATION, SAWCUTTING, TRAFFIC CONTROL OR FLAGMEN, LANE CLOSURE FEES OR PERMITS, TEMPORARY OR
PERMANENT STRIPING,NIGHT OR WEEKEND WORK,SWEEP/CLEAN PRIOR TO PAVING AND ANY ITEMS OF WORK NOT SPECIFICALLY QUOTED.
LONE STAR PAVING ("LSP") WILL EXECUTE ONLY THOSE ITEMS OF WORK LISTED IN THE "SCOPE OF WORK" ABOVE. ANY ADDITIONAL ITEMS
OF WORK WILL REQUIRE A WRITTEN CHANGE ORDER IN ADVANCE. LSP IS NOT RESPONSIBLE FOR DRAINAGE ISSUES ON SLOPES LESS THAN
2%. ALL QUANTITY OVERRUNS WILL BE VERIFIED IN PLACE UPON COMPLETION AND BILLED AT UNIT PRICES SHOWN ABOVE. THE ABOVE
QUOTED PRICES ARE SUBJECT TO CHANGE IF NOT ACCEPTED BY SIGNING THIS QUOTE WITHIN THIRTY DAYS FROM THE PROPOSAL DATE; IF
ACCEPTED IN ACCORDANCE WITH THESE TERMS, QUOTED PRICES ARE FIRM UNTIL PROPOSAL EXPIRATION DATE ABOVE IN RED. IF LSP IS
UNPAID BY THE 15TH DAY OF THE FOURTH MONTH FOLLOWING THE MONTH IN WHICH THE WORK WAS PERFORMED, THE ENTIRETY OF ITS
WARRANTY OBLIGATIONS, WHETHER CONTAINED IN THIS QUOTE OR IN A SEPARATE SUBCONTRACT WITH YOU, SHALL BE NULL AND VOID.
This quote will become part of the subcontract agreement, and shall supersede any other conflicting language In the subcontract agreement
between the parties. Asphalt paving standards for newly constructed areas are proposed to comply with the Texas Department of Transportation hot
mix standards. Other paving specifications must be specifically outlined. All permits and fees are excluded unless otherwise noted. LSP is not
responsible for utility lines less than 12 Inches deep. Customer/Owner is responsible for protecting the work site from tenants, customers, other
work activities, and will bear any additional costs of repairing work. LSP will carry Workers Compensation, General Liability, and Auto Insurance for
labor provided In the performance of this contract The amounts included in this estimate are based on information provided to-date, and are
subject to change if new Information is provided or differing site conditions are encountered. LSP is only responsible for its asphalt work, and
expressly excludes Injury, warranty, damages, and remediation to business or property if there are deficiencies with the subgrads or base, which
shall meet or exceed the governing specifications, and shall also meet or exceed the ride specifications. From time to time, the paving surface may
have areas whereby additional hotmix must be applied to achieve desired results, and the fees for these additional amounts of materials will be
discussed and agreed to prior to commencement of work All changes in the scope of the work must be agreed prior to the commencement of work.
Full payment for LSP's services is due 30 days from the date of the Invoice. No retainage shall be withheld from any payments due LSP. If payment
and/or performance bonds are required and the cost of such bonds is not included in LSP's quote, 1.5% shall be added to the overall bid price
Testing for HMAC QCQA Items only. LSP shall retain all production, ride, and placement bonus/penalty on HMAC items) according to specification
where applicable. The bonus/penalty calculations shall be based on LSP's unit prices or the unit bid prices, whichever Is greater. Maximum one (1)
year warranty on materials and workmanship. Payments should be remitted to Asphalt Inc, LLC dlb/a Lone Star Paving, PO Box 200608, Austin, TX
78720. Interest shall accrue for all amounts past due at the rate of eighteen percent (18Y.) compound interest per annum or highest legal limit
Customer agrees to pay attorneys' fees, expert fees, all costs of court, and any other expenses incurred by LSP in the collection of any sums due
under the performance of this contract. The venue for any legal action under this contract shall be Travis County, Texas. The parties expressly agree
to waive the right to a Jury trial. Pricing based on (and subject to) a mutually agreeable contract being executed by both parties. LSP shall not be
liable for any failure of or delay in the performance of Its work for the period that such failure or delay is due to causes beyond its reasonable
control, Including but not limited to, acts of God, epidemic, pandemic, abnormal weather conditions, war, strikes or labor disputes, embargoes,
government orders or any other force majeure event If delayed by a force majeure event, LSP shall be entitled to an extension of time equal to the
length of the delay and an Increase in price If LSP's prices have been increased as a result of such force majeure event.
The above prices,specifications,and conditions are satisfactory and are hereby accepted. Payment will be made as
outlined above.
Accepted By: Date:
Stripe-it—tap
PO Box 200544
Austin,Tx 78720
9/23/2025
Project Name Round Rock Sports Center Expansion Proposal # MM9231321
Address 2400 Chisholm Trail Rd Customer GC
City/State/Zip Round Rock,TX 78681
Tax Status Exempt
Class 14.New Construction
Line
Item Description Qty U/M UC Line Total
North Lot:
1 Crack Fill Crew Minimum;Crack Fill Lines>1/4"in Width 1 LS excluded
2 Sealcoat Existing HMAC w/Premium Asphalt Emulsion(1 Coat) 58,836 SF $ 0.15 $ 8,825.40
3 Restripe Existing Markings,Graphics,Hatching,&Fire Lane to Match 1 LS $ 4,000.00 $ 4,000.00
Existing Conditions
Price Includes(1)Stnping Crew Mob',Any Add!are$1,000/ea
Price Includes(1)Sealcoat Mob;Any Add'I are$3,500/ea
Price Includes Minor Surface Prep w/Brooms&Blowers;Removal of
Heavily Caked on Mud/Dirt/Clay by Others
Proposal is Valid for 90 Days All Proposals are subject to S/U's Terms&Conditions on following page
Subtotal $ 12,825.40
Accepted By
Customer Signature Date Tax(8 25%)
Submitted By Total $ 12,825.40
Michael Martin (512)893 5420
Date A..H EFT&Cheek Payments Ohl Y
Estimator michael@siutx.com
1 of 2
Stripe-it-tip
PO Box 200544
Austin,Tx 78720 9/23/2025
#REF! #REF! #REFI #REF!
#REFI #REF! #REFI #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
General Terms &Conditions for services of Stripe-It-Up, LLC
Terms&Conditions—
The amounts included in this estimate are based on information provided and are subject to change if new information is
provided or differing site conditions are encountered.All changes in the scope of the work must be agreed prior to the
commencement of work. Proposal Excludes Bonding, Permits, Layout or Surveying, Excavating, Saw Cutting, Traffic Control or
Flagman. Night work or weekend work, sweep/clean prior to scope of work above and any items of work not specifically
quoted. Stripe-It-Up will execute only those items of work listed in the "scope of work" any additional items of work will require
a written change order in advance.Actual quantities will be verified in place upon completion and billed at unit prices shown
above.All agreements must be made in writing. Scope of Work standards for newly constructed areas are proposed to comply
with the Texas Department of Transportation standards. Other Scope of Work specifications must be specifically outlined. All
permits and fees are excluded unless otherwise noted. Stripe It Up is not responsible for utility lines less than 12 inches deep.
Insurance—
Stripe-It-Up will carry workers compensation, General Liability, and Auto Insurance for labor provided in the performance of this
contract.
Customer Responsibility—
Billing instructions/portals must be provided &set up prior to scheduling work.Contractor agrees to pay reasonable attorney
fees, expert fees, all costs of court, compliance request, billing portals, courier expenses outside of normal postage and any
other expenses incurred by Stripe-It-Up in the collection of any sums due under the performance of this contract. The venue for
any legal action under this contract shall be Travis County,Texas.The parties expressly agree to waive the right to a jury trial.
The above prices, specifications, and conditions are satisfactory and are hereby accepted. Payment will be paid in Full as
outlined above. Fees for our services are due 30 days from the date of the invoice. Payments should be remitted to Stripe-It-Up,
PO Box 200544, Austin, TX 78720.
Stripe It Up, LLC Does NOT Accept P-Card/Debit/Credit Card Payments. ACH/EFT& Checks Only.
2 of 2
CONTINGENCY USE AUTHORIZATION
CUA 042 Added Coffee Maker ^ i
ioy LDINO Q,
Project: Round Rock Sports Center ' KING
Project No.: 2409
Date: 9/8/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Added water line to concessions area for coffee maker from PR 8 add
Assumptions/Clarifications:
ITEM DESCRIPTION LABOR MATERIAL&SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 Precision Plumbing - - - 1 Is 3,402 00 3,402
2 - - - -
3 - - -
4 - - - - - - -
5 - -
Total Materials&Subs 3,402
Total Labor 0
Subtotal 3,402
Total 3,402
Signature of approval:
Date
Architect
Date
Owner's Representative
Palmate, 7it6fey
Date September 8,2025
John King Construction
Prepared By King Construction Page 1 of 1 Printed:9/8/2025
CONTINGENCY USE AUTHORIZATION �'1
CUA 047 Paint Color Changes N J v ,
QVIt.01NO R`
Project. Round Rock Sports Center ` • KING
Project No.: 2409
Date: 9/19/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Paint changes,n field,items on plans not called for paint
Assumptions/Clarifications:
ITEM DESCRIPTION LABOR MATERIAL&SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL.
