Loading...
4B-R-09-02 - 1/22/2009 RESOLUTION NO. 09-02 WHEREAS, the Round Rock Transportation System Development Corporation ( "RRTSDC" ) has previously adopted a Transportation Capital Improvement Plan ( "Plan" ) , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of January, 2009 . ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION By: lX 1e l.--- ALAN MCGRAW, President ATTE : • 10e , Secretary 0.\WDOX\RESOLUTI\rrtsdc\0902.DOC/rmc TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Wrolaol tarns Ptolooi Lhnflt 1VlrlN DeesrtpUse Coffsrrgdtlon hate ,Esti rotbn Qthar F1xKNn$ TOW Coot Prior en Ing' n ordpn port - E,, ,rw iS, S , 1: `'F k -.� filhfNMt 2''; <w.' ,� ,, AmwWmar68,0 lfhondln9AS Prel ins y engineernp to establish 1 gnment Summer 2008 $21818 000 $21 B18.003 $19.768 000 $400,000 Arterial A From Joe DiMaggro Boulevard to 1000 feet south and ROW equirementa. P,S.B E Construction of US 79 of Ralroad overpass.Protective ROW purchase From Old Settlers Boulevard to approximately Design.purchase right-ol-way and construct 4- Winter 2009 $3,550.000 $3.550,000 Arterial M lane divided erteriel Jefferey Way Acquire ROW for Arterial C and construct N/A $0 $0 Arterial C From RM 620 to Sam Bass Rd bicycle/sidewelkfacility to access high school and swim mina pool Design,purchase right-of-way and construct 4- Winter 2006 $12,898.314 $1,135,895 b $14,034,209 Old Settler's Blvd./Kiphen Road(CR 113) From FM 1460 to CR 122 lane divided erteriel $1,000,000 d $1,000,000 $212,352 a $212,352 Acquire ROW for highway relocation and Fall 2008 $8.562.384 $8,200,000 a $16.762,384 $7,500,000 FM 1460/AW Grimes 900'North of U579 to Old Settler's Blvd. relocate City utilities. Preliminary engineering and final P.S.BE.Construction of MAD 4. Construct Greenlawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a $12,000,000 Greenlawn Interchange At IH 35 Relocate ramps,widen frontage road,and Fall 2005 $10,269,090 $4,042,766 a $14.311.856 IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround IH 35 Frontage Rd C-D end Healer's Crossing Construct Frontage road collector-distributor and Spring 2007 $17,880,000 $17,880.000 Bridge Replacement IH 35 Nester's Crossing replete Healer's Crossing Bridge Construct railroad grade separation FY 2008 $2,500,000 $8,500,000 a 511000,000 RM 620 At Union Pacific Railroad Design and construct traffic signals On-going $4,430,000 E4,430.000 $2,200,000 Traffic Signals Various locations Construct 4-lane divided highway Winter 2005 $9,662,745 $3.000,000 a $12.662.745 $100,000 US 79 From FM 1460 to CR 195 Miscellaneous consulting work in support of On-going $681.351 $681,351 $250.000 Transportation Cowultirg transportation programs and panning Construct half of a 4-lane divided roadway Spring 2009 $5,016.552 $3,000,000 d $0,016,552 $1,616.552 Wyoming Springs Drive From RM 620 to Brightwater Boulevard Design and construct MAD 4 Fall 2009 $2,750.000 $2,750,000 $2,750.000 Red Bud Lane Phase 4 From CR 123 to Woodland Loop Design intersection improvements including dual Fall 2009 $616,000 $616,000 $616,000 US 79 at North Mays 1000 feet in all directions of intersection left turns for ell approaches,signal improvements end pedestrian accomodations Design MAD 4 Spring 2010 $711.000 $711,000 $711,000 Arterial M(M-5) University Boulevard to Chandler Creek tributary Chandler Creek tributaryto CypressDesignSpring 2010 $772,500 $772.500 Arterial M(M-4) Cove MAD4 $772,500 (includes Midge) Cypress Cove ExtensionC Design MAO 4 Spring 2010 $235,000 $235.000 ypreea Boulevard to Arterial M $235,000 Design intersection improvements including Spring 2010 $535,000 $535,000 $535,000 South Mays at Gallia School Road 1000 feet in all