4B-R-04-31 - 8/12/2004 RESOLUTION NO. 04-31
WHEREAS, the Round Rock Transportation System Development
Corporation ( "RRTSDC" ) has previously adopted a Transportation Capital
Improvement Plan ( "Plan" ) , and
WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK
TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION,
That the amendment to the Transportation Capital Improvement Plan
for the Round Rock Transportation System Development Corporation,
attached hereto as Exhibit "A" , is hereby approved.
The Board of Directors hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Resolution was adopted was posted and that such meeting was open
to the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered and
formally acted upon, all as required by the Open Meetings Act, Chapter
551, Texas Government Code, as amended.
RESOLVED this 12th day of August, 2004 .
ROUND ROCK TRANSPORTATION ://;)
DEVELOPMENT CO ORA I
By:
NYL LL, Presid
ATTEST:
L Al AIWA Secretary
WPFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/RRTSDC/0031.WPD/sc
2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
t s 0' ,,`+# 12,2,%y� Work Description Construction Oats -Estimated Trans Other Funding - Total Cost Prior Trans. AddittonatTrans, -.
' c t" € °` •• Corp.Funding Corp Funding Corp Funding(this
r z, PojaeCt4am. � s za ProJalk Limits ! t i S (Amend fM) Amend).
^,R pI AA 1 b"5 ".IS
—Preliminary engineering to establish alignment and N/A $1,150,000 $1,150,000 5500,000
Arterial A From US 79 to Forest Creek Drive ROW requirements. Protective ROW purchase
Forest Creek
From Double Creek Drive to 800'West of Forest Fall 2004 $3,008,179 57,294,528 b $4,378,319 §54,438
Ridge Subdivision $77,614 e
Fall 2004 $2,850,000 $2,850,000
Double Creek Drive From Gattis School Rd to MKT ROW
A.W.Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd Fall 2000 §20,801,354 $1,765,94$785,94 5 a $23,550,000
e
Acquire ROW for Arterial C and construct Summer 2007 $800,000 $800,000
Arterial C From RM 620 to Sam Bass Rd bicycle/sidewalk facility to access high school and
swimming pool
Design,purchase right-of-way and construct 4- Fall 2006 57,387,350 $222,650 b $8,590,000
Kiphen Road(CR 113) From FM 1480 to CR 122 lane divided arterial $1,000,000 d
Acquire ROW for highway relocation Fall 2003 $600,000 $8,200,000 a 58,800,000
FM 1480 From US 79 to 1200'N of US 79
Construct 4 lane divided arterial Complete 53,825,000 $86,556 b $4,458,695
Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road $547,139 e
Construct Greenlawn Interchange with IH 35 Not Scheduled $5,000,000 512,000,000 a 517,000,000
Greenlawn Interchange At IH 35
Construct frontage road turnarounds Completed $3,533,582 $3,175,000 a $7,036,562
IH 35 Tumamunds FM 1325/Louis Henna/Hester's Crossing $328,000 c
Relocate ramps,widen frontage road,and Summer 2004 $6,000,000 $6,000,000
IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround
IH 35 Frontage Rd C-D and Hester's Crossing Construct Frontage road collector-distributor and Winter 2005 $7,650,000 $7,650,000
Bridge Replacement IH 35 Hester's Crossing replace Hester's Crossing Bridge
Alternatives to alleviate congestion N/A $87,400 $87,400 $87,400
Feasibilltly Study IH-35&RM 820 and IH 35&US 79
Assist Coy in Interagency coordination for SH 45 N/A $52,326 $52,326 -$47,674
Prime Strategies
Construct 2-lane divided roadway Fall 2004 $596,706 $596,706 $596,708
Red Bud Lane(CR 122,Phases 1&2) From Gattis School Road to CR 123
PS&E Design services;Construct 5-lane section, $277,363 $0 $277,363 $249,363 $28.000
Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crossing $3,375,909 $140,264 $3,518,173 S3,375,909
Construct railroad grade separation Fall 2005 $2,500,000 $8,500,000 a 511,000,000
RM 620 at Union Pacific Railroad
Round Rock East City Limits to Round Rock West Acquire ROW for SH 45 FY 2000 $215,200,000 a $272,576,911
SH 45 $31,376,911 $26,000,000 d
City Limits (est)
South Mays Street,Dell Way&Goths School Road Realign streets,widen streets,extend streets August 2000&FY $4,980,000 $4,980,000
South Mays Street Improvements Extension 2001
Design and construct traffic signals 2000 $1,400,000 $1,400,000 $600,000
Traffic Signals Various locations
Construct and implement coordinated traffic signal Summer 2003 $100,000 $100,000
Traffic Signal Coordination FM 1325/Louis Henna McNeiVIH 35/RM 620 US 79systems
Reconstruct highway to 4 lane divided highway Completed $2,550,000 $3,500,000 a $6,350,000
US 79 From CR 195 to CR 110 $300,000(est)
d
Construct 4-lane divided highway Spring 2005 $8,012,745 $3,000,000 a $11,012,745 52,772,744
US 79 From FM 1480 to CR 195
'Miscellaneous consulting work in supoort of N/A $341,961 $341,961 $141,961
Transportation Consulting transportation program
g 3
'le.. •,. ,,''',I;`,-,;;,*, ',' EA0, ._y«. ; >,sa94oS•S lot. $3,625,272 $4,733,575
LEGEND EXHIBIT Page 1 of 1
a=State/Federal Fund Amendment#10
b=Private Updated 8/12/04
c-1997 CO Transportation
d a Williamson County
e-City Utility Fund t t At 1