1 Repaint Tilt Wall Panel Weld Plates - - - - 1 Is 2,080.00 2,080
2 Repaint Steel Headers-Bondo no cost by JKC - - - - 1 Is 720.00 720
3 Repaint Steel Lintels-Bondo no cost by JKC - - - - 1 Is 615.00 615
4 Repaint Pipes at Ceiling - - - - 1 Is 1,920.00 1,920
5 Paint Steel Mesh Cage at Concessions - - - - 1 Is 1,625.00 1,625
Total Materials&Subs 6,960
Total Labor 0
Subtotal 6,960
Total 6,960
Signature of approval:
Date
Architect
Date
Owner's Representative
pit./ tgorey Date September 19,2025
John King Construction
Prepared By:King Construction Page 1 of 1 Printed:9/19/2025
ACTION DECORATING, INC.
Commercial Painting&Wallcovering 11002 Plains Trail
Austin, Texas 78758
512-491-8900
August 28, 2025
John King Construction
Attn: Johnny Abney
Re: Round Rock Sports Center Expansion—Change Order#005
Scope: Extras—repaint work due to color change, extra paint work for steel not shown on plans to paint, and
damage from other trades
Repaint(32)steel plates due to color change: $2,080.00
Repaint(4)steel headers due to bondo work: $720.00
Repaint(4) steel lintels due to bondo work: $615.00
Repaint(6) pipes due to color change: $1,920.00
Soffit duu tv Janrayt f.Orri Others. $000.00
Paint steel mesh caging at 2' floor concessions—plans do not call for paint: $ 1,625.00
Total CO Amount: $7,840.00
Should you have any questions or comments regarding this pricing, please contact me.
Ben Miller
Project Manager
Action Decorating, Inc.
512-289-6130
CONTINGENCY USE AUTHORIZATION r-\
CUA 051 Amazon Electrical, Misc Adds ^ }
v INCso19 By,
Project: Round Rock Sports Center \Is' KING.
Project No 2409
Date: 9/25/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Misc electrica adds and amazon install budget
Assumptions I Clarifications:
ITEM DESCRIPTION LABOR MATERIAL&SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
-
1 Nunn-Elec Install for Amazon-Pending Scope BUDGET - - - - 1 Is 10,000 00 10,000
2 Nunn-Heat Trace for Sprinkler Pipe - - - - 1 Is 376.00 376
3 Nunn-Duct Heater In Lobby-No Circuit Shown - - - - 1 Is 6,192.00 6,192
4 Nunn-Men Door Control Power-North - - - - 1 Is 177.00 177
5 Nunn-Men Door Control Power-South - - - - 1 Is 100.00 100
6 Nunn-Irrigation Control Power - - - - 1 Is 354.00 354
7 Nunn-Added 1.25"Conduit for Concessions - - - - 1 Is 1,722.00 1,722
Total Materials&Subs 18,921
Total Labor 0
Subtotal 18,921
Total 18,921
Signature of approval:
Date
Architect
Date
Owner's Representative
Pdt""'7 filet Date September 25,2025
John King Construction
Prepared By:King Construction Page 1 of 1 Printed:9/25/2025
ild Gerald Nunn Electric, L.L.C. Change Order
G E 410 N. Patterson Ave.
Florence, TX 76527 Date Change Order#
TECL#17611 9/25/2025 13301
Name/Address Ship To
John King Construction, Ltd. Round Rock Sports Expansion
7511 O'Connor Dr 2400 Chisholm Trail
Round Rock,TX 78681 Round Rock,TX 78681
Contract No. Terms Rep Project# Project Contract Date
2409 Net 10 J.A. 2409 Ileat Trace for Sprin... 05/06/2024
Description Total
Heat Trace for Sprinkler Pipe-see attached back-up 376.00
Submitted for Approval awaiting full)executed CO to Proceed
Subtotal $376.00
Sales Tax (8.25%) s0.00
Tota I $376,00
Signature — _._ ..
Phone# Fax# E-mail Web Site
254-793-3539 254-793-4263 LINDAn,GNELI.CTX.COM www.GNELLCTX.com
9/25/2025 2:21:35 PM Page 1
Round Rock Sports Center Expansion:Heat Trace for Sprinkler Pipe
Totals(Summary)-Bid Summary: Default
Material
Non-Quoted $59.94
Quotes 0.00
Sales Tax(0 00%) 0.00
Total Material $59 94
Labor
Direct(2 36 hours @$112 50) $265 50
Non-Productive Labor 0 00
Total Labor (2 36 hours) $265.50
Direct Job Expenses $0.00
Toots and MiscePaneous Materials 0.00
Subcontracts 0.00
Job Subtotal(Prime Cost) $325.44
Overhead(7.50%) 24.41
Profit(7 50%) 26 24
Job Total $376 09
Actual Bid Price $376 09
Material to Died Labor ratio 0 18
Prime Cost per square foot $0.00
Job Total per square foot $0.00
Actual Bid Price per square ft $0.00
Labor cost per square foot $0.00
Labor hours per square foot 0.00
Gross Profit% 13.47
Gross Profit$ $50.65
Net Profit% 6 98
9/25/2025 2:21:50 PM Page 1
Round Rock Sports Center Expansion : Heat Trace for Sprinkler Pipe
Job Number: 1000014929
Bid Summary: Default
Extension By Phase
Item# Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr
—04 Above Ground Branch Raceway—
1001 3/4"EMT 10 81.27 C 8.13 5.00 C 0.50
1485 3/4"Compression Steel Connector 2 26 68 C 0.53 0.20 E 0.40
1565 3/4"Compression Steel Coupling 1 28.59 C 0.29 0.30 E 0.30
2360 3/4"Conduit Hanger w/Bolt 1 79.94 C 1.00 25.00 C 0.31
--04 Above Ground Branch Raceway Total— 9.95 1.51
--05 Feeder Wire—
2662 #8 THHN CU Stranded Wire 45 583 72 M 26.27 10 00 M 0.45
—05 Feeder Wire Total— 26.27 0.45
—07 Switchgear---
3936 30A 1 P 120/240V Bolt-On Circuit Breaker 1 23 72 E 23 72 0 40 E 0.40
—07 Switchgear Total— 23 72 0 40
Job Total 59 94 2.36
•Target,Labor column 3
9/25/2025 2:22:02 PM Page 1
Round Rock Sports Center Expansion:Heat Trace for Sprinkler Pipe
Bid Summary:Default
Material List By Phase
Item# Description Quantity
—04 Above Ground Branch Raceway-
1001 3/4"EMT 10
1485 3/4"Compression Steel Connector 2
1565 3/4"Compression Steel Coupling 1
2360 3/4"Conduit Hanger w&Bolt 1
---05 Feeder Wire---
2662 #8 THHN CU Stranded Wire 45
• 07 Switchgear--
3936 30A 1 P 120/240V Bolt-On Circuit Breaker 1
Gerald Nunn Electric, L.L.C. Change Order
G;L- �. 410 N. Patterson Ave.
Florence, TX 76527 Date Change Order#
TECL#17611 9+25./2025 13302
Name I Address Ship To
John King Construction, Ltd. Round Rock Sports Expansion
7511 O'Connor Dr 2400 Chisholm Trail
Round Rock,TX 78681 Round Rock,TX 78681
Contract No. Terms Rep Project# Project Contract Date
2409 Net 10 J.A. 2409 Duct heater in Lobb} 05.:06/2024
Description Total
Duct Heater in Lobby -see attached back-up. 6,192.00
Submitted for Approval awaiting fully executed CO to Proceed
Subtotal S6.192.00
Sales Tax (8.25%) so.00
Total $6,192.00
Signature _._.
