Loading...
4B-R-06-02 - 3/26/2006 RESOLUTION NO. 06-02 WHEREAS, the Round Rock Transportation System Development Corporation ( "RRTSDC" ) has previously adopted a Transportation Capital Improvement Plan ( "Plan" ) , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of March, 2006 . ROUND ROCK T SPORTAT EM DEVELOP OR By: WELL President ATTE T: • c.y / ;z,I , Secretary @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/RRTSDC/0602.WPD/sc 2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Estimated Prior Corporation Additional Project Name Project Limits Work Doscription Construction Dato Corporation Other Funding Total Cost Funding Corporation Funding Amendment#13 Funding This Amendment Preliminary engineering to establish alignmentV N/A $1,650,000 $1,650,000 t , Arterial A From US 79 to Forest Creek Dove and ROW requkements.Protective ROW purchase _ Forest Creek From Double Creek Drive to 800'West of Forest Competed $3,006,179 $1,294,526$77,614 a b $4,378,319 Ridge Subdi✓aion Completed $2,850,000 $2,850,000 Double Creek Drive From Oaths School Rd to MKT ROW Fall 2000 524,058,294 51,982.701 b $27,048,355 $793,940 $2.200,000 AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd 51,007,360 e Acquire ROW for Arterial C and construct Summer 2007 $0 $0 Arlene!C From RM 620 to Sam Bass Rd bicycle/sidewalk facility to access high school and svn mina pool Design,purchase right-of-way and construct 4- Winter 2008 $11,188,906 $269,823 b 512,510,311 Klphen Road(CR 113) From FM 1480 to CR 122 lane dvided ertenis $1,000,000 d $51,582 e Acqure ROW for highway relocalan Completed 5800,000 $8,200,000 a 58,800,000 FM 1460 From US 79 to 1200'N of US 79 Construct 4 lane divided arterial Completed $3,698,189 $86,533 b $4,331,861 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road 5547,139 e Construct Greenlawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a $12,000,000 Greenlawn Interchange Al IH 35 - Ill 35 Turnarounds FM 1325/Louis Henna/Hester's CrossingConstruct frontage road turnarounds Completed 53,533,582 $3,175,000 a $7,038,562 $328,000 c Relocate ramps,widen frontage road,and Fat 2005 $10,269,090 $4,042,766 a 514,311,858 52,000,000 IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround IH 35 Frontage Rd C-D and Nester's Crossing ce Construct Frontage road collector-distributor end Fall 2007 $9,780,000 59,780,000 Bridge Replacement IH 35 @ Hester's Crossing repla Hester s Crossing Bridge AJlernatrves to alleviate congestion WA 587,400 $87,400 Feasibility Study IH-35&RM 620 and IH 35 8 US 79 Construct 4-lane divided roadway Fall 2005 52,200,000 $2,200,000 Oakmont Onve(Arterial'S') From Teravista to Chandler Road Assist City in interagency coordination for SH 45 WA 552,326 552,326 Prime Strategies Construct 2-lane divided roadway Fall 2004 $596,706 $596,706 Red Bud Lane(CR 122,Phases 1 8 2) From Goths School Road to CR 123 PS8 E Design services:Construct Slane Spring 2006 5277,383 $0 $277,363 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 section,Bridge,Railroad crossing $3,375,909 $140,264 $3,516,173 Construct railroad grade separation FY 2008 $2,500,000 58,500,000 a $11,000,000 RM 620 at Union Pacific Railroad 215.200,000 SH 45 Round Rock East City Limas to Round Rock West Acquire ROW for SH 45 FV 2000 $31,378.911 $$26,000,000 d $272.576,911 City Limits (est) South Mays Street,Dell Way,Gatlin School Road Realign streets,widen streets,extend streets August 2000&FY 54,880,000 $21,465 a $4,901,465 South Mays Street Improvements 2001 Extension&Dellway/Boardwalk Confection Design and construct traffic sgnals On-goIng $2,230,000 $2,230,000 $830,000 Traffic Signals Various locations FM 1325/Loub Henna McNei/IH 35/RM 620 US Construct and implement coordinated traffic Completed 5100,000 5100,000 Traffic Signal Coordination 79 signal systems Reconstruct highway to 4 lane divided highway Completed $2,375,892 53,500,000 a $6,175,892 US 79 From CR 19510 CR 110 $300,000(est) d Construct 4-lane divided highway Winter 2005 $9,012,745 $3,000,000 a 512,012,745 US 79 From FM 1480to CR 195 Construct 4-lane divided roadway Fall 2005 $1,250.000 $1,250,000 Teravista From IH-35 to Oakmont Orne Miscellaneous consulting work to support of WA $341,961 5341,981 Transportation Consulting transportation program ... <.T1 > 7,-. .. #`rn ,°)$5) %:.aj` >*4 Ye a3I)71,'Eia" "".,'T7 ... $793.940 $5,530,000 EXHIBITLEGEND Page 1 of 1 a=State/Federal Fund Amendment#14 b=Provo(' Updated 3 23/06 L c-1997 CO Transportation d d=Wtltamson County 2 ff^11 e-City Utility Fund DATE: March 17, 2006 SUBJECT: Transportation System Development Corporation - March 23, 2006 ITEM: 7.A. Consider a resolution approving amendments to the Transportation Capital Improvement Program (TCIP) to adjust funding for existing projects. This resolution will approve the following amendments to the TCIP. The TCIP is being amended for the following: 1. To provide additional funding for Arterial "A" in the amount of $500,000. The funds are required for engineering service to design the US 79 and Union Pacific Railroad underpasses and miscellaneous roadway design. The project limits are Joe DiMaggio Boulevard to the Union Pacific Railroad. 2. To provide additional funding for A.W. Grimes Boulevard Phase 2 in the amount of $2,200,000. The funds are required for engineering services, surveying, construction inspection, relocation of water, wastewater, drainage and dry utilities, demolition of existing structure, street lighting, drainage and construction contingency. The project limits are Lake Creek to US 79 at FM 1460. 3. To provide additional funding for IH 35 Area Modifications in the amount of $2,000,000. The funds are required for additional engineering, Construction phase services, relocation of water and dry utilities, financial services, legal fees, construction of turn lanes for IKEA and entrance for McNeil Park and construction contingency. The project limits are Westinghouse Road to University Boulevard. 4. To provide additional funding for Traffic Signals in the amount of $830,000. The funds are required for design and construction of traffic signals at FM 3406 and Wyoming Springs Drive, FM 3406 and Creek Bend Boulevard, FM 3406 and Chisholm Trail Road, Gattis School Road and Surrey Drive, Gattis School Road and South Creek Drive, Gattis School Road and Via Sonoma Trail and University Boulevard and Sunrise Road.