Loading...
4B-R-09-05 - 7/9/2009 RESOLUTION NO. 09-05 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan" ) , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of July, 2009 . ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION By: ALAN MCGRAW, President ATTEST: t., f_, IZS ►C[LI Secretary 0:\wdox\SCC1nts\0112\0905\MUNICIPAL\0905.DOC/rmc TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION • Estimated Prior Corporation Additional Project Name Project Limits Work Description Construction Date Corporation Other Funding Total Cost Funding Corporation Funding Amendment#24 Funding This Amendment#25 Preliminary engineering to establish alignment Summer 2008 f $21,818,000 $21,818.000 Arterial A From Joe DiMaggio Boulevard to 1000 feet south and ROW requirements. P.S.B E.Construction of US 79 of Railroad overpass. Protective ROW purchase From Old Settlers Boulevard to approximately Design,purchase right-of-way and construct 4- Winter 2008 53,550,000 53.550,000 Arterial M Jefferey Way lane divided arterial Conduct preliminary engineering,develop right of $486,000 $486,000 $486,000 Arterial C From RM 620 to Sam Bass Rd way map and acquire ROW for Arterial C at the intersection of RM 620 and Deepwood Drive Design,purchase right-of-way and construct 4- l Winter 2006 $12,898,314 $1,135,895 b $14,034,209 Old Settler's Blvd./Kiphen Road(CR 113) From FM 1480 to CR 122 lane divided arterial $1,000,000 d 51,000,000 $212,352 e $212,352 Acquire ROW for highway relocation and relocate Fall 2008 $8,562,384 $8,200,000 a $16,762,384 FM 1460/AW Grimes 900'North of US79 to Old Settler's Blvd. City utilities. Preliminary engineering and final P,S.BE. Construction of MAD 4. Relocate ramps,widen frontage road,and Fall 2005 $10,269,090 $4,042,766 a S14,311,856 IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround IH 35 Frontage Rd C-D and Hester's Crossing Construct Frontage road collector-distributor and Spring 2007 $17,880,000 $17,880,000 Bridge Replacement IH 35 6 Heater's Crossing replace Hester's Crossing Bridge Construct railroad grade separation 'FY 2008 $2,500,000 $8,500,000 a $11,000,000 RM 620 At Union Pacific Railroad Design and construct traffic signals On-going $4,650,000 $4,850,000 $220,000 Traffic Signals Various locations Construct 4-lane divided highway Winter 2005 $9,662,745 $3,000.000 a $12,662,745 US 79 From FM 1460 to CR 195 Miscellaneous consulting work In support of On-going $906,351 Transportation Consulting transportation programs end planning $906,351 Construct half of a 4-lane divided roadway Spring 2009 $5,016,552 $3,000,000 d $8,016,552 Wyoming Springs Drive From RM 620 to Brightwater Boulevard Design and construct MAD 4 Fall 2009 $2,750,000 $2,750,000 Red Bud Lane Phase 4 From CR 123 to Woodland Loop Design Intersection improvements including dual Fell 2009 $120,000 $120,000 -$496,000 US 79 et North Mays 1000 feet in all directions of intersection left turns for all approaches,signal improvements and pedestrian accomodations Design MAD 4 Spring 2010 $711,000 $711,000 Arterial M(M-5) University Boulevard to Chandler Creek tributary Arterial M(M-4) Chandler Creek tributary to Cypress Cove Design MAD 4 Spring 2010 $772,500 $772,500 Sncludes bridge) Design MAD 4 'Spring 2010 $235,000 $235,000 Cypress Cove Extension Cypress Boulevard to Arterial M Design intersection improvements Including turns Spring 2010 $535,000 $535,000 South Mays at Gattls School Road 1000 feet in all directions of Intersection lanes,signal Improvements end pedestrian accomodatlons Design MAD 4 'Spring 2010 $776,000 $776,000 Arterial L-2 From Arterial M to the north IH-35 frontage road Design MAD 4 Spring 2010 $1,289,000 $1,289,000 Arterial M(M-3) Cypress Cove extension to Paloma Design MAD 4 Spring 2010 $910,000 $910,000 FM 3406 Chisholm Trail to Creekbend Boulevard Design MAD 4 Sprang 2010 $350,000 $350,000 AW Grimes Boulevard From Louis Henna to the southern ETJ EXHIBIT "An 5 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Estimated Prior Corporation Additional Project Name Project Limits Work Description Construction Date Corporation Other Funding Total Cost Funding Corporation Funding Amendment#24 Funding This Amendment#25 Design the extension of Mon Strad over Lake Crook Fell 2010 $1,200.000 $1,200,000 $1,200,000 Main Street Project 1 Main Street extension,IH 35 to San Saba In Iho I1+35 frontage roed,inelades the purchase of nececsery right-of-way Main Street Project 2 Main Street,San Saba to Brown Street Design and construct Main Street to match new Sprang 2010 $2,800,000 $2.800,000 $2.800.000 construction in SWDT. Main Street Project 3 Main Street,Brown to Blair Street Design and construct Main Street to match new Spring 2010 $1,400,000 $1,400,000 $1,400,000 construction in SWDT. Summer 2010 $216,000 $216,000 S216,000 Main Street Project 4 Main Street,Blair to Mays Design Main Street between Blair and Mays includes the design of a signal at the Mays/Main intersection Round Rock Avenue/Liberty Avenue realignment Liberty Avenue,from Round Rock Avenue to Mays Design the realignment of RR Avenue onto Summer 2010 $748,000 $748,000 $423,000 Project 5 Street. Liberty Avenue;includes the design of a signal at