Phone# Fax# E-mail Web Site
254-793-3539 254-793-4263 LINDA•i'GNELLC1'X.COM w\v‘%.GNLL1.CTXcom
9/25/2025 2:19:27 PM Page 1
Round Rock Sports Center Expansion:Duct Heater in Lobby
Totals(Summary)-Bid Summary:Default
Material
Non-Quoted $875.17
Quotes 0.00
Sales Tax(0 00%) 0.00
Total Material $875.17
Labor
Direct(39 85 hours @$112 50) $4,483.12
Non-Productive Labor 0.00
Total Labor (39 85 hours) $4,483.12
Direct Job Expenses $0.00
Tools and Miscellaneous Materials 0.00
Subcontracts 0.00
Job Subtotal(Prime Cost) $5,358.29
Overhead(7 50%) 401.87
Profit(7 50%) 432.01
Job Total $6,192.17
Actual Bid Price $6 192 17
Material to Direct Labor ratio 0 16
Prime Cost per square foot $0.00
Job Total per square foot $0.00
Actual Bid Price per square ft $0.00
Labor cost per square foot $0.00
Labor hours per square foot 0 00
Gross Profit% 13 47
Gross Profit$ $833.88
Net Profit% 6 98
9/25/2925 2:19:39 PM Page 1
Round Rock Sports Center Expansion: Duct Heater in Lobby
Job Number: 1000014930
Bid Summary: Default
Extension By Phase
Item# Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr
-04 Above Ground Branch Raceway-
1001 3/4"EMT 250 81.27 C 203.18 5.00 C 12.50
1485 3/4"Compression Steel Connector 2 26 68 C 0.53 0.20 E 0.40
1565 314"Compression Steel Coupling 25 28 59 C 7.15 0.30 E 7.50
2360 3/4"Conduit Hanger w/Bolt 31 79 94 C 24.98 25.00 C 7.81
2477 4-11/16"Square Box w/brkt Comb KO's 5 2,924 18 C 146.21 0.30 E 1.50
-04 Above Ground Branch Raceway Total- 382.05 29.71
-05 Feeder Wire-
2663 #6 THHN CU Stranded Wire 300 898.09 M 269.43 12 00 M 3.60
-05 Feeder Wire Total- 269 43 3 60
--06 Brach Wire-
2682 #10 THHN CU Solid Wire 473 307 05 M 145.08 7.50 M 3.54
-06 Brach Wire Total- 145.08 3.54
-07 Switchgear-
3226 30A/3P 240V GD NF Safety Sw-Nema 1 1 49.41 E 49.41 2.20 E 2.20
-07 Switchgear Total- 49 41 2 20
-09 Trim-
5081 4.11/16"Square Blank Cover 5 584 00 C 29.20 0 16 E 0.80
-09 Trim Total- 29.20 0.80
Job Total 875.17 39 85
•Target, Labor column 3
9/25/2025 2:19:47 PM Page 1
Round Rock Sports Center Expansion: Duct Heater in Lobby
Bid Summary:Default
Material List By Phase
Item it Description Quantity
---04 Above Ground Branch Raceway--
1001 3/4"EMT 250
1485 3/4"Compression Steel Connector 2
1565 3/4"Compression Steel Coupling 25
2360 3/4"Conduit Hanger w/Bolt 31
2477 4-11/16"Square Box w/brkt Comb KO's 5
---05 Feeder Wire
2663 #6 THHN CU Stranded Wire 300
---06 Brach Wire---
2682 #10 THHN CU Solid Wire 473
---07 Switchgear--
3226 30A/3P 240V GD NF Safety Sw-Nema 1 1
--09 Trim---
5081 4 11/16"Square Blank Cover 5
Gerald Nunn Electric, L.L.C. Change Order
c9 E 410 N. Patterson Ave. -
i‘I
Florence, TX 76527 Date Change Order#
TECL#176 l 1 9 25'2o25 13303
Name/Address Ship To
John King Construction, Ltd. Round Rock Sports Expansion
7511 O'Connor Dr 2400 Chisholm Trail
Round Rock, TX 78681 Round Rock,TX 78681
Contract No. Terms Rep Project# Project Contract Date
2409 Net 10 J.A. 2409 Mezzanine Door Co.. 05t06/2024
Description Total
Mezzanine Door Controls North -see attached back-up 177.00
Submitted liar Approval an tilting full) executed CO to Proceed
Subtotal S 177.00
Sales Tax (8.25%) s0 00
Total S 177.00
Signature
Phone# Fax# E-mail Web Site
254-793-3539 254-793-4263 LINDA@GNELLCTX.COM ‘vww.GNELL.CTX.com
9/25/2025 2:02:37 PM Page 1
Round Rock Sports Center Expansion :Mezzanine Door Controls North
Totals(Summary)-Bid Summary: Default
Materia.
Non-Quoted $12.28
Quotes 0.00
Sales Tax(0 00%) 0 00
Iota'Material $12 28
Labor
Direct(1 25 hours @$1 12 50? $140.63
Non-Productive Labor 0 00
Total Labor (1 25 hours) $140 63
Direct Job Expenses 50.00
Tools and Miscellaneous Materials 0 00
Subcontracts 0 00
Job Subtotal(Prime Cost) $152 91
Overhead(7 50%) 11 47
Profit(7 50°4:) 12 33
Job Total $176.71
Actual Bid Price $176.71
Materia to Direct Labor ratio 0.08
Prime Cost per square foot $0.00
Job Total per square foot $0.00
Actual Bid Price per square ft $0.00
Labor cost per square foot $0.00
Labor hours per square foot 0.00
Gross Profit% 13.47
Gross Profit$ $23 80
Net Profit% 6 98
9/25/2025 2:02:46 PM Page 1
Round Rock Sports Center Expansion:Mezzanine Door Controls North
Job Number: 1000014928
Bid Summary:Default
Extension By Phase
Item# Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr
--04 Above Ground Branch Raceway—
1000 1/2"EMT 5 52.56 C 2.63 4.50 C 0.23
1444 1/2"Set Screw Steel Conn 2 40.11 C 0.80 0.08 E 0.16
1544 1/2"Set Screw Steel Cplg 2 26.40 C 0.40 0.10 E 0.15
2338 1/2"1-Hole Strap 2 15 12 C 0 23 4 00 C 0.06
2469 4"Square Box(1/2&3/4 KO's) 1 188 64 C 1.89 0 30 E 0.30
—04 Above Ground Branch Raceway Total— 5.95 0.90
---06 Brach Wire--
2660 #12 THHN CU Stranded Wire 20 217 26 M 4.35 6.00 M 0.12
6133 Red Wirenuts(10-18 guage) 3 145 79 M 0 44 3.50 C 0.11
---06 Brach Wire Total— 4 79 0.23
--09 Trim—
5080 4"Square Flat Blank Cover w/KO 1 154.01 C 1.54 0 12 E 0.12
---09 Trim Total— 1.54 0 12
Job Total 12.28 1 25
Target,Labor column 3
9/25/2025 2:02:55 PM Page 1
Round Rock Sports Center Expansion ; Mezzanine Door Controls North
Bid Summary: Default
Material List By Phase
Item# Description Quantity
---04 Above Ground Branch Raceway—
1000 1/2"EMT 5
1444 1/2"Set Screw Steel Conn 2
1544 1/2"Set Screw Steel Cplg 2
2338 1/2"1-Ho'e Strap 2
2469 4 Square Box(1/2&3/4 KO's) 1
---06 Brach Wire---
2660 #12 THHN CU Stranded Wire 20
6133 Red Wirenuts(10.18 guage) 3
---09 Trim---
5080 4"Square Flat Blank Cover w/KO 1
Fl, Gerald Nunn Electric, L.L.C. Change Order
Eiii. 410 N. Patterson Ave.
Florence,TX 76527 Date Change Order#
TECL#]7611 9n5n025 13304
Name/Address Ship To
John King Construction, Ltd. Round Rock Sports Expansion
7511 O'Connor Dr 2400 Chisholm Trail
Round Rock,TX 78681 Round Rock, TX 78681
Contract No. Terms Rep Project# Project Contract Date
2409 Net 10 1 A 2409 Mezzanine Door Co... 05/06/2024
Description Total
Mezzanine Door Controls South -see attached back-up 100.00
Submitted for Approval awaiting fully executed CO to Proceed
Subtotal sioo.00
Sales Tax (8.25%) so.00
Total s 100.00
Signature
Phone# Fax# E-mail Web Site
254-793-3539 254-793-4263 LINDA4%GNIiLLCI X.COM www.GNELLCTX.com
9/25/2025 1:58:21 PM Page 1
Round Rock Sports Center Expansion: Mezzanine Door Controls South
Totals(Summary)-Bid Summary:Default
Matera'
Non-Quoted $4.10
Quotes 0.00
Sales Tax(0 00%) 0 00
Total Materal $4 10
Labor
Direct(0.73 hours @ 5112.50) $82.13
Non-Productive Labor 0 00
Total Labor (0.73 hours) 582.13
Direct Job Expenses $0.00
Tools and Miscellaneous Materials 0.00
Subcontracts 0 00
Job Subtotal(Prime Cost) $86.23
Overhead(7.50%) 6.47
Profit(7 50%) 6 95
Job Total 599 65
Actual Bid Price S99 65
Material to Direct Labor ratio 0.05
Prime Cost per square foot $0.00
Job Total per square foot $0.00
Actual Bid Price per square ft $0.00
Labor cost per square foot $0.00
Labor hours per square foot 0.00
Gross Profit% 13 47
Gross Profit$ $13 42
Net Profit% 6 97
9/25/2025 1:58:29 PM Page 1
Round Rock Sports Center Expansion :Mezzanine Door Controls South
Job Number: 1000014927
Bid Summary:Default
Extension By Phase
Item# Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr
—04 Above Ground Branch Raceway—
1000 1/2"EMT 3 52 56 C 1.58 4.50 C 0.14
1484 1/2"Compression Steel Connector 2 19 15 C 0.38 0 18 E 0 36
1564 1/2"Compression Steel Coupling 0 22 57 C 0 07 0.25 E 0.08
2359 1/2"Conduit Hanger w/Bolt 0 74 17 C 0 28 25 00 C 0 09
---04 Above Ground Branch Raceway Total— 2 31 0.67
—06 Brach Wire—
2681 #12 THHN CU Solid Wire 9 189 72 M 1 79 6 00 M 0 06
—06 Brach Wire Total— 1 79 0.06
Job Total 4.10 0 73
Target,Labor column 3
9/25/2025 1:58:37 PM Page 1
Round Rock Sports Center Expansion:Mezzanine Door Controls South
Bid Summary:Default
Material List By Phase
Item# Description Quantity
--04 Above Ground Branch Raceway---
1000 1/2 EMT 3
1484 1/2'Compression Steel Connector 2
1564 1/2'Compression Steel Coupling 0
2359 1/2"Condu t Hanger w/Bolt 0
---06 Brach Wire•
2681 #12 THHFJ CU Solid Wire 9
I Gerald Nunn Electric, L.L.C. Change Order
E410 N. Patterson Ave.
Florence, TX 76527 Date Change Order#
TECL#17611
9/25/2025 13305
Name/Address Ship To
John King Construction, Ltd. Round Rock Sports Expansion
7511 O'Connor Dr 2400 Chisholm Trail
Round Rock, TX 78681 Round Rock, TX 78681
Contract No. Terms Rep Project# Project Contract Date
2409 Net 10 J.A. 2409 Irrigation Control Po... 05/06/2024
Description Total
Irrigation Control Power-see attached back-up 354.00
Submitted for Approval awaiting fully executed CO to Proceed
Subtotal $354.00
Sales Tax (8.25%) $o.00
Total $354 00
Signature —_.
