Loading...
4B-R-04-31 - 8/12/2004 RESOLUTION NO. 04-31 WHEREAS, the Round Rock Transportation System Development Corporation ( "RRTSDC" ) has previously adopted a Transportation Capital Improvement Plan ( "Plan" ) , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of August, 2004 . ROUND ROCK TRANSPORTATION ://;) DEVELOPMENT CO ORA I By: NYL LL, Presid ATTEST: L Al AIWA Secretary WPFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/RRTSDC/0031.WPD/sc 2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION t s 0' ,,`+# 12,2,%y� Work Description Construction Oats -Estimated Trans Other Funding - Total Cost Prior Trans. AddittonatTrans, -. ' c t" € °` •• Corp.Funding Corp Funding Corp Funding(this r z, PojaeCt4am. � s za ProJalk Limits ! t i S (Amend fM) Amend). ^,R pI AA 1 b"5 ".IS —Preliminary engineering to establish alignment and N/A $1,150,000 $1,150,000 5500,000 Arterial A From US 79 to Forest Creek Drive ROW requirements. Protective ROW purchase Forest Creek From Double Creek Drive to 800'West of Forest Fall 2004 $3,008,179 57,294,528 b $4,378,319 §54,438 Ridge Subdivision $77,614 e Fall 2004 $2,850,000 $2,850,000 Double Creek Drive From Gattis School Rd to MKT ROW A.W.Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd Fall 2000 §20,801,354 $1,765,94$785,94 5 a $23,550,000 e Acquire ROW for Arterial C and construct Summer 2007 $800,000 $800,000 Arterial C From RM 620 to Sam Bass Rd bicycle/sidewalk facility to access high school and swimming pool Design,purchase right-of-way and construct 4- Fall 2006 57,387,350 $222,650 b $8,590,000 Kiphen Road(CR 113) From FM 1480 to CR 122 lane divided arterial $1,000,000 d Acquire ROW for highway relocation Fall 2003 $600,000 $8,200,000 a 58,800,000 FM 1480 From US 79 to 1200'N of US 79 Construct 4 lane divided arterial Complete 53,825,000 $86,556 b $4,458,695 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road $547,139 e Construct Greenlawn Interchange with IH 35 Not Scheduled $5,000,000 512,000,000 a 517,000,000 Greenlawn Interchange At IH 35 Construct frontage road turnarounds Completed $3,533,582 $3,175,000 a $7,036,562 IH 35 Tumamunds FM 1325/Louis Henna/Hester's Crossing $328,000 c Relocate ramps,widen frontage road,and Summer 2004 $6,000,000 $6,000,000 IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround IH 35 Frontage Rd C-D and Hester's Crossing Construct Frontage road collector-distributor and Winter 2005 $7,650,000 $7,650,000 Bridge Replacement IH 35 Hester's Crossing replace Hester's Crossing Bridge Alternatives to alleviate congestion N/A $87,400 $87,400 $87,400 Feasibilltly Study IH-35&RM 820 and IH 35&US 79 Assist Coy in Interagency coordination for SH 45 N/A $52,326 $52,326 -$47,674 Prime Strategies Construct 2-lane divided roadway Fall 2004 $596,706 $596,706 $596,708 Red Bud Lane(CR 122,Phases 1&2) From Gattis School Road to CR 123 PS&E Design services;Construct 5-lane section, $277,363 $0 $277,363 $249,363 $28.000 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crossing $3,375,909 $140,264 $3,518,173 S3,375,909 Construct railroad grade separation Fall 2005 $2,500,000 $8,500,000 a 511,000,000 RM 620 at Union Pacific Railroad Round Rock East City Limits to Round Rock West Acquire ROW for SH 45 FY 2000 $215,200,000 a $272,576,911 SH 45 $31,376,911 $26,000,000 d City Limits (est) South Mays Street,Dell Way&Goths School Road Realign streets,widen streets,extend streets August 2000&FY $4,980,000 $4,980,000 South Mays Street Improvements Extension 2001 Design and construct traffic signals 2000 $1,400,000 $1,400,000 $600,000 Traffic Signals Various locations Construct and implement coordinated traffic signal Summer 2003 $100,000 $100,000 Traffic Signal Coordination FM 1325/Louis Henna McNeiVIH 35/RM 620 US 79systems Reconstruct highway to 4 lane divided highway Completed $2,550,000 $3,500,000 a $6,350,000 US 79 From CR 195 to CR 110 $300,000(est) d Construct 4-lane divided highway Spring 2005 $8,012,745 $3,000,000 a $11,012,745 52,772,744 US 79 From FM 1480 to CR 195 'Miscellaneous consulting work in supoort of N/A $341,961 $341,961 $141,961 Transportation Consulting transportation program g 3 'le.. •,. ,,''',I;`,-,;;,*, ',' EA0, ._y«. ; >,sa94oS•S lot. $3,625,272 $4,733,575 LEGEND EXHIBIT Page 1 of 1 a=State/Federal Fund Amendment#10 b=Private Updated 8/12/04 c-1997 CO Transportation d a Williamson County e-City Utility Fund t t At 1