directions of intersection turns lanes,signal improvements and Dedeabian accomodations Design MAD 4 Spring 2010 $776.000 $776.000 $776,000 Arterial L-2 From Artonal M to the north IH-35 frontage road Arterial M(M-3) Cypress Cove extension to Pelome Design MAD 4 Spring 2010 $1,289,000 E1,289.000 $1,209.000 Design MAD 4 Spring 2010 $910,000 $910.000 $910,000 FM 3406 Chisholm Trail to Creekbend Boulevard Design MAD 4 Spring 2010 $350,000 • $350,000 $350,000 AW Grimes Boulevard From Louis Henna to the southern ETJ Total Current Projects $106,212,936 $41,091,013 $147.303,949 $29,568,000 $11,211.052 $334,080,296 S0 -$1,809,125 (see page 2)Total Competed Projects E80,435,135 $253.645,161 }} LEGEND . EGEND a=State/Federal Fund APage 1 of 2 en b=Private mdment#22 c-GO 8 CO Transportation Updated 01.02-09 d=Williamson Canty EXHIBIT e-City Utility Fund IIAII TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Estimated Prior Corporation Additional Project Name Project Limits Work Description Construction Date Corporation Other Funding Total Cost Funding FundlCorporation Funding Amendment 821 men Actor q 7hb Adment COMPLETED PROJECTS From Double Creek Drive to 800'Wee of Forest Completed 52.805,712 $1,326,513 b $4.132,225 560,065 Forest Creek Ridge Subdivision $59,061 a $59,061 Completed $2,731,852 $2.731.852 Double Creek Drive From Gatlin School Rd to MKT ROW Completed 524,572.768 51,982.701 b $26,555,469 AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd 8140 gag r. 5140 POP 51,313,217 e $1,313.217 Construct 4 lane divided arterial Completed 53,633,868 $86,533 b $3,720,401 Greenlawn Extension From Louis Henna Blvd to Ili 35 Frontage Road $547,139 a $547,139 Construct frontage road turnarounds Completed $3,533,562 $3,175,000 a $6,708,582 IN 35 Turnarounds FM 1325/Louis Henna/Nester's Crossing $328,000 c $328.000 Alternatives to alleviate congestion N/A $92,203 592,203 Feasibility Study IH-35&RM 620 and IN 35&US 79 Construct 4-lane divided roadway Fall 2005 $1,660.169 51,660.169 -5575,441 Oakmont Drive(Arterial"S") Front Teravista to Chandler Road Construct 4-lane divided roadway Fell 2005 51,249,590 $1,249,590/ -$410 Teravista Front IH-35 to Oakmont Drive Construct half of a 4-lane divided roadway Spring 2007 $1,191,392 $1,191,392 -$808,608 Arterial T From University Blvd to CR 112 Assist City in interagency coordination for SH 45 Completed 552,328 $52,326 Prime Strategies Construct 2-lane divided roadway Completed 51,162,071 $1,162,071 Red Bud Lane(CR 122.Phases 1 8 2) From Gettis School Road to CR 123 PS8 E Design services;Construct 5-lane Completed $617,363 $0 $617,363 Red Bud Lane(CR 122,Phase 3) Front CR 123 to US 79 section.Bridge.Railroad crossing 52,591,178 -$344,467 $2,246,711 -$484,731 South Mays Street,Dell Way.Gatos School Road South Mays Street Improvements Realign streets.widen streets,extend streets Completed 54,720,270 $21,465 a $4,741,735 Extension 8 OBllway/Boardwalk Connection Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH 35/RM 620 US Construct end implement coordinated traffic Completed $99,597 599,597 79 signal systems Reconstruct highway to 4 lane divided highway Completed $2,285,892 $3,500,000 a 55,785.892 US 79 Front CR 195 to CR 110 5300,000(est) 5300,000 Round Rock East City Lands to Round Rock West Acquire ROW for SH 45 Completed $27,435,322 $215,200.000 a $242,635,322 SH 45 CityLimits E28,000,000 tl E28.000,000 (est) etkrfq. " ,,,.. Total Completed Projects ,,$80,435,135 :S253,845,161 ,..