Phone# Fax# E-mail Web Site
254-793-3539 254-793-4263 LINDA rr GNELLCI'X.COM ‘‘ww.GNELLC'I X com
9/25/2025 1:55:22 PM Page 1
Round Rock Sports Center Expansion:Irrigation COntrol Power
Totals(Summary)-Bid Summary:Default
Material
Non-Quoted $46 20
Quotes 0 00
Sales Tax(0 00%) 0.00
Total Material $46 20
Labor
Direct(2 31 hours @$112 50) $259 88
Non-Productive Labor 0.00
Total Labor (2 31 hours) $259 88
Direct Job Expenses $0.00
Tools and Miscellaneous Materials 0.00
Subcontracts 0 00
Job Subtotal(Pr me Cost) $306 08
Overhead(7 50%) 22.96
Profit(7 50%) 24 68
Job Total $353 72
Actual Bid Price $353 72
Material to Direct Labor ratio 0 15
Prime Cost per square foot $0.00
Job Total per square foot $0.00
Actual Bid Prce per square ft $0.00
Labor cost per square foot $0.00
Labor hours per square foot 0.00
Gross Profit% 13 47
Gross Profit$ $47 64
Net Profit% 6 98
9/25/2025 1:55:31 PM Page 1
Round Rock Sports Center Expansion:Irrigation COntrol Power
Job Number:1000014926
Bid Summary: Default
Extension By Phase
Item# Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr
-04 Above Ground Branch Raceway-
1000 1/2"EMT 15 52.56 C 7.88 4.50 C 0.68
1444 1/2"Set Screw Steel Conn 2 40 11 C 0.80 0.08 E 0.16
1544 1/2"Set Screw Steel Cplg 2 26.40 C 0.40 0.10 E 0.15
2338 1/2"1-Hole Strap 2 15 12 C 0.23 4.00 C 0.06
2470 4"Square x 1-1/2"Deep Box w/bkt(1/2&3/4 KO's) 1 431.60 C 4.32 0.30 E 0.30
4892 4"Square-3/0 Plaster Ring-5/8"D 1 300 49 C 3.00 0.15 E 0.15
-04 Above Ground Branch Raceway Total- 16.63 1.50
---06 Brach Wire---
2660 #12 THHN CU Stranded Wire 50 217.26 M 10.86 6 00 M 0.30
6133 Red Wirenuts(10-18 guage) 3 145 79 M 0 44 3.50 C 0.11
-06 Brach Wire Tota'- 11.30 0 41
--07 Switchgear-
3934 20A 1P 120/240V Bolt-On Circuit Breaker 1 18 27 E 18.27 0.40 E 0 40
-07 Switchgear Total- 18.27 0 40
Job Total 46 20 2 31
Target.Labor column 3
9/25/2025 1:55:39 PM Page 1
Round Rock Sports Center Expansion :Irrigation COntroi Power
Bid Summary: Default
Material List By Phase
Item# Description Quantity
- 04 Above Ground Branch Raceway---
1000 1/2 EMT 15
1444 1/2"Set Screw Steel Conn 2
1544 1/2"Set Screw Steel Cpig 2
2338 1/2"1-Hole Strap 2
2470 4"Square x 1.1/2"Deep Box w/bkt(1/2&3/4 KO's) 1
4892 4"Square-310 Plaster Ring-5/8"D 1
--06 Brach Wire -
2660 #12 THHN CU Stranded Wire 50
6133 Red Wirenuts(10-18 guage) 3
---07 Switchgear---
3934 20A 1P 120/240V Boft-On Circuit Breaker 1
-1,.. ' Gerald Nunn Electric, L.L.C. Change Order
g:. E 410 N. Patterson Ave.
Florence, TX 76527 Date Change Order#
TECL #17611 4/25 2025 13306
Name/Address Ship To
John King Construction, Ltd. Round Rock Sports Expansion
7511 O'Connor Dr 2400 Chisholm Trail
Round Rock, TX 78681 Round Rock, TX 78681
Contract No. Terms Rep Project# Project Contract Date
2409 Net 10 J A 2409 1 1 4 Racewa> for A... 0506'2024
Description Total
see attached back-up 1,722.00
Amazon 1.25" Conduit
Submitted for Approval awaiting fully executed CO to l'roceed
Subtotal $1.722.00
Sales Tax (8.25%) $0.00
Tota I $1.722 00
Signature
Phone# Fax# E-mail Web Site
254-793-3539 254-793-4263 LINDArFi'GNCLLCTX COM www.GNELLCTX.com
9/25/2025 1:46:10 PM Page 1
Round Rock Sports Center Expansion:1 1/4 raceway for Amazon
Totals(Summary)-Bid Summary:Default
Material
Non-Quoted $106,99
Quotes 0.00
Sales Tax(0.00%) 0.00
Total Material $106.99
Labor
Direct(10 52 hours @$112 50) $1,183.50
Non-Productive Labor 0.00
Total Labor {10 52 hours; $1.183.50
Direct Job Expenses S0.00
Tools and Miscellaneous Materials 200.00
Subcontracts 0.00
Job Subtotal(Prime Cost) $1,490.49
Overhead(7.50%) 111.79
Profit(7.50%) 120.17
Job Total S1,722.45
Actual Bid Price $1,722 45
Material to Direct Labor ratio 0 08
Prime Cost per square foot S0.00
Job Total per square foot $0.00
Actual Bid Price per square ft $0.00
Labor cost per square foot S0 00
Labor hours per square foot 0 00
Gross Profit% 13 47
Gross Profit$ $231.96
Net Profit% 6.98
9/25/2025 1:46:27 PM Page 1
Round Rock Sports Center Expansion:1 1/4 raceway for Amazon
Job Number: 1000014925
Bid Summary:Default
Extension By Phase
Item# Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr
--03 Above Ground Feeder Raceway--
1003 1-1/4"EMT 40 232.47 C 92.99 6.20 C 2.48
1336 1-1/4"EMT Field Bend 4 0.00 E 0 00 0 64 E 2.56
1487 1-1/4"Compression Steel Connector 2 109 40 C 2.19 0.30 E 0.60
1567 1-1/4"Compression Steel Coupling 7 79.06 C 5 53 0 50 E 3.50
2362 1-1/4"Conduit Hanger w/Bolt 5 125 60 C 6.28 27 50 C 1.38
—03 Above Ground Feeder Raceway Total— 106 99 10.52
Job Total 106 99 10 52
•Target.Labor column 3
9/25/2025 1:46:43 PM Page 1
Round Rock Sports Center Expansion : 1 1/4 raceway for Amazon
Bid Summary:Default
Material List By Phase
Item# Description Quantity
--03 Above Ground Feeder Raceway---
1003 1-1/4"EMT 40
1336 1-1/4"EMT Field Bend 4
1487 1-1/4"Compression Steel Connector 2
1567 1-1/4"Compression Steel Coupling 7
2362 1-1/4"Conduit Hanger w/Bolt 5
CONTINGENCY USE AUTHORIZATION
N *Ally
CUA 044 Added Sports Equipment Electrical Work
Project: Round Rock Sports Center o
Project No.: 2409 KING
Date: 9/8/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Added work due to sports equipment coordination
Assumptions/Clarifications:
ITEM DESCRIPTION r LABOR MATERIAL&SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 Nunn-SJOW Coords Down Poles 96 hr 112.50 10,800 1 Is 1,061.00 1,061
2 Nunn-Gym Equip Panel 88 hr 112.50 9,900 1 Is 2,754.49 2,754
3 Nunn-Added Circuits 128 hr 112.50 14,400 1 Is 995.08 995
4 Nunn-Misc and Overhead - - - 1 Is 9,708.00 9,708
5 JKC Credit back line 1 +Overhead - - - 1 Is (13,640.15) (13,640)
Total Materials&Subs 878
Total Labor 35,100
Subtotal 35,978
Total 35,978
I I
Signature of approval:
Date
Architect
Date
Owner's Representative
Pdigif y 1"" '7' Date September 8,2025
John King Construction
Prepared By King Construction Page 1 of 1 Printed 9/8/2025
IG Gerald Nunn Electric, L.L.C. Change Order
E 410 N. Patterson Ave.
id
Florence, TX 76527 Date Change Order#
TECL#1761 1 8/26/2025 13278
Name/Address Ship To
John King Construction, Ltd. Round Rock Sports Expansion
7511 O'Connor Dr 2400 Chisholm Trail
Round Rock, TX 78681 Round Rock, TX 78681
Contract No. Terms Rep Project# Project Contract Date
2409-26-I Net 10 J.A. 2409 T&M Ticket 05/06/2024
Description Total
Add Gym Equipment Drops to lower motors, Add Gym panel only for Gym 35,100.00
equipment, and Add circuits to Gym equipment for volleyball height adjuster. 312
hours labor'a:i$1 12.50
General Material 4,835.17
Equipment 2 -45' lifts 2 weeks 3,000.75
Subtotal for labor and material 42,935.92
7.5%Overhead 3,220.19
Subtotal after Overhead 46,156.1 I
7.5% Profit 3,461.71
Work is done please issue Change Order
Subtotal $49,617.82
Sales Tax (8.25%) so.00
Total $49.617.82
Signature
Phone# Fax# E-mail Web Site
254-793-3539 254-793-4263 LINDAri.ONELLCrX COM www.GNELLCTX.com
(-7 y1,4%.
e et.Li/19 the„,-. ipS 1-o (0wCt rno7-or-f
v„.5 (l $7 b t...) dos..)vv. Y". re. , ps re Ls.
j Pr; 1k vk 3 i" +.0 V---1- bco es , ago! or Go vat (ap.r .
