4B-R-05-35 - 5/24/2005 RESOLUTION NO. 05-35
WHEREAS, the Round Rock Transportation System Development
Corporation ( "RRTSDC") has previously adopted a Transportation Capital
Improvement Plan ( "Plan") , and
WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK
TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION,
That the amendment to the Transportation Capital Improvement Plan
for the Round Rock Transportation System Development Corporation,
attached hereto as Exhibit "A" , is hereby approved.
The Board of Directors hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Resolution was adopted was posted and that such meeting was open
to the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered and
formally acted upon, all as required by the Open Meetings Act, Chapter
551, Texas Government Code, as amended.
RESOLVED this G h day of May, 2005 .
ROUND ROCK TRANSPORTATI M
DEVELOP T 0
By:
WELL, President
ATTEST:
, Secretary
WPFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTT/RRTSDC/0035.WPD/SC
I
• '
~ 4
• •
,,1
2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
'.'', �e;4 *'-+a. ,*+f.Sr t :s� :" .,,:-�. P. -:itf,13HwniOtitvru.fil1im! djt, ti ? •NirF,ndln�l�h 70 ,4wt ,Tr, - Md$ton Trails 5,:
^'�� ,,'0: Via"+ -s -i�!-1,4, ' r . .,pis :i"'° ~', «r, ,,, y' `r `p , t.w. % dt ;PA N. r
�.uzs
Arterial A Front US 79 to Forest Crook Drive7p7rizt -
Forest CreekFrom Double Creek Give to 000'West of Forest
Ridge Subdivision
Doubt*Creek Driv. Front Gallis School Rd to MKT ROW
A.W.Grimes Blvd(Arterial B) From US 70 to Louis Henna Blvd
Arterial C From RM 620 to Sam Baas Rd biCyOleraideWalk facility to access high school and
Klpnen Road(CR 113) Front FM 1400 to CR 122
Acquire ROW for highway relocation Fall 2003 $800,000 68,200,000 a $6.600,..•
FM 1460 From US 79 to 1200'N of US 79
Oreenlawn Extension From Louis Henna Blvd to IH 36 Frontage Road
Oreerawn Interchange AI IN 35
�R .I IN 35 Turnarounds FM 1325/Louis Henna/Hester's Crossing
L'/
ill 35 Arm Improvements from Weotingtoua.Road to FM 1431 conattuc1 frontage road turnaround
k•s•I IN 35 Fromege Rd GO aro Heater's Crossing IN 35 FNsier'a Crossing
replace Hester's Crosaing Bridge
•O Bridge Replacement
►e
1-3
FoasibIlity Study IH-35&RM 020 and IN 35 a US 79
Oakmont Orly.(An.nal'S') From Teravlsta to Chandler Road
v Prima Strategies
Red Bud Lane(CR 122,Phases 1 0 2) From Oaths School Road to CR 123
PS&E Design services,Construe(5-lane section, 6277,383 60 $277,38
Red Bud Lana(CR 122,Phase 3) Front CR 123 to US 70
Conelruct railroad grade**potation Fall 2005 $2,500,000 sa.soo.000 . $11,000,...
RM 020 at Union Pacific Rairoad
SH 45 Round Rock East City Limits to Round Rock Weal
City Limas
Realigneft
- - '•' - '
Souln Mays Stress ImprovementsSouth Mays Street,Dell Way 0 Goths School
Road Extension2001
Design and construct traffic egnaN 2000 $1,400,00)
Traffic Signals Venous locations
Construct and 1mi:tortoni coordinated traffic Surnrmr 2003 $100,000 6100.1
Traffic Signal Coordination 1325/Louts henna MCNaiVIH 15/RM 020 US
79agnai systems
US 79 From CR105 to CR110
6300,000(eat)
US 79 From FM 1460 to CR 195
Teraviela Front IMJ5 to Oakmont Drive
Tranaportatlon Consulting transportation program
LEQEND
a•State/Federal Fund Page 1 of 1
b•Private Amendment Rig
c•1997 CO Transportation Updated 5/24/05
d•Williamson County
e-City Utility fund
DATE: May 20, 2005
SUBJECT: Transportation System Development Corporation - May 24, 2005
ITEM: 6.A. Consider a resolution approving amendments to the Transportation
Capital Improvement Plan (TCIP) to supplement funding to existing
projects and to add new projects for roadway improvements, which
would extend Oakmont Drive north of Chandler Road and extend
Teravista Parkway east of IH 35 to the extension of Oakmont Drive as
noted.
The TCIP is being amended as follows:
1. To provide funding for construction of Oakmont Drive (Arterial "S") in the amount of
$2,200,000. The project limits are from Teravista to Chandler Road.
2. To provide funding for construction of Teravista in the amount of $1,250,000. The
project limits are from IH-35 to Oakmont Drive.
3. To supplement funding to existing projects. (To increase the budget for the IH 35 Area
Improvements Project from $6,418,431 to $8,269,090. The additional $1,850,659 is
for an increase in the construction estimate.)