4B-R-06-05 - 9/28/2006 RESOLUTION NO. 06-05
WHEREAS, the Round Rock Transportation System Development
Corporation ( "RRTSDC" ) has previously adopted a Transportation Capital
Improvement Plan ( "Plan" ) , and
WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK
TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION,
That the amendment to the Transportation Capital Improvement Plan
for the Round Rock Transportation System Development Corporation,
attached hereto as Exhibit "A" , is hereby approved.
The Board of Directors hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Resolution was adopted was posted and that such meeting was open
to the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered and
formally acted upon, all as required by the Open Meetings Act, Chapter
551, Texas Government Code, as amended.
RESOLVED this 28th day of September, 2006 .
ROUND ROCK TRANSPORTATION S TEM
DEVELOPMENT CORPORATIv ..
Y'
B :
NYL 9'WEL ., President
ATTEST:
)Secretary
WPFDesktop\::0DMA/WORLDOX/0:/WDOX/RESOLUTI/RRTSDC/0605.WPD/rmc
DATE: September 22, 2006
SUBJECT: Transportation System Development Corporation - September 28, 2006
ITEM: 7.A. Consider a resolution approving an amendment to the Transportation
Capital Improvement Program (TCIP) to provide funding for a new
project and adjust funding for existing projects.
This resolution will approve the following amendments to the TCIP.
1. Funding for Arterial "T" in the amount of $2,000,000. The funds are required to
construct half of a divided 4-lane lane roadway. The proposed roadway is located
between the Texas State University Campus and Seton Hospital from University Blvd
to 3,200 feet south of University Blvd.
2. Additional funding for Red Bud Lane Phase 1 and Phase 2 in the amount of $48,000.
The funds are required for additional temporary sedimentation control, safety end
treatments for culverts, object markers, reflectors, and a driveway widening. The
project limits are CR 123 to Gattis School Road.
3. Additional funding for Red Bud Lane Phase 3 in the amount of $340,000. The funds
are required for engineering services including scheduling, construction
administration and management and a storm sewer revision, asbestos abatement on
the existing bridge and temporary railroad signals. The project limits are US 79 to
CR 123.
Funding for these amendments is $2,388,000.00.
TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
Project Name Project Limits Work Description Estimated
Prior Corporation Additional
P Construction Date Other Funding Total Cost Funding Amendment Corporation Funding
Corporation Funding g 9
815 This Amendment
Preliminaryen ----- -.—
Arterial A Front US 79 to Forest Creek Drive and ROW requirements,Protective ROW $1'650'� '
gineenng to establish alignment WA -.
purchase
Forest Creek Front Double Creek Drive to 800'West of Forest Completed 52,805,345 51,326,513 b $4,190,919 -$200,834
Ridge Subdivision $59,061 e --
Double Creek Drive From Gatos School Rd to MKT ROW Completed $2.731,852 $2,850,000 -$118,148
AW Grimes Blvd(Arterial B) Front US 79 to Louis Henna Blvd Fall 2000 524,642,405 $7,982,701 b 527,%5,723 $386.111
5314,528 c
$1,226,089 e
Arterial C Front RM 820 to Sam Bess Rd Acquire ROW for Arterial C and construct Summer 2007 SO
bicycle/sidewalk facility to access high school
and swimming pool
Design,purchase right-of-way and construct 4- Winter 2006 $11,698,906 $1,135,895 b $14.047,153
Kiphen Road(CR 113) Front FM 1460 to CR 122 lane divided arterial 5510.000
51.000.000 0
$212,352 e
Acquire ROW for highway relocation Completed $600,000 $8,200,000 a S8.B00,000
FM 1460 From US 79 to 1200'N of US 79
Construct 4 lane divided arterial Completed $3,652,071 $86,533 b 54,285,743
-546,118
Greenlawn Extension Front Louis Henna Blvd to IH 35 Frontage Road
$547,139 e
Greenlawn Interchange At IH 35 Construct Greenlawn Interchange with IH 35 Not Scheduled $0 512 000 000 a 512 000 000-
IH 35 Turnarounds FM 1325/Louis Henna/Hesters Crossing Construct frontage road turnarounds Completed $3,533,562 E3,3175,00000 c,0 a
$7,036,562
528
IH 35 Area ImprovementsRelocate ramps,widen frontage road,and Fall 2005 510.269,090 54,042,766 a
front Westinghouse Road to FM 1431 construct frontage road turnaround $14,311,856
IH 35 Frontage Rd C-0 and Hester's Crossing Construct Frontage road collector-distributor and Fall 2007
Bridge Replacement tH 35 @ Hester's Crossing replace Hester's Crossing Bridge 39,780,000 59,780,000
Feasibility Study IH-35 Aitemaoves to alleviate congestion W $92,203 587400A-35 8 RM 620 and IH 35&US 79 S4 803
Construct 4-lane divided roadway Fall 2005 $2,235,610 $2,235,610
535.610
Oakmont Dave(Arterial'S') From Terawsta to Chandler Road
Puma StrategiesAssist City in interagency coordination for SH 45 N/A S52,326 ' 552626-
Construct 2-lane Oividetl roadway Fall 2004 $7,195,%2 57,195,%2
$551,256 $48,000
Red Bud Lane(CR 122.Phases 1 8 2) From Gattis School Road to CR 123
PSB E Design set-aces;Construct 5-lane section,Spring 2006 5617.363 $0 5617,363 5340.
Bridge,Railroad crossing $3,375,909 5140,264 53,516,173 �
Red Bud Lane(CR 122,Phase 3) Front CR 12310 US 79
RM 620 Construct railroad grade separation FY 2008 52,500,000 $8,500,000 a 511.000,000
at Union Pacific Railroad
SH 45 Round Rock East City Limits to Round Rock West Acquire ROW for SH 45 Dry 2000
$31,378,911 5215.200.000 a 5272,578,911
City Limits
526.000,000 d
Redo n streets,wader streets,extend streets $4.769,633 August 2000 8 FY (est)
South Street Improvements nth Mays shoat Dell Way.Galls school Road 9 $21,465 a 54.791,098 -5110,367
Sou
Extension 8 Ddlway/Boardwalk Connection 2001
Traffic Signals Design and construct traffic signals On-going $2,230,000 52,230,000
Various locations
Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH 35/RM 620 US 79 signal nstsystemsct andlrtplemenl coordinated traffic Complete0 599.597 $99,597
-5403
—
US 79 Reconstructwayompleted $2,285,892 $3500000 a highway to 4 lane divided high C , ,
From CR 195 to CR 110 $6.085,892 -590,000
$300,000(est)
Construct 4-lane divided highway d
US 79 From FM 146010 CR 195 9 y Winter 2005 59,012,745 $3,000,000 a $12,012,745
Construct 4-lane divided roadway Fall 2005 $1,250,000 $1,250,000
Teravisla From IH-35 to Oakmont Drive
Transportation Consulting Miscelb^sous consulting work in support of N/A 5336.351 5306,351 transportation program -535.610
Arterial T Construct hall of a 4-lane52,000000
divided roadway Fall 2006 52,000.000 ' ,
From University Blvd to CR 112 $2,000.000
.;:J •,a,,, _LL..,,. a'H.3Ra S13a,583;735i -5292 Seee:3g92f'�a.51di�➢pis.3�ld00
LEGEND
a=State/Federal Fund Page 1 of 1
b=Private
ExHIBIT A Amendment alb
c-GO 8 CO Transportation Updated 9/28/08
d=Williamson County
e-City Utility Fund