764.5- I
7/I3 f� Re /f
f , e-e4,-rO - gi.r 16
_7/4141 ct(f T, CZc-r,64-0 r $6. I Po
� , w ;�l►ar gt"r f G
V312s-i�o c- J, dd _kt;a w• — ''kr I Co
/3l/i6' 'host U , w ari $ k r f(c
r i f
*444,
- -
T !
ar, -7v•r'1 ). vu4-0/ "" ,cx9l
r ri
xap f _11u07 iv -171x 8t
Sd .}s io I ,,hi£
// x09 _d . 1
Ste "`mod? ,,h� Z
St,.i $J^C9 ?"^a-'``r7 -}J�� 1t Z
/► Sr-A:19(T
f S Sv,j d na✓ ss ,,Ztir
--A' rVi IYN N-L $ # a00/
,. r1
$_a 4Th4 0 •s s „Z Z�
9
$ J►./d Vi ubQ s�1f
$ J^/8 }?.Nrod -hilt
1 "-try v/il Pia ter. )1(" 6
1
°!I "vyrri % 8 L' "/7W .p )7" G ' d/i
Nr-trir ,Ay $ ti,:4pw l r,"va
\-431,
/(71Y 0 -ram t,d ) 1 `69s ~ U"P Lu d,n' t.tt j9 1
Z �yr/ L:f ( - 2 �P� <<s
r
run 4- "PW r,n t
gid 4-or
ek.�s to ow'w. ���� � P f/-��
` - oN Gv;r‹.- soy. s - 6 9. ?m, ?2 it 0-3e)
- 20 ��p, B/a6 s - 1.343 V
yob ' -2/r " E!"7 ✓
yd - 3/y" ss Cc' p/,:Js ✓
- %'I SS CO�t Y1-Gt+/yrs' t�
� 3/v ' , ns 'n Caalo(y sf►-cam. ' �/
92 .66 S' ✓
7sz ' tf1N4-1 ✓
yt' 4 icy T-'XN
L 4 b-or Tap s,c�L.
ec,„find.- a �.�.� 1 ✓ o eteGt Gh./• L_a,r.71 i)nS
_. _v..Q.. r`-Ll ykt 4j isle r-ss� _
�a.. c
*PaP•T. Gc ' a - g c, ect-c-h COr
V3116 Jou t t,fi c tC0
[Ralf C - .--e-si-c-L‘ (0
' 7/?/1s du U. ;��;�.�.•, g c.r r". r to
Rc.if T. 4� ,,,-U rc,,,, ta.�,. G
Quote #48-31371
r, li ELLIOTT ELECTRIC SUPPLY 2501 S. FORT HOOD ST.
L:, P.O.Box 206524,Dallas,TX 75320-6524 KILLEEN,TX 76542-2312
-\....r../.-- www.ElliottElectric.com 254-554-5958
Page:1
Customer Account: (2796445) Ship To Information: Customer Phone: 254-793-3539 Customer Job/PO: ROUND ROCK SPORTS CENTER
GERALD NUNN ELECTRIC' ROUND ROCK SPORTS CTR EXP
410 N PATTERSON AVE 2400 CHISHOLM TRAIL RD
FLORENCE,TX 76527-3846 ROUND ROCK,TX 78681
•ATTENTION: Do Not Deliver From This Document!
Salesman: Werkheiser, Dom Quote Date: 8/2612025 Date and Time Printed: 8/26/2025 11:09:33 AM Origin Store: Temple (72)
Item Quote Catalog Vendor Unit Extended
Number Quantity Number Code Description Price Code Price
1 5 BAB1020 ETN TYPE BAB CIRCUIT BRKR 1P.20AMP 120/240V,10,000AIC, $ 17.39 E $ 86.95
2 430 EMT34 CON 3/4"EMT CONDUIT $ 82.27 C $ 353.76
3 40 241 DC BRI 3/4"DIECAST EMT SET/SCREW COUPLING $ 35.84 C $ 14.34
4 17 231 DC2 BRI 3/4'DIECAST EMT SET/SCREW CONNECTOR $ 33.54 C $ 5.70
5 40 BG812E24 BLI SPRG 1/2-3/4,25LB CNDT TO BM FSTNR.1/8-1/4 FLNG $ 137.25 C $ 54.90
6 9 TP403 CRS 4SQ 2-1/8D BX W/1/283/4 KO $ 148.14 C $ 13.33
7 1750 THHN8BKPCS COP THHN 8 STR BLACK PCS $ 547.54 M $ 958.20
6 1000 THHN1 OSTBK500 COP THHN 10 STR BLACK 500' $ 294.98 M S 294.98
9 16 EMT290 ROB 2',90D EMT ELB $ 1,074.96 C $ 171.99
10 20 B2213PAZN BLI BLTD 2"ZINC PLATED PRE-ASSEMBLED UNV PIPE CLAMP $ 164.72 C $ 32.94
11 32 235DC2 BRI 2"DIECAST EMT SET/SCREW CONNECTOR $ 208.86 C $ 66.84
12 100 EMT2 CON 2"EMT CONDUIT $ 328.04 C $ 328.04
13 4 245DC BRI 2"DIECAST EMT SET/SCREW COUPLING $ 216.31 C S 8.65
14 32 326 BRI 2"PLASTIC BUSHING $ 44.53 C $ 14.25
15 2 GBK14 CHD GROUND BAR KIT-14 TERM $ 10.88 E $ 21,76
16 4 921 S BRI 3/4"ONE HOLE EMT STRAP $ 14.03 C $ 0.56
17 1 ASG18X18X6NK HOF 18X18X6 N1 GLV SC NK $ 80.44 E $ 80.44
18 1 101036HSNK BLI WWAY 10X10X36 N1 HC $ 207.08 E $ 207.08
19 2 101OHSE BLI WWAY 10X10 HS END $ 19.89 E $ 39.78
Total:$ 2,754.49
Continued On Alert Pane
...DUPLICATE... INVOICE NO. I INVOICE DATE
CED - AUSTIN 0234-1155713 07/24/25
1033 MEISTER LANE SUITE
4600 PLEASE SHOW INVOICE NO. AND REMIT TO:
PVUJGEAVILLE, TX 78660
T.512 458-6313 F.512 441-0433 P.O. BOX 206987
DALIAS, TX 75320-6987
SOLD TO: GERALD NUNN ELECTRIC, LLC. SNIP TO: GERALD NUNN ELECTRIC, LLC.
JOB: ROUND ROCK SPORTS CENTER EXPAN 2400 CBISOLM TRAIL RD
410 N. PAITERSON AVE ROUND ROCK, TX 78681
FLORENCE, TX 76549
"•3RDPTY-US-IgLIL/EMAILEDP
ACCOUNT NO. X4-21235 JOB NAME AND ADDRESS CUSTOMER ORDER NO.
ROUND ROCK SPORTS CENTER EX; 20225
SALESPERSON SNIPPING INFORMATION SHIP VIA SHIP DATE
0399 MA PREPAID OUR TRUCK 07/17/25
QUANTITY QUANTITY I
ORDERED PROOUCTCOOE DESCRIPTION o SNIPPED PRICE DISC. EXTENSION CM
m
T 300 CORD EMT3/4 3/4" EMT CONDUIT 300 78.84 C 236.52 2.0
T 30 KON SK75RKON 3/4 EMT SS COUP 30 24.76 C 7.43
T 14 RON SC75RKON 3/4 STL SS CONN 14 22.68 C 3.18
T 14 RACO 232 4SQ 2-1/80 BOX COFID KO 14 132.18 C 18.51 2.0
T 14 RACO 752 4IN SQ FLAT BLANK COVER 14 34.87 C 4.88 2.0
T 1000 WIRE THHNB-500R SS-THEN-8-BLK-19STR-CU-500R 1000 557.06 M 557.06
T 200 NSI GRP-6500 6" BLK CABLE TIE 50LB 200 4.63 C 9.26 2.0
T 20 PS BOX30 1/2" STRAIN RELIEF GRIP .30"-., B 5 19.52 E 97.60 2.0
T 800 WIRE 14/4 SJOOW B 0 960.00 M 0.00 X
PRICE OF 14/4 SJOOW DOESN'T INCLUDE FREIGHT
T 20 ANTI CG5OK 1/2" CORD GRIP KIT.125"-.650" 20 2.66 E 53.20 2.0
T 15 RACO 860 BLANK RANDYBOX COVER 15 37.20 C 5.58 2.0
T 5 RACO 864 RANDYBOX COVER F/DPLX RCPT 5 37.20 C 1.86 2.0
TIT1i TO MLRC4AIDISL AND RISK Or LOOS OR DANA=PANAMA AT POINT COOL: To ADVISL YOU,RONITLT COIMDICPMIMO TOUR ONVER. THIS COOS IS Ut=ON MERCHANDISE 995.08
or INIpNOR. CLAIMS POP IMOLT OR DA11A®IDOCNAADISU AMYL=MR OUR INPOICSJ. SALES TAX .00
NANN TO CALRIO. N -LACA OSOLRSD. WILL SUIT AS SOON AS RACI VSD IMi)S INSTRU T=TO
MaCMAlDI2P AMMO=1ITMOOT OUR COMSLMT WILL NOT MR ACCEPTED. SMPPING CHARGE .00
A SOCSTO[Rllp QARCQ WILL Si COOP CO ATOMS OOODS ORlitl
DLr1GTIVE OA TDODOR COUP ON OUR PART.