the Liberty/Mays intersection Design and install storm sewer from the Blair/Main Spring 2010 $210,000 $210,000 $210,000 Downtown Storm Sewer Project 7 Blair Street,from Main to Florence Street Street intersection to the Blair Street/Florence Street intersection. Total Current Projects $113,221,936 $29,091,013 $0 $142,312,949 $210,000 $6,249,000 (see page 3)Total Completed Projects $80,827,135 $254,129,892 $334,957,027 $392,000 SO Total TCIP Projects $194,049,071 $283,220,905 $477,289,978 $802,000 $8,249,000 2 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Estimated Prior Corporation Additional Project Name Project Limits Work Description Construction Date Corporation Other Funding Total Cost Funding Corporation • Funding Amendment a24 pFu nding this COMPLETED PROJECTS ' From Double Creek Drive to 800'West of Forest Completed $2,805,712 $1,328,513 b $4,132.225 Forest Creek Ridge Subdivision $59,061 a $59,061 Completed $3,123,852 $3,123,852 $392,000 Double Creek Drive From Gattis School Rd to MKT ROW Completed $24,572,788 $1,982,701 b $26355,469 AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd 8144 AAA r. A149 AAA $1,313,217 a $1,313,217 Construct 4 lane divided arterial Completed $3,633,868 $86,533 b $3,720,401 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road $547,139 e 6547,139 Construct frontage road turnarounds Completed $3,533,562 $3,175,000 a $6,708,562 IH 35 Turnarounds FM 1325/Louis Henna/Hester's Crossing $328,000 c $328,000 Alternatives to alleviate congestion N/A $92,203 $92,203 Feasibility Study IH-35 8 RM 620 and IH 35 8 US 79 Construct 4-lane divided roadway Fall 2005 $1,660,169 $1,660,169 Oakmont Drive(Arterial"S") From Teravista to Chandler Road Construct 4-lane divided roadway Fell 2005 $1,249,590 $1,249,590 Teravista From IH-35 to Oakmont Drive Construct hell of a 4-lane divided roadway Spring 2007 $1.191,392 $1,191,392 Arterial T From University Blvd to CR 112 Prime Strategies Assist City in interagency coordination for SH 45 Completed $52,326 $52,326 Construct 2-lane divided roadway Completed $1,162,071 $1,162,071 Red Bud Lane(CR 122,Phases 1&2) From Gattis School Road to CR 123 PSS E Design services;Construct 5-lane section,Completed $617,363 $0 $617,363 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crossing $2,591,178 $140,264 $2,731,442 South Mays Street,Dell Way,Gattis School Road Realign streets,widen streets,extend streets Completed $4,720.270 $21,465 e $4,741.735 South Mays Street Improvements Extension 8 Dellway/Boardwalk Connection Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH 35/RM 620 US 79 Construct and Implement coordinated traffic Completed $99,597 $99,597 signal systems US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane divided highway Completed $2,285,892 $3,500,000 a $5,785,892 $300,000 (est) $300,000 Acquire ROW for SH 45 Completed $27,435,322 $215,200,000 a $242,635,322 SH 45 Round Rock East City Limits to Round Rock West City Limits S26,000,000 d $26,000,000 (est) Total Completed Projects $80,827,135 $254,129,892 $334,957,027 $392,000 $0 LEGEND a•State/Federal Fund Amendment#25 b•Private Updated 07-02-09 c-GO 8 CO Transportation d•Williamson County e-City Utility Fund 3 DATE: July 2, 2009 SUBJECT: Transportation System Development Corporation—July 9, 2009 ITEM: 6A. Consider a resolution approving an amendment to the Transportation Capital Improvement Program (TCIP)to adjust funding for existing and proposed projects. Department: Transportation Services Staff Person: Tom Word, P.E., Chief of Public Works Operations Justification: Public testimony is required prior to considering the following amendments to the TCIP (please reference the attached map for project locations): A. Provide funding for Project 1 in the amount of$4,100,000 to design the Main Street extension between the IH-35 north frontage road and San Saba. B. Provide funding for Project 2 in the amount of$2,800,000 to design and construct Main Street between San Saba and Brown Street. C. Provide funding for Project 3 in the amount of$1,400,000 to design and construct Main Street between Brown Street and Blair Street. D. Provide funding Project 4 in the amount of$1,700,000 to design and construct Main Street between Blair Street and Mays Avenue. E. Provide funding for Project 5 in the amount of$3,250,000 to design and construct the realignment of Round Rock Avenue onto Liberty Avenue. This project would include the removal of existing Round Rock Avenue between Brown Street and Mays Avenue. F. Provide funding for Project 7 in the amount of$210,000 to design and construct storm sewer improvements along Blair Street between Main Street and Florence Street;this project would provide storm sewer for the Main Street improvements. Funding: Cost: $13,460,000.00 Source of funds: 4B-Round Rock Transportation System Development Corporation Outside Resources: N/A Background Information: The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the%cent sales tax established for the purpose of transportation system improvements that support economic development. Public Comment: Public hearing held on July 9, 2009 by the Round Rock Transportation System Development Corporation.