„$334,080,296 $0. -61,809,125 ` LEGEND Page 2 of 2 a=State/Federal Fund Amendment#21 b=Private Updated 03-24-08 c-GO 8 CO Transportation d=Williamson County e-City Utility Fund 2 DATE: January 15, 2009 SUBJECT: Transportation System Development Corporation—January 22, 2009 ITEM: 7A2. Consider a resolution approving an amendment to the Transportation Capital Improvement Program (TCIP) to adjust funding for existing and proposed projects. Department: Transportation Services Staff Person: Tom Martin, P.E., Transportation Services Director Justification: Public testimony is required prior to considering the following amendments to the TCIP: 1. Provide funding to reimburse Behren's Ranch for their portion of Wyoming Springs Drive in the amount of$1,616,552.00. 2. Provide funding for Arterial A in the amount of $400,000; these funds are to be used for contingency on this project. 3. Provide funding in the amount of $60,065.00 for AT&T fiber optic relocation completed during the Forest Creek project. 4. Provide funding for North Mays Extension (Arterial "M") Section M-3 in the amount of $1.289 million; these funds are required to fully fund design of this project. The project limits are from the extension of Cypress Cove to Paloma Drive. 5. Provide funding for North Mays Extension (Arterial "M") Section M-4 in the amount of $772,500; these funds are required to fully fund design of this project. The project limits are from the Chandler Creek Tributary to Cypress Cove (Arterial "L"). 6. Provide funding for North Mays Extension (Arterial "M") Section M-5 in the amount of $711,000; these funds are required to fully fund design of this project. The project limits are from University Drive to the Chandler Creek Tributary. 7. Provide funding for Cypress Cove (Arterial "L") in the amount of $235,000; these funds are required to fully fund design of this project. The project limits are from the North Mays Extension to Cypress Boulevard. 8. Provide funding for Arterial "L" in the amount of$776,000; these funds are required to fully fund design of this project. The project limits are from the north IH-35 frontage road to the North Mays Extension. 9. Provide funding for Red Bud Lane in the amount of$2.75 million. The funds are required to fully fund design, right-of-way acquisition, utility relocation, and construction. The project limits are from C.R. 123 to Woodland Loop. - CONTINUED ON NEXT PAGE - 10. Provide funding for the design of intersection improvements at the North Mays/US 79 intersection in the amount of$616,000. 11. Provide funding for the design of intersection improvements at the South Mays/Gattis School Road intersection in the amount of$535,000. 12. Provide funding for A.W. Grimes Boulevard in the amount of $350,000; these funds are required to fully fund the design of this project. Project limits are from Louis Henna to the southern ETJ. 13. Provide funding for FM 3406 in the amount of $910,000; these funds are required to fully fund the design of this project. Project limits are from Chisholm Trail Road to Creek Bend. 14. Provide funding for professional consulting services in the amount of $250,000. These funds are required to perform preliminary engineering work on various projects throughout the City. 15. Reduction to actual expenses for the following projects: e. Red Bud Lane Phase 3, ($484,731.00) f. Oakmont, ($575,441.00) g. Tera Vista, ($410.00) h. Arterial T (Seton Parkway), ($808,608.00) Funding: Cost: $9,401,927.00 Source of funds: 4B-Round Rock Transportation System Development Corporation Outside Resources: N/A Background Information: The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the %2 cent sales tax established for the purpose of transportation system improvements that support economic development. Public Comment: Public hearing held on January 22, 2008 by the Round Rock Transportation System Development Corporation.