NET PAYMENT IS DUE BY THE 15TB OF
A■UVIQ CRAM=or I MC SLR MOMS, Nor NOT TO ET®TRE THE MONTH FOLLOWING PURCHASE TOTAL DUE 995.08
LIORST MOONS LANTULLT ALLOWED NI KAPLICANLL STAIN LAM, RILL
IR 1AOS ON ALL PAST DOS ACCOUNTS.
TRU SAIA IS SUN]1CT TO OUR TERMS LOCATDO AT
SALL1.00P-TpP2I.0711, NMICM VI NAT CLAIM room T21Q TO TINS
RITNOVT PRIOR MUSICS.
***DUPLICATE**. INVOICE NO I INVOICE DATE
CED - AUSTIN 0234-1155811 07/24/25
1033 MEISTER LANE SUITE
0600 PLEASE SHOW INVOICE NO. AND REMIT TO:
PFLUGSRVILLE, TX 78660
T-512 458-6313 F-512 441-0433 P.O. BOX 206987
TATIA5, TX 75320-6987
SOLD TO: GERALD NUNN ELECTRIC, LLC. SHIP TO: GERALD NUNN ELECTRIC, LLC.
JOB: ROUND ROCK SPORTS CENTER EXPAN 2400 CRISOLM TRAIL RD
410 N. RATTERSON AVE ROUND ROCK, TX 78681
FLORENCE, TX 76549
* 3RDPTY-US-MAIL/EMAI LED.".
ACCOUNTNO. X4-21235
JOB NAYS AND ADDRESS CUSTOMER ORDER N0.
ROUND ROCK SPORTS CENTER EXI 20225
SALESPERSON SNIPPING INFORMATION SHIP VIA SNIP DATE
0399 MA PREPAID OUR TRUCK 07/22/25
OUANTTTY - QUANTITY
ORDERED PRODUCT COOE DESCRIPTION SNIPPED PRICE DISC. EXTENSION C+O
T 20 RACO 660 1-7/8D HANDYBOX 1/2 KO 20 124.00 C 24.80 2.0
TITLE 70 IRIIQAmola ANA RILE OP L0I2 o•WOOE PASEKS AT POUT CODE TO ADVISE YOU PIIOOTLY COIR7110.INS YOUR ORDER, TUTS CODE IS VIED ON MERCHANDISE 24.80
or INIPIOIT CLALNS FOR■roar OR WOOED IEACKANIISE SHOULD ME OUR INVOICES SALES TAX -00
WADE TO CARRIER O-DACE ORDERED WILL SNI►AS SOON AS RECEIVED UNLESS IrtTEUCTED TO
KERCNMmISE SETOtN®=TROUT CDA COULEE WILL NOT OE ACCEPTED SKIPPING CSULIGE .00
A RENAMTVO OOROS NLLL Y MADE ON RETURNED 00000 UNLESS
OVEcrnm OR TIOODOR ERROR ON 001 PART. NET PAYMENT IS DUE BY THE 15TH OF
A SERVICE=LINE or I VA PER NOIRE. OUT NOT To EECESD TAX THE MONTH FOLLOWING PURCHASE TOTAL DUE 21 80
INOEEET AMOR LAKIVI.I.I ALLpn BY AEPLICARII STATE LAN. WILL
SE N►DA ON ALL IRST DtR ACCOUNTS.
IRIS SALE IS MULCT TO OOr TEATS LOCATED AT
WALKS.00R-Tm2E.CON, =ICE VZ TOT CAA RCN TM TO?LLR
WITHOUT PRIOR NOTICE.
...DUPLICATE... INVOICE NO. I INVOICE DATE
CID — AUSTIN 0234-1156200 07/28/25
1033 M EISTER LINE SUITE
8600 PLEASE SHOW INVOICE NO. AND REMIT TO:
PFLUGERVILIE, TX 78660
T:512 458-6313 F:512 441-0433 P.O. BOX 206987
DALLAS, TX 75320-6987
SOLD TO: GERALD NUNN ELECTRIC, LLC. SHIP TO: GERALD NUNN ELECTRIC, LLC.
JOB: ROUND ROCK SPORTS CENTER EXPAN 2400 CHISOIN TRAIL RD
410 N. PATTERSON AVE ROUND ROCK, TX 78681
FLORENCE, TX 76549
•••3RDPTY—US—MAIL/EMAILED•••
ACCOUNT NO. X4-21235 ,COB NAME AND ADDRESS CUSTOMER ORDER NO.
ROUND ROCK SPORTS CENTER EX1 20225
SALESPERSON SHIPPINO INFORMATION SHIP VIA SHIP DATE
0399 NA PREPAID OUR TRUCK 07/22/25
QUANTITY QUANTITY '
ORDERED PRODUCT CODE DESCRIPTION o SHIPPED PRICE DISC. EXTENSION CO
T 15 PS B0X30 1/2" STRAIN RELIEF GRIP .30"—.. B 0 19.52 E 0.00 2.0
T 800 WIRE 14/4 SJOOW S00 960.00 M 768.00 X
SO CORD 19M1 FLOOR — B/0 PS BOX30 IF NOT ON SHELF
T 1 MISC FRT 1 .00E E 0.00 X
TITLE TO IGRCR0ISE AND RISS Or LOSE CO DMmos PASIEI AT POINT CODE; TO ADVISE AU NAOTTLI CORL7DOIDNO TOUR ORDER. TNII CODE IS USED ON 1IERCHAP471SI: 768.00
M
or SSIPSEWT. CLAIMS Tom SHORT oR pum=ImCEAMDISE SR00Sd CIE OUA INDICES. SALES TAX .00
MADE TO CARRIER. R-&ACE COVERED. WILL SNIP AS SAW Al RECEIVED UNLESS INSTRUCTED TO
MEAXANDISZ REMO=WITwOT OUR CwIaIT WILL AT SE ACCEPTED. SF/PPING CHARGE .00
A ATOCRI10 CNAA s WIL NO L RE ON ON EUTAW=0000S DELLS' -
UDErECTTVE OR TIWO ERROR OW ME PART. NET PAYMENT IS DUE BY THE 15TH OP
mI
A 4AviaE calm or 14S PER METE. AT NOT To EXCEED TER THE MONTH FOLLOWING PURCHASE TOTAL DUE 768.OC
NTARST MAORT LAWTVLLT ALLO1®NT APPLICASIE STATE LAM. WILL
SE MADE ON ALL PAST DOE ACCOXITS.
TITS RASE IA SVRJECT TO OUR TLO=A LOCATED AT
SAIES.ONA-VIONI.CON, DEICE NE NAT CIMTDE ram TTIA TO Tile
WIPEOUT PRIOR NOTICE.
...DUPLICATE." INVOICE NO. I INVOICE DATE
CED - AUSTIN 0234-1156635 08/05/25
1033 MEISTER LANE SUITE
1600 PLEASE SHOW 21roorCE NO. AND REMIT TO:
PFWGERVILLE, TX 78660
T-512 458-6313 F:512 441-0433
P.O. BOX 206987
DALLAS, TX 75320-6987
SOLD TO: GERALD NUNN ELECTRIC, LLC. SHIP TO: GERALD NUNN ELECTRIC, LLC.
JOB: ROUND ROCK SPORTS CENTER EXPAN 2400 CHISOLM TRAIL RD
410 N. PATTERSON AVE ROUND ROCK, TX 78681
FLORENCE, TX 76549
•••3RDPTY-US-MAIL/1}AILED•••
ACCOUNT NO. X4-21235 JOB NAME AND ADDRESS CUSTOMER ORDER NO.
ROUND ROCK SPORTS CENTER MS 20225
SALESPERSON SHIPPING INFORMATION SNIP VIA SHIP DATE
0399 MA PREPAID OUR TRUCK 07/28/25
OUANTRY QUANTITY
ORDERED PRODUCT CODE DESCRIPTION SNIPPED PRICE • 04SC. EXTENSION CID
15 PS BOX30 1/2" STRAIN RELIEF GRIP .30" 15 19.52 E 292.80 2.0
TITLE TO HfRolIlorfi AND RISK Or LOSE OR OAIGOI SAMS AT POINT CODE TO ADVISE TOO MONTT=CONCERNING YOUR CODER, flog CODE II VIED OW UERCHANDIE 292.80
Or SKI NEWT CLAIM TOR MNONT OR DAMMED HO.CIIONDIR SHOULD BIZ DOA MVOSCIR SALES TAX .00
WADE TO C R -RACE OImEDLIED WILL SHIP AS NCO AS MOLTED UNLESS IIIJTNOLTED TO
NENCILANIIEZ RETWOID NITNwr DOR CONIOIT MILL NOT RI ACCEPTED SMPPING CHARGE .00
A RIITOCIIND OIANGI RILL AI MIDI OR MOW=000OI OML21S
OZTRCTIVZ OR TOO=ERROR DM OWR PANT NET PAYMENT IS DUE BY THE 15TH OF
ND
A gaNVICI CIAREI or 1 ti•Mk N RTE. MOT NOT To EWE=Tgs THE MONTB i1DLLOWING PURCHASE TOTAL DUE 292 80
NIOQ3T ANDOST LOSTVILT ALUMS 1M APPLICARLE STAIR LAN. WILL
RE MADE of ALL PAST OR ACCOOPTE
S>•TE SAL.IS SURTECT TO OCR TAP LOCATED AT
IALLS OUP-TOWS CON, MICE NI NAT CNAI= PROM T0I TO TDR
1RTNOOT PRIOR NOTICE
HereRentals" l NA RENTAL'S Page 1 of 1
Rental Invoice# 900573639
Branch: Remit to:
H&E EQUIPMENT SERVICES,INC.#4030 H&E EQUIPMENT SERVICES,INC Amount cusp) $1,689.25
104 Benelli Drive PO Box 849850 Customer ll 1008020
Hutto,TX 78634-2070 Dallas.TX 75284-9850 invoice Date 07/14/2025
Phone: (512)759-4120 Terms Net due In 30 days
Fax: (512)759-4124 Contract II 311348371
Incoterm H&E Delivery
PO 1 Round Rock Sports Center
Billed to: Ship to:
Project Name Round Rock Sports Center Expansion
GERALD NUNN ELECTRIC LLC Round Rock Sports Center Expansion Ordered By Kriety Leonard
410 N Patterson Ave 2400 Chtshofm Trail Rd Billing Start Date 07/02/2025
Florence,TX 76527-4028 Round Rock,TX 78881
Billing End Date 07/11/2025
Reference Inv# 900502830
'/v'7
Rental Items O
Qty Item Description Day Week 4 Week Amount !//
1 10434020 Scissorlift Electric 35.1-45'40-49' $295.00 $631 00 $1,310.00 $1,262.00
SY-SKY JACK SJ4740-A SN-A103005791
Meter Out/In:19.0/30.0
Rental $1,262.00
Miscellaneous Items
Qty Description Unit Price Amount
1 Delivery Charge $225.00 $225.00
1 Pick Up Charge $225.00 S225.00
1 Heavy Equipment Dealer Inventory Tax $1.86 $1.86
1 Environmental-Rental $31.55 $31.55
Miscellaneous S483.41
Subtotal S1,745.41
Tax Items
Description Amount
State Tax S108.97
County Tax $0.00
City/District Tax $34.87
Tax $143.84
INVOICE TOTAL $1,689 25
For questions on your account,please contact CredilDallas@he-equipment.com or 868-322-8577.
