Loading...
4B-R-07-02 - 2/8/2007 RESOLUTION NO. 07-02 WHEREAS, the Round Rock Transportation System Development Corporation ( "RRTSDC" ) has previously adopted a Transportation Capital Improvement Plan ( "Plan" ) , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of February, 2007 . ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION By: MAXWELL, Pre ::;) ATT T: iirL_ y gii-rNO,e ✓, Secretary tr 0:\wdox\RESOLUTI\rrtsdC\0702.WPD/rmC TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Estimated Prior Corporation Additional Project Name Project Limits Work Description Construction Date Corporation Funding Other Funding Total Cost Funding Amendment Corporation Funding #16 This Amendment Preliminary engineering to establish alignment N/A $1,650,000 $1,650,000 Arterial A From US 79 to Forest Creek Drive and ROW requirements.Protective ROW purchase Forest Creek From Double Creek Drive to 800'West of Forest Completed $2,806,345 $1,326,513 b $4,190,919 Ridge Subdlviston $59'061 e Competed $2,731,852 $2,850,000 Double Creek Drive From Gattis School Rd to MKT ROW Fall 2000 $24,442,405 $1,982,701 b 527,965,723 AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd $314,528 51,228,089 e Acquire ROW for Arterial C and construct N/A $0 $0 Arterial C From RM 820 to Sam Bass Rd bicycle/sidewalk facility to access high school and mingpool Design.purchase right-of-way and construct 4- Winter 2006 $11,698.906 81,135,895 b $14,047,153 Kiphen Road(CR 113) Front FM 1460 to CR 122 lane divided arterial $1,000,000 tl $212,352 e Acquire ROW for highway relocation and relocate Fall 2007 $1,100,000 $8,200,000 a $8.800,000 FM 1460 Front US 79 to 1200'N of US 79 City utilities Construct 4 lane divided arterial Completed $3,852,071 $68,533 b $4,285,743 Greenlawn Extension Front Louis Henna Blvd to IH 35 Frontage Road $547,139 e Construct Greenlawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a $12,000,000 Greenlawn Interchange At IH 35 IH 35 Turnarounds FM 1325houis HennaMesteYs Crossing a Construct frontage road turnarounds Comp a Completed $3,533,562 83,175.000 07.036,561 $328,000 Relocate ramps,widen frontage road,and Fall 2005 $10,269,090 $4,042,788 a $14,311,856 IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround IH 35 Frontage Rd GD and 1-lester's Crossing Construct Frontage road collector-distributor and Spring 2007 $9,780,000 $9.780,000 Bridge Replacement IH 35 Q Hester's Crossing replace Hester's Crossing Bridge Alternatives to alleviate congestion N/A $92,203 $87,400r Feasibility Study IH-35 8 RM 820 and IH 35 8 US 79 Construct 4-lane divided roadway Fall 2005 $2,235,610 $2.235,610 Oakmont Drive(Arterial'5') From Teravista to Chandler Road Assist City in interagency coordination for SH 45 Completed $52,326 - $52,326 Prime Strategies Construct 2-lane divided roadway Fall 2004 $1,195,962 $1,195,962 $48,000— Red Bud Lane(CR 122.Phases 1 8 2) From Gattis School Road to CR 123 -PS8 E Design services;Construct 5-lane section. Fall 2006 $617,383 $0 $617,363 $340,000 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crossing $3,375,909 $140.264 $3,516,173 Construct railroad grade separation FY 2008 $2,500,000 $8.500,000 a $11,000,000 RM 820 At Union Pacific Railroad Round Rock East City Limits to Round Rack West Acqure ROW for SH 45 FY 2000 $31,378,911 ' $215,200,000 a $272.576.911 SH 45 City Limits $28,000,000 d (es1) _ South Mays Street,Dell Way,Oaths School Road Realign streets,widen streets,extend streets Completed $4,789,833 $21,465 a $4.791,0g9 South Mays Street Improvements Extension 8 Dellway/Boardwalk Connection Design and construct traffic signals On-going $2,230,000 $2,230,000r- Traffic Signals Various locations Construct and implement coordinated traffic Completed $99,597 $99,597 Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH 35/NM 620 US 79 signal systems Reconstruct highway to 4 lane divided highway Competed $2,285,892 $3,500,000 a $6,055,892 US 79 From CR 195 to CR 110 5300,000(esl) d Construct 4-lane divided highway Winter 2005 $9,012,745 $3,000,000 a 512,012,745 U579 From FM 1460 to CR 195 Construct 4-lane divided roadway Fall 2005 $1,250,000 $1,250,000 Teravista From IH-35 to Oakmont Drive Miscellaneous consulting work in support of On-going $658,351 $656,351 -_... .. Transportation Consulting transportation programs and planning Construct half of a 4-lane divided roadway Spring 2007 $2,000.000 $2,000,000 $2,000,000 Arterial T From University Blvd to CR 112 TOTAL 0135.413 733 $292.298.306 8427,325,384i $2,388,000 5850.000 LEGEND rr Page 1 of 1 b=State/FederalPrivat Fund ExHIBIT IT ' '/ AmendmentUpdated #107 c-GO 8 CO Transportation d=Williamson County e-City Utility Fund DATE: February 6, 2007 SUBJECT: Transportation System Development Corporation Board Meeting - February 8, 2007 ITEM: 7.A. Consider a resolution approving an amendment to the Transportation Capital Improvement Program (TCIP) to adjust funding for existing projects. Department: Transportation Services Staff Person: Thomas G. Martin, P.E., Director Justification: The following amendments to the TCIP are being considered: 1. Provide additional funding for A.W. Grimes Boulevard Phase 2 for $550,000. The funds are required for projected contractor claims associated with delays caused by the Union Pacific Railroad. The project limits are US 79 at FM 1460 to Lake Creek. 2. Provide additional funding for FM 1460 for $500,000. The funds are required for relocating and removing City utilities prior to widening FM 1460 by the Texas Department of Transportation. The project limits are Old Settlers Blvd. to 0.9 miles north of US 79. 3. Provide additional funding for the IH 35 Frontage Road Collector/Distributor and Hester's Crossing Bridge Replacement Project for $9,000,000. The funds are required to fully fund the City's portion of the project. 4. Provide additional funding for Transportation Consulting in the amount of $350,000. The funds are required to prepare the 10-year update to the Transportation Master Plan and increase the available budget for general transportation consulting. Funding: Cost: $ 10,400,000 Source of funds: 4B-Round Rock Transportation System Development Corporation Outside Resources: N/A Background Information: The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the 1/2 cent sales tax established for the purpose of transportation system improvements that support economic development. Public Comment: Public hearing held on February 8, 2007 by the Round Rock Transportation System Development Corporation.