Loading...
4B-R-06-05 - 9/28/2006 RESOLUTION NO. 06-05 WHEREAS, the Round Rock Transportation System Development Corporation ( "RRTSDC" ) has previously adopted a Transportation Capital Improvement Plan ( "Plan" ) , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of September, 2006 . ROUND ROCK TRANSPORTATION S TEM DEVELOPMENT CORPORATIv .. Y' B : NYL 9'WEL ., President ATTEST: )Secretary WPFDesktop\::0DMA/WORLDOX/0:/WDOX/RESOLUTI/RRTSDC/0605.WPD/rmc DATE: September 22, 2006 SUBJECT: Transportation System Development Corporation - September 28, 2006 ITEM: 7.A. Consider a resolution approving an amendment to the Transportation Capital Improvement Program (TCIP) to provide funding for a new project and adjust funding for existing projects. This resolution will approve the following amendments to the TCIP. 1. Funding for Arterial "T" in the amount of $2,000,000. The funds are required to construct half of a divided 4-lane lane roadway. The proposed roadway is located between the Texas State University Campus and Seton Hospital from University Blvd to 3,200 feet south of University Blvd. 2. Additional funding for Red Bud Lane Phase 1 and Phase 2 in the amount of $48,000. The funds are required for additional temporary sedimentation control, safety end treatments for culverts, object markers, reflectors, and a driveway widening. The project limits are CR 123 to Gattis School Road. 3. Additional funding for Red Bud Lane Phase 3 in the amount of $340,000. The funds are required for engineering services including scheduling, construction administration and management and a storm sewer revision, asbestos abatement on the existing bridge and temporary railroad signals. The project limits are US 79 to CR 123. Funding for these amendments is $2,388,000.00. TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Project Name Project Limits Work Description Estimated Prior Corporation Additional P Construction Date Other Funding Total Cost Funding Amendment Corporation Funding Corporation Funding g 9 815 This Amendment Preliminaryen ----- -.— Arterial A Front US 79 to Forest Creek Drive and ROW requirements,Protective ROW $1'650'� ' gineenng to establish alignment WA -. purchase Forest Creek Front Double Creek Drive to 800'West of Forest Completed 52,805,345 51,326,513 b $4,190,919 -$200,834 Ridge Subdivision $59,061 e -- Double Creek Drive From Gatos School Rd to MKT ROW Completed $2.731,852 $2,850,000 -$118,148 AW Grimes Blvd(Arterial B) Front US 79 to Louis Henna Blvd Fall 2000 524,642,405 $7,982,701 b 527,%5,723 $386.111 5314,528 c $1,226,089 e Arterial C Front RM 820 to Sam Bess Rd Acquire ROW for Arterial C and construct Summer 2007 SO bicycle/sidewalk facility to access high school and swimming pool Design,purchase right-of-way and construct 4- Winter 2006 $11,698,906 $1,135,895 b $14.047,153 Kiphen Road(CR 113) Front FM 1460 to CR 122 lane divided arterial 5510.000 51.000.000 0 $212,352 e Acquire ROW for highway relocation Completed $600,000 $8,200,000 a S8.B00,000 FM 1460 From US 79 to 1200'N of US 79 Construct 4 lane divided arterial Completed $3,652,071 $86,533 b 54,285,743 -546,118 Greenlawn Extension Front Louis Henna Blvd to IH 35 Frontage Road $547,139 e Greenlawn Interchange At IH 35 Construct Greenlawn Interchange with IH 35 Not Scheduled $0 512 000 000 a 512 000 000- IH 35 Turnarounds FM 1325/Louis Henna/Hesters Crossing Construct frontage road turnarounds Completed $3,533,562 E3,3175,00000 c,0 a $7,036,562 528 IH 35 Area ImprovementsRelocate ramps,widen frontage road,and Fall 2005 510.269,090 54,042,766 a front Westinghouse Road to FM 1431 construct frontage road turnaround $14,311,856 IH 35 Frontage Rd C-0 and Hester's Crossing Construct Frontage road collector-distributor and Fall 2007 Bridge Replacement tH 35 @ Hester's Crossing replace Hester's Crossing Bridge 39,780,000 59,780,000 Feasibility Study IH-35 Aitemaoves to alleviate congestion W $92,203 587400A-35 8 RM 620 and IH 35&US 79 S4 803 Construct 4-lane divided roadway Fall 2005 $2,235,610 $2,235,610 535.610 Oakmont Dave(Arterial'S') From Terawsta to Chandler Road Puma StrategiesAssist City in interagency coordination for SH 45 N/A S52,326 ' 552626- Construct 2-lane Oividetl roadway Fall 2004 $7,195,%2 57,195,%2 $551,256 $48,000 Red Bud Lane(CR 122.Phases 1 8 2) From Gattis School Road to CR 123 PSB E Design set-aces;Construct 5-lane section,Spring 2006 5617.363 $0 5617,363 5340. Bridge,Railroad crossing $3,375,909 5140,264 53,516,173 � Red Bud Lane(CR 122,Phase 3) Front CR 12310 US 79 RM 620 Construct railroad grade separation FY 2008 52,500,000 $8,500,000 a 511.000,000 at Union Pacific Railroad SH 45 Round Rock East City Limits to Round Rock West Acquire ROW for SH 45 Dry 2000 $31,378,911 5215.200.000 a 5272,578,911 City Limits 526.000,000 d Redo n streets,wader streets,extend streets $4.769,633 August 2000 8 FY (est) South Street Improvements nth Mays shoat Dell Way.Galls school Road 9 $21,465 a 54.791,098 -5110,367 Sou Extension 8 Ddlway/Boardwalk Connection 2001 Traffic Signals Design and construct traffic signals On-going $2,230,000 52,230,000 Various locations Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH 35/RM 620 US 79 signal nstsystemsct andlrtplemenl coordinated traffic Complete0 599.597 $99,597 -5403 — US 79 Reconstructwayompleted $2,285,892 $3500000 a highway to 4 lane divided high C , , From CR 195 to CR 110 $6.085,892 -590,000 $300,000(est) Construct 4-lane divided highway d US 79 From FM 146010 CR 195 9 y Winter 2005 59,012,745 $3,000,000 a $12,012,745 Construct 4-lane divided roadway Fall 2005 $1,250,000 $1,250,000 Teravisla From IH-35 to Oakmont Drive Transportation Consulting Miscelb^sous consulting work in support of N/A 5336.351 5306,351 transportation program -535.610 Arterial T Construct hall of a 4-lane52,000000 divided roadway Fall 2006 52,000.000 ' , From University Blvd to CR 112 $2,000.000 .;:J •,a,,, _LL..,,. a'H.3Ra S13a,583;735i -5292 Seee:3g92f'�a.51di�➢pis.3�ld00 LEGEND a=State/Federal Fund Page 1 of 1 b=Private ExHIBIT A Amendment alb c-GO 8 CO Transportation Updated 9/28/08 d=Williamson County e-City Utility Fund