All Invoices are subject to our standard terms end conditions and may be found at he-equipment.com/resources.
HANK YOU FOR YOUR BUSINESS
TO VIEW AND PAY ONLINE connectheequipment-com
BRANCH LOCATION PLEASE REMIT TO: CONTRACT TYPE: RENTAL RETURN
AU2 P.O. BOX 208439 INVOICE# 13247100-005
(��� i 512-2 3 8-15 5 5 Dallas, TX 75320-8439 Po# 20035
.�Eqigco.G - JOB#
AFTER HR#:(512)917.6023 JOB NAME ROUND ROCK SPORTS CT
CUSTOMER# 77479 PHONE#254-793-3539 ORDERED BY: BRENT/DANNYD/15:00
GERALD NUNN ELECTRIC LLC DATE/TIME OUT: 3J28125 2:30 PM
410 N. PATTERSON AVE DATE/TIME IN: 8/05/25 1.26 PM
FLORENCE, TX 76527
CONTACT: BRENT 512-940-8108 TERRITORY:32 9 PROCESSED BY: DANNYD
DRIVER LICENSE: LICENSE PLATE: RETURN LOC: AUS
JOB ADDRESS: 2400 CHISHOLM TRAIL RD ROUND ROCK TX 7eF,R.1
DEL.INSTRUCTIONS:
RENTAL RATES ARE FOR EACH ITEM AND DO NOT INCLUDE FUEL OR DELIVERY PAGE: 1
ITEM EQUIPMENT DESCRIPTION RATES EXTENDED
QTY EQUIP.# DAY WEEK 4 WEEK PRICE
1 SCISSOR LIFT-45' 2WD ELECTRIC 355.00 940.00 2035.00 2035.00
262284 4555SE HR OUT: 123.10 HR IN: 163.50
S/N: 17801223
SALES ITEMS:
Qty Item number Unit Price
1 PPT EA 3.580 3.58
HB 2476 - PERSONAL PROPERTY TAX
1 ENV EA 15.000 - -. 15.00
ENVIRONMENTAL :HARGE \
f
•
DELIVERY BY: JON /„
ii/
PICKUP BY: FRANKIE I
`UU /
0
A(' \ .
f_
� f'. SUB TOTAL: 2053. 58
DAMAGE WAIVER: ** N/A **
TAX: 169. 43
FINAL BILL: 7/16/25 02.30 PM THRU 8/05/25 01 26 PM TOTAL AMOUNT DUE: 2223.01 e
RENT'CONTINUES UNTIL YOU CALL 512-238-1555 TO HAVE ECUIPMENT PICKED UP
CUSTOMER SIGNATURE PRINT CUSTOMER'S FULL NAME , DELIVERED BY DATE
.PAYMENT TERMS:NET 70 UPON ISSUANCE OF INVOICE FAME DATE).SERVICE CHARGES AT THE LESSER RATE OF I.WIPER MONTH OR THE MAXIMA RATE PERMITTED BY LAW ON PAST DUE ACC CONS.
•SUNSTATE EQUIPMENT WU.WOK A SURCHARGE OF 2.0%FOR CREPT CARD PAYMENTS,%WERE PERIBTTED BY LAW.THISFEE DOES NOT EXCEED THOSE INCURRED BY SUNSUIT EQUIPMENT.
•A SERVICEICLEANNG CHARGE MAY RESULT DUE TO EQUIPMENT BEING RETURNED DAMAGED OR IN NEED OF EXCESSIVE CLEANING.
11E eIVIRONIENTAL FEE IS NOT REGULATED NOR COLLECTED BY OR FOR ANY GOVERNMENTAL AGENCY.
•UNLAWF)L FAILURE TO RETURN RENTED PROPERTY MAY BE A FELONY.FATES CRIMINAL PROSECUTION,MOOR IMPRISONMENT COULD RESULT.
•CUSTOMER AGREES TO RECEIVE ELECTRONIC COMMUNICATIONS FROM SUNSTATE.INCLUDING PHONE CALLS,DIALS MD TEXT MESSAGES TO READ MORE ABOUT DE TERMS OF USE RE-GAM:01G
THESE CO MINCATICNS,PLEASE VISIT:WN/VV.SUNBTATEEQUP.COKIEGAUTERYSOF-USE.
•PRIOR TO ACCEPTING THE EOUPIENT,CUSTOMER W AENSED TO REVIEW THE TERMS AHD CONDITIONS CTERMS AND CONDITIONS')ON THE RENTAL CONTRACT LOCATED AT
WNW.SUNSTREEQUP.CQNEOAUTERMS.OF•RENTILL.BY ACCEPTING THE EQUIPMENT,TIE CUSTOMER AGREES TO BE BOUND BY THESE TERMS AM)CONDITIONS IN THEIR ENTIRETY.BY MMMHG ABOVE.
I)CUSTOGER ACKNO'HEDGES AND AGREES 111AT CUSTOMER HAS BEEN ADVISED TO REVIEW THE TERMS AND CONDITIONS 2)CUSTOMER AQINOWTEDOES AND AGREES THAT PRIOR TO ACCEPTING
EQUIPMENT,CUSTOMER HAS REVIEWED,UNDERSTANDS.AND ACCEPTS THE TERMS ANO GNOMONS.3)CUSTOMER IS OF LEGAL AGE AND HAS TIE AUTHOWTY AND POWER TO SIGN DES AGREEMENT
FORIAS THE CUSTOMER.A PHYSCAL COPY OF THE TERMS AND CONDITIONS IS AVAILABLE UPON REQUEST.
Revised 01125
CONTINGENCY USE AUTHORIZATION
CUA 048 Landscaping Changes c-N
^ 1
`v INC�otD gr
Project: Round Rock Sports Center ` -
KINGProject No.: 2409 ��� »
Date: 9/19/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Proposed landscaping changes
Assumptions/Clarifications:
ITEM DESCRIPTION LABOR MATERIAL B SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 Sycamore-Swap 3"of DG for 4-5"of 2"Brazos - - - - 1 Is 18,838.64 18,839
2 Sycamore-Alternate to add 5'Tree Rings to Divide Mulch - - - - 31 ea 116.40 3,608
3 - - - - - -
4 - - - - - - -
5 - - -
Total Materials&Subs 22,447
Total Labor 0
Subtotal 22,447
Total 22,447
i
Signature of approval:
Date
Architect
Date
Owner'swr Representative
%Ne4 l4eIteli Date September 19,2025
John King Construction
Prepared By.King Construction Page 1 of 1 Printed:9/19/2025
Sycamore Landscape Inc.
PO Box 80130
Austin, TX 78708-0130 , , Ci
+15129993147 `r
accountingQsycamoreiandscapeinc corn
www sycamorelandscapeinc corn mato
landscape inc.
Estimate
ADDRESS SHIP TO ESTIMATE 1098
John King Construction Round Rock Sports Center DATE 09/16/2025
7511 O'Connor Dr, 2400 Chisotm Trail
Round Rock,TX 78681 Round Rock, TX 78681
SERVICE DATE DESCRIPTION QTY RATE
3)Landscape Install Expansion Building:Replace the 0 00 0 00
original granite gravel for 2"Brazos
Rock in Islands an around the new
building
3)Landscape Install Original bid for 1/4-1/2"granite gravel 97 -86.38 -8,378.86
3)Landscape Install Replace 1/4-1/2"granite gravel with 2" 150 181.45 27,217.50
Brazos Rock at 4"-5"depth
SUBTOTAL 18,838.64
TAX 0.00
TOTAL $18,838.64
Accepted By
Accepted Date
Commercial & Industrial Landscape Management
P.O. Box 80130 i Austin, TX 78708-0130 i (512)339-4665 I accounting@sycamorelandscapeinc.com
Page 1 of 1
Sycamore Landscape Inc.
PO Box 80130
Austin TX 78708.0130
+15129993147
accounting@sycainorelandscapelnc coin
www sycarnorelandscapeinc corn
landscape inc.
SHIP TO ESTIMATE 1100
John King Construction Round Rock Sports Center DATE 09/18/2025
7511 O'Connor Dr, 2400 Chisolm Trail
Round Rock,TX 78681 Round Rock, TX 78681
DESCRIPTION QTY RATE AMOUNT
3)Landscape Install Installing 5'manufactured tree rings 31 116.40 3,608.40
around trees in islands:
SUBTOTAL 3,608.40
TAX 0.00
TOTAL $3,608.40
Accepted By
Accepted Date
Commercial & Industrial Landscape Management
P.O. Box 80130 l Austin, TX 78708-0130 I (512)3394665 I accounting@sycamorelandscapeinc.com
Page 1 of 1
CONTINGENCY USE AUTHORIZATION
CUA 045 Add Netting Above Concessions
\-\...) „„..DING A), .
Project: Round Rock Sports Center ` KIN G
Project No.: 2409
Date: 9/19/2025 CONSTRUCTION_
Prepared By: Johnny Abney
Description:
Add netting above concessions sign per PR12
Assumptions I Clarifications:
ITEM DESCRIPTION LABOR MATERIAL 6 SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 JKC-Purchase and install netting,cable,caribiners,hooks 1 Is 1,200.00 1,200 1 Is 350.00 350
2 Lift already on site,3 guys 1 day,anchors,tools,etc - - - - - - - -
3 - - - - - - - -
4 - - - - - - - -
5 - - - - - - - -
Total Materials&Subs 350
Total Labor 1,200
Subtotal 1,550
Total 1,550
Signature of approval:
Date
Architect
Date
Owner'sw Representative
%H�"''7 ;grey Date September 19,2025
John King Construction
Prepared By:King Construction Page 1 of 1 Printed:9/19/2025
CONTINGENCY USE AUTHORIZATION
CUA 049 Fire Heat Trace-missing electrical cost
op DING yy
Project: Round Rock Sports Center \i,, KINGProject No.: 2409
Date: 9/19/2025 CONSTRUCTION
Prepared By: Johnny Abney .
Description:
Add heat trace per fire inspector
Assumptions/Clarifications:
ITEM DESCRIPTION LABOR MATERIAL b SUBS
QTY. TYPE' U.P. TOTAL QTY. TYPE U.P. TOTAL
1 Fire King-Heat Trace,Insulation,Install - - - - 1 Is 9,345.00 9,345
2 Nunn-Add Power - - - - - - -
3 - - - - - - -
4 - - - - - - -
5 - - - - - - - -
Total Materials&Subs 9,345
Total Labor 0
Subtotal 9,345
Total 9,345
Signature of approval:
Date
Architect
Date
Owner's Representative
%Ho'"oote, % --/ Date September 19,2025
John King Construction
Prepared By King Construction Page 1 of 1 Printed:9/19/2025
Phone:512-425-0272 ACR-1899690
8906 Wall Street SCR-1899691
Austin, 7X 78754 ECR-1899694
Suite 603
FIRE144. KING
"OUR BUSINESS IS PROTECTING YOURS"
DATE: August 21,2025 PHONE: QUOTE ID# 25-FKA-143
FAX:
CONTRACTOR: JKC
ATTENTION: Estimator
PROJECT: Round Rock Sports Sprinkler Heat Trace
PROPOSAL
SCOPE: Provide heat trace freeze protection equipment for sprinkler mains passing between buildings.
1.Install main controller-Chromelox ITC-F Single zone
2.Install heat trace cable on pipe at specified locations-between buildings where mains pass through breezeway
3.Provide and install temperature sensor.
4.Heat trace warning labels provided at protected locations.
5.Additional plan submittal to AHJ not Included at this time.
Electrical contractor must provide 120130/1 circuit to controller and then switch leg out to each freeze protection location.
ESTIMATOR: Russell McMillen
BID ITEM: Fire Alarm
SPEC SECTION: 28
Base Bid
$4,702.00 Material:heat traced controller,cable,sensor,straps,&signage
$2,400.00 Fire King Labor to install,connections to fire control panel,and testing
$2,243.00 2"Insulation on pipe at freeze protected locations
Total $9,345.00
Sprinkler Bid:
INCLUSIONS: Wire and connections to building FA sr!
All work to be per NFPA
All material to be per NFPA
Work during normal hours
Tax on material
1 yoar warranty
EXCLUSIONS: 120/277VAC connection to controller Bond
High voltage conduit and wire to freeze protection!ocalons Overtime
Running of conduit Night Work
AHJ re-inspection lees and erpedded plan review Excessive Insurance(2 Mil Umbrella;1 Yr Op&Al OCP)
Changes by AHJ to plan design at inspection
FIRE KING,LLC Alarm&Sales Accepted by Date
Russell McMillen
512.629-7255
Print Name
NOTE THIS PROPOSAL MAY BE WITHDRAWN BY US IF NOT ACCEPTED WITHIN 30 DAYS
With approved credit: Monthly Draw wi Payment terms to be net 10
CAD DRAWING FILES MUST BE FURNISHED TO FIRE KING,LLC.
INSULATION PROPOSAL
111r
MARBLE BROTHERS
INSULATION tic
Proposal Date:09/04/2025
SUBMITTED TO: PROPOSAL NUMBER:
Fire King, LLC 9489
ADDRESS PPROJECT NAME/LOCATION
8906 Wall St#603, Round Rock Sport Center
Austin Tx 78754 2400 Chisholm Trail Rd,
Round Rock,TX 78681
Marble Brothers Ins. is pleased to furnish materials and labor necessary for the completion for the application of the following:
Scope of Work:Included Thermal Insulation on Sprinkler piping:
• Insulate fire Sprinkler piping with 2"ASJ/SS Fiberglass insulation
Total Base Bid Amount:
($1,950.001
Exclusions:
Pricing excludes the following existing pipe,overtime and after hours, demo,painting, underground pipe,firestopping,All
electrical, waste and vent systems,sewer piping,irrigation piping,heat trace,Heat Trace, LAV/AOA covers,identification,
dumpsters,lifts, scaffolding and composite clean-up.
"'All material is guaranteed.All work to be completed in a substantial workmanlike manner according to specifications submitted,
per standard practices.Any alteration or deviation from the above specifications involving extra cost will be executed only upon
written orders and will become a change order above the estimate. This proposal is based on a mutually acceptable subcontract
agreement and may be withdrawn if not accepted within 30 days.
Acceptance of proposal the above prices,specifications and conditions are satisfactory and are hereby accepted.
Accepted by:epow
110 Thank you for your business!
MARBLE BROTHERS Gerardo Hernandez
INSULATION LLC
Fire King LLC I
, CHROMALOX
' = � dmrral
RR Sprts Center �)istrtbutton
Attn:Russell McMillen Advanced Thermal Technologies .....•.........
FS HT Quote
08/18/25
Chromalox Heat Trace Cable &
Accessories
I
Part# PCN Description Qty Net Price Total Cost
CPRS-1CR 512129 5 W/FT,050F-120V 130 $8.71 $1,132.30
ITC-FS1-001 390248 SINGLE CIRCUIT FRP ENCLOSURE MODBUS 1 $2,253.60 $2,253.60
RS485
AS-BM 512823 AMBIENT SENSING RTD BOX MOUNTABLE 1 $201,24 $201.24
•
LN 10 512807 LINE SENSING RTD 10'LONG 1 $249,12 $249 12
RTPC 513105 DL SERIES POWER CONNECTION KIT 1 $180.40 $180.40
RTES 513180 DL SERIES END SEAL KIT 1 $31.32 $31.32
BAND-SSO8 N/A BAND,STAINLESS,08"(Price/Band) 1 $4.33 $4.33
-
Admiral Heat Trace N/A Admiral Heat Trace Warning Label 10 $1.25 $12.50
Warning Label (price/each)
GL99 FG TAPE N/A HI-TEMP FIBERGLASS TAPE 1/2'WIDE X 36 YDS 2 $11 50 $23.00
(108')GL99
Subtotal $4,087.81
Plus:
Design
Startup and Commissioning
Shipping
Total(Excluding Taxes) $4,087.81
Plus Taxes NON-TAXABLE $0.00
Grand Total $4,087.81
Admiral Distnbution LLC 1499 E 40th Street, Houston TX 77022 I(713)202-2714
Page 1 of 1
CONTINGENCY USE AUTHORIZATION
CUA 046 Credit for Concessions Sign
N 6V1lDING Qy
Project: Round Rock Sports Center
Project No.: 2409 KING 74
Date: 9/19/2025 CONSTRUCTION
Prepared By: Johnny Abney
Description:
Credit concessions sign on west face
Assumptions/Clarifications:
ITEM DESCRIPTIONLABOR MATERIAL&SUBS
QTY. TYPE U.P. TOTAL QTY. TYPE U.P. TOTAL
1 Lewis Signs - - - - 1 Is (3,884.40) (3,884)
2 - - - - -
3 - - - - - -
4 - - - - - - -
5 - - - - - - -
Total Materials&Subs 0,884)
Total Labor 0
Subtotal 4 F'84)
Total (3.884)
Signature of approval.
Date
Architect
Date
Owner's1 Representative
%uuCd % Date September 19,2025
John King Construction
Prepared By:King Construct on Page 1 of 1 Printed:9/19/2025